If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-22970 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.039428479,"lon":-81.48326425,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Springfield Township | |
Operator Name: OHIO VALLEY ENERGY SYSTEM CORP | |
Well Pad ID: | |
Farm/Lease Name: WOLFF UNIT | |
License Status: Producing | |
License Date: 2006-01-09 | |
Spud Date: 2006-05-18 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2006-05-20 | |
Well Total Depth: 4235 ft | |
Configuration: Vertical | |
Latitude: 41.039428479 | |
Longitude: -81.48326425 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-01-09 | Proposed Formations:BEREA THRU CLINTON, Issued Date:1/9/2006, Expired Date:1/9/2007 6:00:00 AM, Drilling unit acres:41.95, Proposed Well Type:OG, Proposed Well Class:POOL |
Original Spud | 2006-05-18 | RBDMS Rec |
Completed | 2006-05-20 | RBDMS Rec |
Reached Total Depth | 2006-05-20 | RBDMS Rec |
Completion Report Received | 2006-07-11 | RBDMS Rec |
Construction Permit Expires | 2007-01-09 | RBDMS Rec |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-15 | 3988 | 4006 | 56 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 15 | 2352 Bbl | 60000 | 1000 GALLONS IC ACID |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | OHIO VALLEY ENERGY SYSTEM CORP | 6676 | 583 | 114 |
2007 | OHIO VALLEY ENERGY SYSTEM CORP | 44017 | 1733 | 364 |
2008 | OHIO VALLEY ENERGY SYSTEM CORP | 43055 | 2017 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEM CORP | 57737 | 1350 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEM CORP | 43078 | 908 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEM CORP | 31052 | 1077 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEM CORP | 31852 | 756 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEM CORP | 20384 | 553 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEM CORP | 17000 | 476 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEM CORP | 11587 | 369 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEM CORP | 6607 | 34 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEM CORP | 6442 | 244 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEM CORP | 6318 | 200 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2006 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 1821 | 114 |
2007 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 173 | 364 |
2008 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 231 | 365 |
2009 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 135 | 365 |
2010 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 67 | 365 |
2011 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 165 | 365 |
2012 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 192 | 366 |
2013 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 105 | 365 |
2014 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 154 | 365 |
2015 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 118 | 365 |
2016 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 0 | 365 |
2017 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 145 | 365 |
2018 | OHIO VALLEY ENERGY SYSTEM CORP | Brine | 174 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0241297421 | 2006-05-18 | Drill / Deepen / Reopen | No Violations | Wildcat spudded the well after midnight and are drilling surface hole. The pits, south of the rig, are lined and in good condition. |
0474147125 | 2006-06-07 | Drill / Deepen / Reopen | No Violations | The well has been fraced and the pits are scheduled to be solidified on Friday June 9. No violations at this time. |
1135308550 | 2006-05-17 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling is in the process of moving on the location. The well should be spudded later today. |
1149037797 | 2006-05-22 | Drill / Deepen / Reopen | No Violations | Wildcat Drilling has finished drilling and is rigging down and moving off location. The pits have been pumped down, are lined and in good condition. |
1279518656 | 2006-10-24 | Production Wells | No Violations | The tank battery has been built and fenced and the well is in production. Additional grading and seeding is necessary before approving preliminary restoration. |
1377356388 | 2006-12-19 | Preliminary Restoration | No Violations | Preliminary restoration is approved. |
1377737711 | 2006-05-15 | Drill / Deepen / Reopen | No Violations | Work has begun to build the drilling location. The drilling rig is scheduled to arrive on Wednesday May 17. |
1379046566 | 2006-05-19 | Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead. The pits are in good condition. |
1467430920 | 2006-07-17 | Production Wells | No Violations | The tank battery is being set and the site has been rough graded and seeded to control erosion. No violations at this time. |
1648746281 | 2011-04-11 | Production Wells | No Violations | Status check inspection found minor housekeeping issues around the tank battery. These issues include discarded valve handles, used sorbent pads and oil staining on the side of the stock tank. I contacted Dale Nething with OVE and requested that these issues be corrected. |
1650185437 | 2011-04-21 | UrbanProduction Wells | No Violations | The houskeeping issues around the tank battery have been resolved. No violations at this time. |
1760579234 | 2006-06-09 | Drill / Deepen / Reopen | No Violations | Pits have been solidified and closed. |
For data sources see[9]