If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-059-27060 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.913169,"lon":-80.244128,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Greene | |
Municipality: Franklin Township | |
Operator Name: RICE DRILLING B LLC | |
Well Pad ID: 150450 | |
Farm/Lease Name: PATTON 8H | |
License Status: Active | |
Spud Date: 2016-06-27 | |
Permit Date: 2016-01-29 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 39.913169 | |
Longitude: -80.244128 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2016-11-20 | 2016-12-03 | 7995 | 11,028,900.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Other Chemical(s) | Listed Above | See Trade Name(s) List | Water | 7732-18-5 | 65 | 0.000329854 | 343.03 |
Cationic Copolymer of acrylamide | 69418-26-4 | 30 | 0.0121547 | 12640.2 | ||||
Ethylenediaminetriaceticacid, trisodium salt | 19019-43-3 | 0.8 | 0.00000406 | 4.222 | ||||
Trisodium Nitrilotriacetic acid | 5064-31-3 | 2 | 0.00001015 | 10.555 | ||||
Water | 7732-18-5 | 40 | 0.0117488 | 12218.1 | ||||
Polyalkylene glycol | Proprietary | 10 | 0.000124379 | 129.348 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.000373138 | 388.043 | ||||
Acrylamide Polymer | Proprietary | 30 | 0.00881159 | 9163.56 | ||||
Organic amine resin salt | Proprietary | 30 | 0.000373138 | 388.043 | ||||
Aromatic aldehyde | Proprietary | 30 | 0.000373138 | 388.043 | ||||
Ammonium acetate | 631-61-8 | 10 | 0.0029372 | 3054.52 | ||||
Dodecylbenzenesulfonic acid | 27176-87-0 | 5 | 0.00001376 | 14.312 | ||||
Sodium glycolate | 2836-32-0 | 1.5 | 0.00000761 | 7.916 | ||||
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.0014686 | 1527.26 | ||||
2-Propanol | 67-63-0 | 10 | 0.00002752 | 28.623 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.0014686 | 1527.26 | ||||
Alcohols, ethoxylated | 68439-50-9 | 5 | 0.0014686 | 1527.26 | ||||
Dimethylformamide | 68-12-2 | 10 | 0.000124379 | 129.348 | ||||
Water | 7732-18-5 | 90 | 0.000247715 | 257.61 | ||||
Sodium formate | 141-53-7 | 0.6 | 0.00000304 | 3.166 | ||||
Quarternary ammonium compound | Proprietary | 10 | 0.000124379 | 129.348 | ||||
Sodium Hydroxide | 1310-73-2 | 2 | 0.00001015 | 10.555 | ||||
Alcohols, C-12-16, ethoxylated | 68551-12-2 | 5 | 0.00202578 | 2106.7 | ||||
Iminodiacetate disodium salt | 17593-73-6 | 0.2 | 0.00000101 | 1.055 | ||||
Water | 7732-18-5 | 30 | 0.00479061 | 4981.97 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.00798435 | 8303.27 | ||||
K-BAC 1020 DBNPA | WST | Bacteriacide | 2,2-Dibromo-3-nitrilopropionamide | 10222-01-2 | 21 | 0.00335343 | 3487.38 | |
Water | 7732-18-5 | 30 | 0.00479061 | 4981.97 | ||||
Polyethylene glycol | 25322-68-3 | 50 | 0.00798435 | 8303.27 | ||||
NE-100 | FTSI | Non-emulsifier | Dodecylbenzenesulfonic acid | 27176-87-0 | 5 | 0.00001376 | 14.312 | |
Water | 7732-18-5 | 90 | 0.000247715 | 257.61 | ||||
2-Propanol | 67-63-0 | 10 | 0.00002752 | 28.623 | ||||
2-Butoxyethanol | 111-76-2 | 10 | 0.00002752 | 28.623 | ||||
FE-100L | FTSI | Iron Control | Trisodium Nitrilotriacetic acid | 5064-31-3 | 2 | 0.00001015 | 10.555 | |
Sodium formate | 141-53-7 | 0.6 | 0.00000304 | 3.166 | ||||
Iminodiacetate disodium salt | 17593-73-6 | 0.2 | 0.00000101 | 1.055 | ||||
Water | 7732-18-5 | 65 | 0.000329854 | 343.03 | ||||
Tetrasodium EDTA | 64-02-8 | 41 | 0.000208062 | 216.372 | ||||
Sodium Hydroxide | 1310-73-2 | 2 | 0.00001015 | 10.555 | ||||
Sodium glycolate | 2836-32-0 | 1.5 | 0.00000761 | 7.916 | ||||
Ethylenediaminetriaceticacid, trisodium salt | 19019-43-3 | 0.8 | 0.00000406 | 4.222 | ||||
Hydrochloric Acid (HCl) | FTSI | Acid | Hydrogen Chloride | 7647-01-0 | 15 | 0.0450774 | 46878 | |
Bellasol S50 | BWA | Antiscalant | Phosphinocarboxylic Acid | 110224-99-2 | 60 | 0.00268139 | 2788.5 | |
UFR-47 | Silver Creek Services | Friction Reducer | Cationic Copolymer of acrylamide | 69418-26-4 | 30 | 0.0121547 | 12640.2 | |
Alcohols, C-12-16, ethoxylated | 68551-12-2 | 5 | 0.00202578 | 2106.7 | ||||
Hydrotreated light distillate (petroleum) | 64742-47-8 | 30 | 0.0121547 | 12640.2 | ||||
CI-150 | FTSI | Acid Corrosion Inhibitor | Isopropanol | 67-63-0 | 30 | 0.000373138 | 388.043 | |
Dimethylformamide | 68-12-2 | 10 | 0.000124379 | 129.348 | ||||
Ethylene Glycol | 107-21-1 | 30 | 0.000373138 | 388.043 | ||||
Aromatic aldehyde | Proprietary | 30 | 0.000373138 | 388.043 | ||||
Organic amine resin salt | Proprietary | 30 | 0.000373138 | 388.043 | ||||
Polyalkylene glycol | Proprietary | 10 | 0.000124379 | 129.348 | ||||
Quarternary ammonium compound | Proprietary | 10 | 0.000124379 | 129.348 | ||||
Water | Rice Energy | Carrier/Base Fluid | Water | 7732-18-5 | 100 | 88.5008 | 92,035,900.0 | |
Sand (Proppant) | Silver Creek | Proppant | Silica Substrate | 14808-60-7 | 87 | 9.66254 | 10,048,500.0 | |
FRW-600 | FTSI | Friction Reducer | Alcohols, ethoxylated | 68439-50-9 | 5 | 0.0014686 | 1527.26 | |
Acrylamide Polymer | Proprietary | 30 | 0.00881159 | 9163.56 | ||||
Hydrotreated light distillate | 64742-47-8 | 30 | 0.00881159 | 9163.56 | ||||
