34-153-22966

Well Details

Well ID: 34-153-22966
Loading map...
Country: United States
State: Ohio
County: Summit
Municipality: Coventry Township
Operator Name: CARGILL INC
Well Pad ID:
Farm/Lease Name: CITY OF AKRON (SMP #4)
License Status: Active Injection
License Date: 2006-03-20
Spud Date: 2006-08-03
Spud Drilling Contractor: UNION DRLG
Final Drill Date: 2006-08-14
Well Total Depth: 3135 ft
Configuration: Vertical
Latitude: 41.019345445
Longitude: -81.56008297

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2005-12-22 Proposed Formations:SALINA, Issued Date:12/22/2005, Expired Date:12/22/2006 6:00:00 AM, Drilling unit acres:15.5, Proposed Well Type:SM, Proposed Well Class:SMP
APP 2006-03-20 Proposed Formations:SALINA, Issued Date:3/20/2006, Expired Date:3/20/2007 6:00:00 AM, Drilling unit acres:120, Proposed Well Type:SM, Proposed Well Class:SMP
Original Spud 2006-08-03 RBDMS Rec
Completed 2006-08-14 RBDMS Rec
Reached Total Depth 2006-08-14 RBDMS Rec
Completion Report Received 2006-09-27 RBDMS Rec
Construction Permit Expires 2007-03-20 RBDMS Rec
Last Compliance Report 2016-08-29 RBDMS Rec
Record Last Modified 2016-08-29 RBDMS Rec

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0007367876 2019-01-04 Solution Mining Project No Violations I found the injection well in good repair. I observed no leaks or spills. A locked chain link fence with barb wire surrounding the injection well. An identification sign is posted.
0066568027 2014-12-05 Solution Mining Project No Violations An inspection of the well found no violations at the time.
0343060833 2013-06-24 Solution Mining Project No Violations The well was properly identified. My inspection was accompanied by Andrew Adgate.
0387801020 2009-06-18 Solution Mining Project No Violations Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time.
0480959360 2016-08-16 Solution Mining Project No Violations A water-brine interface mechanical integrity test was performed on the well. City of Akron #77, Summit permit number 3121 was used as a reference well. Calculations indicated a net pressure change less than 0.05 psi./hour, between the well and the reference. The well passed the test.
0548536689 2006-12-08 Solution Mining Project No Violations Successfully completed a MIT on this well.

10:28 535 psi 10:33 535 psi 10:38 535 psi 10:43 535 psi

0549700906 2007-01-08 Solution Mining Project No Violations On January 4, 2007, the annular space between the 10-3/4 and 7 casing was grouted with 51 sacks of class A cement from 210 to surface. This inspection confirmed that the job was successful and the cement stayed up and was present at the surface.
0719078282 2006-08-14 Drill / Deepen / Reopen No Violations Union will TD the well later today and should be ready to run and cement the 7 production string tonight.
1038162884 2010-08-03 Solution Mining Project No Violations Annual inspection of this solution mining well found no violations at this time.
1179777310 2007-05-16 Solution Mining Project No Violations Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched.
1185915710 2007-07-25 Preliminary Restoration No Violations Preliminary restoration is approved.
1319653325 2011-10-11 Solution Mining Project No Violations This inspection was completed as part of the required five year mechanical integrity test (MIT). The test well is the 7 production casing in Akron #73. The reference well was the 7 casing in Akron #74 (PN-2967). The test began at 07:00 am and was concluded at 3:00 pm on 10/11/2011. The first pressure difference between the test well and the reference well was 249.672 psi. The final pressure difference between the test well and the reference well, eight hours later was 249.669 psi. Based on the pressure change from start to finish, the Akron 73 well easily passes this MIT.
1636208938 2007-01-04 Solution Mining Project No Violations On site to witness grouting of the annular space between the 7 and 10-3/4 casings with class A cement. The cement was spotted using 1 PVC tubing placed between the two casing strings to a depth of approximately 210. Cement circulated to surface and stayed up.
1775593369 2006-08-03 Drill / Deepen / Reopen No Violations Union Drilling Rig 24 is on site and rigging up. Should spud the well within 24 hours. Using steel pits.
1844939310 2006-12-14 Solution Mining Project No Violations Arvilla was on site to drill out the 7 production casing. They were using a small mud pump and a power swivel to drill with and were circulating into a half tank. No violations at this time.
1957845929 2017-12-01 Solution Mining Project No Violations I was on location to inspect the injection well. A locked chain link fence with barb wire surrounds the well. I observed no leaks or spills. An identification sign is posted. The access road gate was locked with an identification sign. There are no issues at this time.
1971734864 2006-08-10 Drill / Deepen / Reopen No Violations Union Drilling is drilling ahead. No violations at this time.
2048176757 2008-12-31 Solution Mining Project No Violations Annual status check inspection found no violations at this time.

For data sources see[3]