If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22842 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.166445293,"lon":-81.64493665,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Bath Township | |
Operator Name: TRANSCONTINENTAL OIL & GAS INC | |
Well Pad ID: | |
Farm/Lease Name: ROSEBROCK # 1 | |
License Status: Producing | |
License Date: 1996-03-25 | |
Spud Date: 1996-11-04 | |
Spud Drilling Contractor: [[P&R INC [PEEK & ROWAN]]] | |
Final Drill Date: 1996-11-08 | |
Well Total Depth: 3660 ft | |
Configuration: Vertical | |
Latitude: 41.166445293 | |
Longitude: -81.64493665 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1996-03-25 | 4744 TRANSCONTINENTAL O & G GeoDate 3/25/96 |
Oil and Gas | 1996-03-25 | Issued Date 3/25/96 Expired Date 3/25/97 Acres 0024610 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1996-11-04 | RBDMS Rec |
Completed | 1996-11-08 | RBDMS Rec |
Reached Total Depth | 1996-11-08 | RBDMS Rec |
Construction Permit Expires | 1997-03-25 | RBDMS Rec |
Completion Report Received | 1998-12-03 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1999-01-15 | 3446 | 3483 | 27 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 100990 Gal | 60000 | 170M SCF NITROGEN ASSIST |
For data sources see[4]