Alcohols, ethoxylated | 68551-12-2 | 5 | 0.0014686 | 1527.26 | ||||
Ammonium acetate | 631-61-8 | 10 | 0.0029372 | 3054.52 | ||||
Water | 7732-18-5 | 40 | 0.0117488 | 12218.1 | ||||
Alcohols, ethoxylated | 68002-97-1 | 5 | 0.0014686 | 1527.26 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2016 | VANTAGE ENERGY APPALACHIA II LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2017 | VANTAGE ENERGY APPALACHIA II LLC | 2,134,053.43 | 332 | 0.00 | 0 | 0.00 | 0 |
2018 | RICE DRILLING B LLC | 1,508,089.00 | 347 | 0.00 | 0 | 0.00 | 0 |
2019 | RICE DRILLING B LLC | 2.00 | 1 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2016-M08 | Drill Cuttings (in Tons) RWC 810 | 362.56 Tons | LANDFILL | PAD059087072 |
2016-M08 | Drilling Fluid Waste (in Barrels) RWC 803 | 118.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016-M08 | Drilling Fluid Waste (in Barrels) RWC 803 | 1,859.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 397.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M09 | Drill Cuttings (in Tons) RWC 810 | 111.30 Tons | LANDFILL | PAD059087072 |
2016-M09 | Drilling Fluid Waste (in Barrels) RWC 803 | 166.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016-M09 | Drilling Fluid Waste (in Barrels) RWC 803 | 199.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 132.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016-M09 | Other Oil & Gas Wastes (in Tons) RWC 899 | 88.00 Tons | REUSE OTHER THAN ROAD SPREADING | |
2016-M10 | Drilling Fluid Waste (in Barrels) RWC 803 | 81.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016-M10 | Drilling Fluid Waste (in Barrels) RWC 803 | 13.38 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016-M10 | Drilling Fluid Waste (in Barrels) RWC 803 | 59.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 108.00 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2016-M10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 169.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M12 | Drilling Fluid Waste (in Barrels) RWC 803 | 20.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2016-M12 | Drilling Fluid Waste (in Barrels) RWC 803 | 604.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016-M12 | Fracturing Fluid Waste (in Tons) RWC 805 | 13.17 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2016-M12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 88.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2016-M12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 276.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2016-M12 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 164.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M01 | Drilling Fluid Waste (in Barrels) RWC 803 | 7.27 Bbl | REUSE (AT WELL PAD) | |
2017-M01 | Filter Socks (in Tons) RWC 812 | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017-M01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 110.75 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M01 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 26.82 Bbl | REUSE (AT WELL PAD) | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 37.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 0.87 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 682.76 Bbl | REUSE (AT WELL PAD) | |
2017-M01 | Produced Fluid (in Tons) RWC 802 | 12.75 Tons | LANDFILL | 100172 |
2017-M01 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 2.12 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M01 | Synthetic Liner Materials (in Tons) RWC 806 | 7.54 Tons | LANDFILL | 100663 |
2017-M01 | Waste Water Treatment Sludge (in Tons) RWC 804 | 2.50 Tons | RESIDUAL WASTE PROCESSING FACILITY | 2014-541 |
2017-M01 | Waste Water Treatment Sludge (in Tons) RWC 804 | 1.68 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M02 | Filter Socks (in Tons) RWC 812 | 0.00 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 1.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 36.56 Bbl | REUSE (AT WELL PAD) | |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 21.82 Bbl | REUSE (AT WELL PAD) | |
2017-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 18.07 Bbl | REUSE (AT WELL PAD) | |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 75.36 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 257.41 Bbl | REUSE (AT WELL PAD) | |
2017-M04 | Filter Socks (in Tons) RWC 812 | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 29.60 Bbl | REUSE (AT WELL PAD) | |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 193.19 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 20.41 Bbl | REUSE (AT WELL PAD) | |
2017-M05 | Filter Socks (in Tons) RWC 812 | 0.04 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 25.59 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M05 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 14.02 Bbl | REUSE (AT WELL PAD) | |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 176.47 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 1,411.84 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 487.01 Bbl | REUSE (AT WELL PAD) | |
