If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-157-23118 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.308491936,"lon":-81.35713734,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Tuscarawas | |
Municipality: Rush Township | |
Operator Name: LLP GAS AND OIL CORPORATION | |
Well Pad ID: | |
Farm/Lease Name: CARPENTER UNIT | |
License Status: Producing | |
License Date: 1978-05-15 | |
Spud Date: 1978-06-09 | |
Spud Drilling Contractor: | |
Final Drill Date: 1978-06-28 | |
Well Total Depth: 5558 ft | |
Configuration: Vertical | |
Latitude: 40.308491936 | |
Longitude: -81.35713734 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1978-05-15 | 311 STOCKER & SITLER INC GeoDate 5/15/78 |
Original Spud | 1978-06-09 | |
Completed | 1978-06-28 | |
Reached Total Depth | 1978-06-28 | |
CO | 1995-08-03 | 3715 EASTLAND ENERGY GROUP INC GeoDate 5/15/78 |
Change of Owner | 1997-12-17 | Operator changed from 3715, EASTLAND ENERGY GROUP INC to 1586, L L P OIL & GAS CORP |
Record Last Modified | 2013-10-03 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 5279 | 5367 | 17 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2100 Bbl | 70000 |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0161163481 | 2018-06-19 | Production Wells | No Violations | Upon arrival on location, I witnessed the well was equipped with 4.5 inch diameter casing, 2.375 inch diameter tubing, rods, and a pumping unit operated with an electric motor. The valves were open on tubing and closed on the casing. Production equipment included two steel 100 barrel tanks, a horizonal separator, and a chart recorder with a 2 by .750 inch orifice plate within an earthen dike. The production report was up to date and proper identification was in place. |
For data sources see[9]