37-059-27338

Well Details

Well ID: 37-059-27338
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Aleppo Township
Operator Name: RICE DRILLING B LLC
Well Pad ID: 152573
Farm/Lease Name: PISTON HONDA 12
License Status: Active
Spud Date: 2017-09-19
Permit Date: 2017-08-28
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.792392
Longitude: -80.502778

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0
2019 RICE DRILLING B LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-M11 Drill Cuttings (in Tons) RWC 810 22.51 Tons LANDFILL 100172
2017-M11 Drill Cuttings (in Tons) RWC 810 46.26 Tons LANDFILL 100663
2017-M11 Drilling Fluid Waste (in Barrels) RWC 803 56.67 Bbl REUSE (AT WELL PAD)
2017-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 20.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M11 Produced Fluid (in Barrels) RWC 802 17.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M12 Drill Cuttings (in Tons) RWC 810 7.66 Tons LANDFILL 100172
2017-M12 Drill Cuttings (in Tons) RWC 810 37.76 Tons LANDFILL 100663
2017-M12 Drilling Fluid Waste (in Barrels) RWC 803 182.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M12 Drilling Fluid Waste (in Barrels) RWC 803 20.00 Bbl REUSE (AT WELL PAD)
2017-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M12 Other Oil & Gas Wastes (in Tons) RWC 899 1.01 Tons LANDFILL 100277
2017-M12 Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2017-M12 Produced Fluid (in Barrels) RWC 802 18.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M12 Synthetic Liner Materials (in Tons) RWC 806 0.93 Tons LANDFILL 100663
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 53.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 70.00 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 60.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2639920 Primary Facility 2017-09-20 Drilling/Alteration No Violations Noted The well has been spud. The well was spud on 9/19/17. The operator drilled a 36 inch hole to 50 feet and set and cemented a 50 foot x 26 inch conductor pipe in place. A cylindrical well cellar has been installed around conductor pipe.
2640683 Primary Facility 2017-09-20 Routine/Complete Inspection No Violations Noted On September 20, 2017, the Department performed an inspection of the Rice Energy, Piston Honda well pad site. Present at time of inspection was Joel Keller (DEP) and Jamie Davis (Rice). The site is located in Aleppo Twp., Greene Co. The inspection was related to setting of conductor on the wells to be drilled on site.

The operator is constructing the PCSM structures on the site and stabilizing the site. The operator has begun to set conductors on the 4 permitted wells on the site.

2664925 Primary Facility 2017-11-08 Routine/Complete Inspection No Violations Noted On November 8, 2017, the Department performed an inspection of the Rice Energy, Piston Honda well pad site. The site is located in Aleppo Twp., Greene Co. The inspection was a routine inspection during drilling operations on site.

The operator has completed construction of the PCSM structures on the site and is stabilizing the site. A slide has developed in the PCSM structure at the well pad which extends to the base of the well pad fill slope. The operator will need to stabilize the slope and repair the PCSM structure. The operator has set conductors on 6 wells on the site and has begun drilling the vertical sections on these 6 wells.

2665952 Primary Facility 2017-11-29 Drilling/Alteration No Violations Noted Falcon 20 drilling 8 3/4" hole @ 3673'. 9 5/8" csg set at 2819'. Operator reports no anomalies. On site inspection showsnoapparent violations. NOVIO