2017-M06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 77.96 Bbl | REUSE (AT WELL PAD) | |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 227.49 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 68.90 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 1,641.57 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 90.84 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 10.46 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 336.50 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Synthetic Liner Materials (in Tons) RWC 806 | 0.39 Tons | LANDFILL | 100663 |
2017-M07 | Waste Water Treatment Sludge (in Tons) RWC 804 | 2.17 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 6.87 Bbl | REUSE (AT WELL PAD) | |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 391.78 Bbl | REUSE (AT WELL PAD) | |
2017-M08 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.08 Tons | RESIDUAL WASTE PROCESSING FACILITY | 301280 |
2017-M08 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.54 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.45 Bbl | REUSE (AT WELL PAD) | |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 69.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 9.80 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW010 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 10.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 9.82 Bbl | REUSE (AT WELL PAD) | |
2017-M09 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 0.54 Tons | LANDFILL | CID # 28726 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 9.73 Bbl | REUSE (AT WELL PAD) | |
2017-M10 | Produced Fluid (in Tons) RWC 802 | 0.40 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 39.96 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 9.58 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 10.00 Bbl | REUSE (AT WELL PAD) | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 9.09 Bbl | RESIDUAL WASTE PROCESSING FACILITY | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 10.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123NW009 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 40.61 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 68.59 Bbl | REUSE (AT WELL PAD) | |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 280.18 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 180.33 Bbl | REUSE (AT WELL PAD) | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 97.52 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 78.70 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 9.09 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 38.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 192.24 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 112.80 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 16.18 Bbl | REUSE (AT WELL PAD) | |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 19.78 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 19.68 Bbl | REUSE (AT WELL PAD) | |
2018-M07 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 11.82 Bbl | REUSE (AT WELL PAD) | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 37.36 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 47.27 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 21.26 Bbl | REUSE (AT WELL PAD) | |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 23.95 Bbl | REUSE (AT WELL PAD) | |
2018-M10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 47.27 Bbl | REUSE (AT WELL PAD) | |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 35.22 Bbl | REUSE (AT WELL PAD) | |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 13.93 Bbl | REUSE (AT WELL PAD) | |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 11.20 Bbl | REUSE (AT WELL PAD) | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 2.42 Bbl | REUSE (AT WELL PAD) | |
2019-M03 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 33.64 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2465832 | Primary Facility | 2016-03-18 | Administrative/File Review | In Compliance with Policy | An estimated 5 to 10 gallons of brine was released from a breeched T connection within a GPU at the Patton Well Site. The release occurred entirely within containment, therefore no soil or water impacts resulted. The material was removed from containment via a vacuum and in situ testing was conducted to confirm remediation. All associated equipment was replaced and/or repaired. The matter has been determined to be In Compliance with Policy (ICP). No violations are being cited at this time. |
2479212 | Primary Facility | 2016-04-21 | Incident- Response to Accident or Event | No Violations Noted | An estimated 200 gallons of brine was released from a broken site tube on a water truck leaving the Patton Well Site in Franklin Township, Greene County. The release impacted part of the access road between Throckmorton Run and the gate, as well as a few hundred feet of asphalt pavement on Hill School House Road and several areas of compacted gravel berm along the road. Notifications were made, personnel mobilized and the impacted areas remediated.
