If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22967 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.018814172,"lon":-81.55922799,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Coventry Township | |
Operator Name: CARGILL INC | |
Well Pad ID: | |
Farm/Lease Name: CITY OF AKRON (SMP #4) | |
License Status: Active Injection | |
License Date: 2006-03-20 | |
Spud Date: 2006-08-17 | |
Spud Drilling Contractor: UNION DRLG | |
Final Drill Date: 2006-08-27 | |
Well Total Depth: 3150 ft | |
Configuration: Vertical | |
Latitude: 41.018814172 | |
Longitude: -81.55922799 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2005-12-22 | Proposed Formations:SALINA, Issued Date:12/22/2005, Expired Date:12/22/2006 6:00:00 AM, Drilling unit acres:15.5, Proposed Well Type:SM, Proposed Well Class:SMP |
APP | 2006-03-20 | Proposed Formations:SALINA, Issued Date:3/20/2006, Expired Date:3/20/2007 6:00:00 AM, Drilling unit acres:120, Proposed Well Type:SM, Proposed Well Class:SMP |
Original Spud | 2006-08-17 | |
Completed | 2006-08-27 | |
Reached Total Depth | 2006-08-27 | |
Completion Report Received | 2006-09-27 | |
Construction Permit Expires | 2007-03-20 | |
Last Compliance Report | 2012-11-20 | |
Record Last Modified | 2016-08-29 |
For data sources see[2]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0141374082 | 2016-08-15 | Solution Mining Project | No Violations | A water-brine interface mechanical integrity test was performed on the well. City of Akron #77, Summit permit number 3121 was used as a reference well. Calculations indicated a net pressure change less than 0.05 psi./hour, between the well and the reference. The well passed the test. |
0574127248 | 2008-12-31 | Solution Mining Project | No Violations | Annual status check inspection found no violations at this time. |
0867810887 | 2007-05-16 | Solution Mining Project | No Violations | Preliminary restoration is due this month. The site still needs to be finish graded, topsoil spread, seeded and mulched. |
0931094782 | 2014-12-05 | Solution Mining Project | No Violations | An inspection of the well found no violations at the time. |
1015282035 | 2010-08-03 | Solution Mining Project | No Violations | Annual inspection of this solution mining well found no violations at this time. |
1154634379 | 2006-08-01 | Solution Mining Project | No Violations | The location has been built and Union Drilling has started moving equipment on site. Union will be using steel pits. |
1221805045 | 2009-06-18 | Solution Mining Project | No Violations | Columbus requested an annual inspection of the solution mining wells. This inspection found no violations at this time. |
1373225773 | 2013-06-24 | Solution Mining Project | No Violations | The well was properly identified. My inspection was accompanied by Andrew Adgate. |
1393124839 | 2007-07-25 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1547097761 | 2006-08-17 | Drill / Deepen / Reopen | No Violations | Union Drilling Rig #24 spudded the well this morning and is drilling conductor hole. They should be ready to cement later today. The sump pit is lined and in good condition. |
1705321168 | 2006-12-08 | Solution Mining Project | No Violations | Successfully completed a MIT on this well.
09:50 525 psi 09:55 525 psi 10:00 525 psi 10:05 525 psi |
1920677493 | 2019-01-04 | Solution Mining Project | No Violations | I found the injection well in good repair. I observed no leaks or spills. A locked chain link fence with barb wire surrounding the injection well. An identification sign is posted. |
2073860089 | 2011-09-29 | Solution Mining Project | No Violations | Completed the required 5 year Class III mechanical integrity test using the water-brine interface method. The reference well is Akron #73 permit 2966. The calculated pressure required to place the interface 50 feet above the bottom of the 7 casing was 239.470 psi. The actual pressure achieved was 214.367 psi. The net pressure difference between the test well and the reference well at the start of the day was 237.227 psi. After eight hours, the net pressure difference between the test and reference point was 237.168 psi for a total loss of 0.059 psi over eight hours or 0.007 psi/hour. THE MIT WAS SUCCESSFUL AND THE WELL PASSED. |
For data sources see[3]