X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-089-26128

Well Details

Well ID: 34-089-26128
Loading map...
Country: United States
State: Ohio
County: Licking
Municipality: St. albans Township
Operator Name: KNOX ENERGY INC.
Well Pad ID:
Farm/Lease Name: DONAHEY R
License Status: Producing
License Date: 2013-04-15
Spud Date: 2013-05-28
Spud Drilling Contractor: KILBARGER DRLG
Final Drill Date: 2013-06-01
Well Total Depth: 2041 ft
Configuration: Vertical
Latitude: 40.100795564
Longitude: -82.64619579

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2013-04-15 Proposed Formations:BEREA THRU CLINTON, Issued Date:4/15/2013, Expired Date:4/15/2015 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2013-06-01
Completion Report Received 2013-08-30
Construction Permit Expires 2015-04-15
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2013-09-06 1935 1942 15

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2013-06-14 H2O 0 40000 Gal 20000 Producers Service Corporation Producers Service Corp. on location to frac the Donahey #4 for Knox Energy. Bill Mitton was on location for Knox Energy.

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2013 KNOX ENERGY INC. 0 210 108
2014 KNOX ENERGY INC. 0 532 365
2015 KNOX ENERGY INC. 0 446 365
2016 KNOX ENERGY INC. 0 372 365
2017 KNOX ENERGY INC. 0 281 365
2018 KNOX ENERGY INC. 0 263 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2013 KNOX ENERGY INC. Brine 366 108
2014 KNOX ENERGY INC. Brine 17 365
2015 KNOX ENERGY INC. Brine 5 365
2016 KNOX ENERGY INC. Brine 5 365
2017 KNOX ENERGY INC. Brine 0 365
2018 KNOX ENERGY INC. Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0078471032 2013-11-25 Preliminary Restoration No Violations This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. A GPS reading was taken at the wellhead. The well is located in an agricultural field. The area around the well has been restored. The tank battery consists of (1) 210 barrel tank and (2) 100 barrel tanks inside an earthen dike. A GPS reading was taken at the tank battery location. This well shares the tank battery with p# 3646. Identification posted at wellhead and tank battery. Inspection meets ORC 1509.072 requirements. Weather: 22 degrees F, Clear
0573694346 2013-06-07 Drill / Deepen / Reopen No Violations Bill Mitton with Knox Energy called to inform me that the backside of the 8 surface casing had caved in approximately 15 feet down. He was called in a cement mixer to grout the backside of the casing from the surface with 9 sack grout. I witnessed this job and cement stayed at the surface.
0731355902 2013-06-14 Production Wells No Violations I witnessed this frac job for Knox Energy. Producers Service Corp. was contracted to frac this well. Refer to stimulation report for details.
0790746894 2013-07-16 Preliminary Restoration No Violations I inspected this well location today. The well was equipped with a pumping unit and motor. The well was pumping during inspection. The drilling pits were open. Knox Energy will be closing the pits this week.
1278379918 2013-05-30 Drill / Deepen / Reopen No Violations I witnessed the cementing of the 8 inch surface casing for Knox Energy on Kilbarger rig 5. Bill Mitton with Knox Energy was on location. Petroset Cementing was contracted to cement the casing. Circulation was established. Partial cement returns were observed. A cement basket was not installed.
1372869555 2013-05-31 Drill / Deepen / Reopen No Violations I inspected drilling operations today. Kilbarger rig #5 drilling on air with 7.88 bit. Depth approximately 1,680 feet during inspection. No violations this date.
1435228971 2013-07-16 Preliminary Restoration No Violations This inspection was conducted as a preliminary restoration status check. The well was equipped with a pumping unit and motor. The pits used during drilling have not been closed. Knox Energy will be closing the pits this week .
1599051356 2013-05-29 Drill / Deepen / Reopen No Violations I inspected drilling operations today. Kilbarger rig 5 drilling on fluid during inspection. Depth was approximately 287 feet. No violations this date.

For data sources see[9]

References