The failure to contain the brine release is a violation of Title 25 Pa. Code § 91.34(a). The impact to soils resulting from the release of brine is a violation of the Clean Streams Law 35 P.S. § 691.401. |
2498152 | Primary Facility | 2016-06-28 | Drilling/Alteration | No Violations Noted | Well spud on 6/27/2016. Operator drilled 30-inch borehole and set 26-inch conductor pipe at 40 ft. Conductor pipe cemented in place. Operator installing well cellars. |
2498670 | Primary Facility | 2016-06-08 | Compliance Evaluation | No Violations Noted | On Wednesday June 8, 2016, I conducted a compliance evaluation inspection at the Patton Well Site located in Franklin Township, Greene County. The inspection was performed to review remediation work completed in association with an April 21, 2016 brine release in which approximately 200 gallons of brine was released and had impacted the ground surface. |
2511722 | Primary Facility | 2016-08-16 | Drilling/Alteration | No Violations Noted | Operator currently drilling 12 3/8” borehole. Operator drilling ahead @ 1,643’. |
2511725 | Primary Facility | 2016-08-16 | Drilling/Alteration | No Violations Noted | Operator drilled a 17 1/2”-inch borehole to 1,100’ and set 1,078’ of 13 3/8” coal protective casing. Coal protective casing was cemented to the surface by the displacement method on 8/15/16. Operator reported no issues noted during cementing. 10 bbls of cement was circulated to the surface. Floats held. Operator reported base of the Pittsburgh coal seam @ 989’. |
2511726 | Primary Facility | 2016-08-16 | Drilling/Alteration | No Violations Noted | Operator drilled a 24-inch borehole to 460’ and set 439’ of 18 5/8” surface casing. Surface casing was cemented to the surface by the displacement method on 8/14/16. Operator reported no issues noted during cementing. Plug down at 1000. 35 bbls of cement circulated to the surface. Floats held. |
2514695 | Primary Facility | 2016-08-09 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2514760 | Primary Facility | 2016-08-09 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2515894 | Primary Facility | 2016-08-12 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2516592 | Primary Facility | 2016-08-30 | Incident- Response to Accident or Event | In Compliance with Policy | An incident response conducted as a result of an operator notification. |
2522991 | Primary Facility | 2016-08-30 | Drilling/Alteration | No Violations Noted | Operator drilled a 12 3/8”-inch borehole and set 2,611’ of 9 5/8” Intermediate casing. Intermediate casing was cemented to the surface by the displacement method on 8/17/16. Operator reported no issues noted during cementing. Plug down at 1330. 25 bbls of cement circulated to the surface. Floats held. |
2522995 | Primary Facility | 2016-09-08 | Drilling/Alteration | No Violations Noted | Drilling complete. Well drilled to 13,839’ TMD / 7,995’ TVD on 9/5/16. Production casing set @ 13,819’ TMD and cemented on 9/6/2016. Est TOC 214’. |
2522999 | Primary Facility | 2016-08-30 | Drilling/Alteration | No Violations Noted | Tophole portion of the well has been completed. Operator drilled 8 ¾” pilot hole to 7,397’ TMD / 7,230’ TVD on 8/21/16. Borehole is capped and loaded with drilling mud. |
2549023 | Primary Facility | 2016-10-15 | Administrative/File Review | In Compliance with Policy |
On 10/15/16 at approximately 1200 hours I completed an administrative inspection in response to a release at the Patton pad. A spill out of containment of approximately 1 barrel of water and drilling cuttings was reported, but an accurate volume could not be determined due to rain water being present on the containment. Weavertown Environmental performed the cleanup of the site. SE Technologies LLC submitted a letter on Vantage’s behalf requesting that the Act 2 process be waived, due to the inconclusive volume released and low conductivity levels. The Department determined that the evidence provided was reasonable and has permitted Vantage to continue without the Act 2 process. The spill was handled in compliance with DEP policy. |
2550439 | Primary Facility | 2016-12-27 | Routine/Complete Inspection | No Violations Noted |
On 12/27/16 at approximately 1030 hours I conducted a routine complete inspection of the Patton Unit. The Act 9 sign was in place and all required documents were present at the site. A U shape of sediment sock had been placed immediately adjacent to the first stream crossing to serve as an infiltration berm for water eroding the road surface. It is highly recommended that the road be repaired and the material stopped by the sock removed to prevent a BMP failure at the stream. The GPUs were found to be in secondary containment consistent with Chapter 78A.64b which requires equipment containing regulated substances to be placed within secondary containment. The site overall was well vegetated and no signs of erosion were observed at the time of inspection with the exception of the road surface. |
For data sources see[7]