37-059-27511

Well Details

Well ID: 37-059-27511
Loading map...
Country: United States
State: Pennsylvania
County: Greene
Municipality: Jackson Township
Operator Name: EQT PROD CO
Well Pad ID: 154155
Farm/Lease Name: STATE GAME LANDS 179 NFR60H29
License Status: Active
Spud Date: 2017-10-31
Permit Date: 2017-10-19
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 39.815272
Longitude: -80.402322

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 EQT PROD CO 0.00 0 0.00 0 0.00 0
2019 EQT PROD CO 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 13.00 Bbl REUSE (AT WELL PAD)
2017-M12 Drill Cuttings (in Tons) RWC 810 233.29 Tons LANDFILL 100172
2017-M12 Drill Cuttings (in Tons) RWC 810 35.21 Tons LANDFILL 100419
2017-M12 Drill Cuttings (in Tons) RWC 810 48.47 Tons LANDFILL 100663
2018-M01 Drill Cuttings (in Tons) RWC 810 121.62 Tons LANDFILL 100172
2018-M01 Drill Cuttings (in Tons) RWC 810 34.47 Tons LANDFILL 100419
2018-M01 Drill Cuttings (in Tons) RWC 810 158.41 Tons LANDFILL 100663
2018-M01 Drilling Fluid Waste (in Barrels) RWC 803 650.00 Bbl REUSE (AT WELL PAD)
2018-M03 Drill Cuttings (in Tons) RWC 810 374.51 Tons LANDFILL 100172
2018-M03 Drill Cuttings (in Tons) RWC 810 67.16 Tons LANDFILL 100663
2018-M03 Drilling Fluid Waste (in Barrels) RWC 803 260.00 Bbl REUSE (AT WELL PAD)
2018-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 5.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 2.00 Bbl REUSE (AT WELL PAD)
2018-M03 Synthetic Liner Materials (in Tons) RWC 806 6.19 Tons LANDFILL 100172
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 13.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 34.00 Bbl REUSE (AT WELL PAD)
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 5.50 Bbl REUSE (AT WELL PAD)
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 23.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW009
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 8.00 Bbl REUSE (AT WELL PAD)
2018-M10 Drill Cuttings (in Tons) RWC 810 514.67 Tons LANDFILL 100172
2018-M10 Drill Cuttings (in Tons) RWC 810 261.57 Tons LANDFILL 100663
2018-M10 Drilling Fluid Waste (in Barrels) RWC 803 390.00 Bbl REUSE (AT WELL PAD)
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 4.00 Bbl REUSE (AT WELL PAD)
2018-M10 Other Oil & Gas Wastes (in Tons) RWC 899 5.05 Tons LANDFILL 100172
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 58.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M11 Other Oil & Gas Wastes (in Barrels) RWC 899 12.00 Bbl REUSE (AT WELL PAD)
2018-M11 Other Oil & Gas Wastes (in Tons) RWC 899 1.19 Tons RESIDUAL WASTE PROCESSING FACILITY ODNR 2015-511
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 34.00 Bbl REUSE (AT WELL PAD)

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2632615 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted On August 2, 2017, the Department performed an inspection of the EQT State Gamelands 179 well pad site. Present at time of inspection was Bill Balog (EQT), Will Brogan and Mike Stephan (DEP). The site is located in Aleppo and Jackson Twps., Greene Co. The inspection was a follow up inspection of the site after noted violations on July 31, 2017.

The operator was in process of repairing E&S BMPs which were damaged and failed during a recent heavy rainfall event. The operator has agreed to repair the stream crossing for Reinhart Rd. In Jackson Twp. The operator will apply for necessary Emergency 105 permit to perform repairs to the stream crossing and to remediate impacts to an unnamed trib. to Job Creek from sediment discharges associated with E&S BMPs failure on site after the recent rainfall event. The remediation will be performed by hand as much as possible.

13 wells have been permitted for the site. Site under construction. No wells have been drilled at time of inspection.

2636851 Primary Facility 2017-09-07 Routine/Complete Inspection No Violations Noted On September 7, 2017, the Department performed an inspection of the EQT State Gamelands 179 well pad site. Presnt at ime of inspection was Rex Nelson (EQT). The site is located in Aleppo and Jackson Twps., Greene Co. The inspection was a routine inspection after notification by the operator of E&S failures on site after a recent rainfall event.

The operator has repaired E&S BMPs which were damaged and failed during a heavy rainfall event. The operator reported a rainfall of 1 1/2" during a 1 hour timeframe on September 5, 2017. During the September 6, 2017 E&S inspection the operator noted failures along the silt sock down gradient from the excess material stockpiles. The operator has stabilized the site with armor guard hydro seed as areas of construction are complete. The erosion prevention seeding did not perform as expected and sediment laden water over toped the silt sock discharging small amount of sediment approximately 20' outside the LOD. The operator has contacted the seeding company to reappl

2651400 Primary Facility 2017-10-05 Preoperation Inspection No Violations Noted On October 5, 2017, the Department performed an inspection of the EQT State Gamelands 179 well pad site. Presnt at ime of inspection was Rex Nelson (EQT). The site is located in Aleppo and Jackson Twps., Greene Co. The inspection was a inspection after a request by the operator for a pre-operational inspection.

The operator has completed installation of all E&S controls. The well pad final grading and stoning is being completed. The operator has completed construction of the access road and PCSMs along the access road. The construction of the well pad PCSMs (wet pond) is almost complete. The operator has temporarily stabilized the well pad and stockpile slopes with hydro seeding and slope armoring.

13 wells have been permitted to be drilled on site. None of the wells have been drilled at time of inspection.

2656495 Primary Facility 2017-11-02 Drilling/Alteration No Violations Noted Conductor set @ 40'. Setting Cellar Tech after conductor are in.
2678593 Primary Facility 2018-01-03 Drilling/Alteration No Violations Noted Setting Water/Coal Protection and cementing today (12/29/2017).Circulation throughout entire job.
2758147 Primary Facility 2018-07-31 Drilling/Alteration No Violations Noted The operator resumed drilling @ 6,682' on 7/30/18. Currently drilling ahead at 7,827'. Conduct site walk.

For data sources see[6]

References