If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-153-23130 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.107818681,"lon":-81.58817731,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Summit | |
Municipality: Copley Township | |
Operator Name: PIN OAK ENERGY PARTNERS LLC | |
Well Pad ID: | |
Farm/Lease Name: FRANK JOHN V | |
License Status: Producing | |
License Date: 2011-04-22 | |
Spud Date: 2011-05-31 | |
Spud Drilling Contractor: WILDCAT DRILLING | |
Final Drill Date: 2011-06-07 | |
Well Total Depth: 4331 ft | |
Configuration: Directional | |
Latitude: 41.107818681 | |
Longitude: -81.58817731 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-04-22 | Proposed Formations:ORISKANY/NEWBURG/CLINTON, Issued Date:4/22/2011, Expired Date:4/21/2013 12:00:00 PM, Drilling unit acres:31.22, Proposed Well Type:OG, Proposed Well Class:POOL |
Reached Total Depth | 2011-06-07 | |
Completion Report Received | 2011-08-02 | |
Construction Permit Expires | 2012-04-21 | |
Change of Owner | 2018-08-21 | Operator changed from 3434, GONZOIL INC to 9722, PIN OAK ENERGY PARTNERS LLC |
Record Last Modified | 2018-08-21 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-10-06 | 4064 | 4096 | 18 |
2011-10-06 | 4106 | 4134 | 9 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-06-28 | H2O | 0 | 85000 Gal | 80000 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | GONZOIL INC | 0 | 161 | 207 |
2012 | GONZOIL INC | 15724 | 293 | 366 |
2013 | GONZOIL INC | 12132 | 310 | 365 |
2014 | GONZOIL INC | 10972 | 167 | 365 |
2015 | GONZOIL INC | 9416 | 227 | 365 |
2016 | GONZOIL INC | 10265 | 245 | 365 |
2017 | GONZOIL INC | 7392 | 97 | 365 |
2018 | GONZOIL INC | 3701 | 74 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | GONZOIL INC | Brine | 328 | 207 |
2012 | GONZOIL INC | Brine | 367 | 366 |
2013 | GONZOIL INC | Brine | 172 | 365 |
2014 | GONZOIL INC | Brine | 89 | 365 |
2015 | GONZOIL INC | Brine | 150 | 365 |
2016 | GONZOIL INC | Brine | 90 | 365 |
2017 | GONZOIL INC | Brine | 79 | 365 |
2018 | PIN OAK ENERGY PARTNERS LLC | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0356838522 | 2011-06-20 | Urban Drill / Deepen / Reopen | No Violations | The drilling pits have been solidified and covered over. No violations at this time. |
0855284401 | 2011-05-31 | Urban Drill / Deepen / Reopen | No Violations | Wildcat Drilling is on site and will spud the well later today. The required identification and the permit are posted. No violations at this time. |
1013618694 | 2011-06-06 | Urban Drill / Deepen / Reopen | No Violations | Wildcat is drilling ahead with air/soap. The permit calls for switching over to fluid at the top of the Lockport dolomite. The rig has been carrying background gas at a consistent rate since it was first encountered while drilling in the Ohio Shale. I advised the company that they would be required to switch to fluid immediately if there were any odor complaints. Even at 200+ units on the gas chromatograph, I could detect no odor near the blowline. The pits are fenced, lined and in good condition. |
1032567200 | 2018-06-20 | UrbanProduction Wells | No Violations | The access road was graveled to the wellhead and tank battery. The wellhead was surrounded with a locked, chain link fence with privacy slats. Urbanized signage was posted and legible. The well was operated as a natural gas powered pumping unit. A two (2) inch manifold with gauge monitored the 8.625 X 4.5 annular pressure. No leaks were identified at the wellhead. The tank battery was surrounded with an earthen dike and a locked chain link fence with privacy slats. The urbanized signage was posted and legible at the tank battery. The tank battery consisted of one (1) 140 barrel stock tank, one (1) 30 barrel poly brine tank , one (1) 2408 separator and one (1) vertical separator. The 140 barrel stock had a lightning arrestor, pressure relief valve, charcoal filter and sealing inspection hatch. The load lines were locked and plugged. No leaks were identified at the tank battery. No violations found during this inspection. |
1308919410 | 2011-06-09 | Urban Drill / Deepen / Reopen | No Violations | Wildcat has moved off location. The drilling pits are fenced, lined and in good condition. The pits have also been pumped down and have sufficient freeboard to contain any rainfall. GonzOil has scheduled pit solidification for next week. |
1310410667 | 2011-06-30 | Urban Drill / Deepen / Reopen | No Violations | The well was fraced on June 28. Bishop Well Service was still on site swabbing the well and getting ready to run tubing. The frac tanks were being emptied and removed. No violations at this time. |
1498835695 | 2011-06-07 | Urban Drill / Deepen / Reopen | No Violations | Wildcat has reached TD and should be ready to run and cement 4-1/2 casing later tonight. The pits are fenced, lined and in good condition. No violations at this time. |
2081306877 | 2011-12-27 | Preliminary Restoration | No Violations | Preliminary Restoration is approved. |
2096185181 | 2011-07-28 | Urban Drill / Deepen / Reopen | No Violations | The affected area is graded, seeded and mulched. The tank battery is under construction and the well should be ready for turn on in the near future. |
For data sources see[9]