If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-073-23450 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.515573667,"lon":-82.59290286,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Hocking | |
Municipality: Laurel Township | |
Operator Name: HOCKING HILLS ENERGY AND WELL | |
Well Pad ID: | |
Farm/Lease Name: HILL UNIT | |
License Status: Plugged and Abandoned | |
License Date: 2009-09-01 | |
Spud Date: 1997-01-28 | |
Spud Drilling Contractor: KILBARGER DRLG | |
Final Drill Date: 1997-02-04 | |
Well Total Depth: 4294 ft | |
Configuration: Vertical | |
Latitude: 39.515573667 | |
Longitude: -82.59290286 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1996-10-25 | 2936 COLUMBIA NATURAL RES INC GeoDate 10/25/96 |
Oil and Gas | 1996-10-25 | Issued Date 10/25/96 Expired Date 10/25/97 Acres 0060000 Tool Type RTAF Proposed Formation ROSE RUN Proposed Depth 00000 Proposed Drill Depth 00000 |
Original Spud | 1997-01-27 | |
Completed | 1997-02-04 | |
Reached Total Depth | 1997-02-04 | |
Completion Report Received | 1997-04-18 | |
End of Confidential Data | 1998-02-04 | |
Change of Owner | 1998-03-19 | Operator changed from 2936, COLUMBIA NATURAL RES INC to 5755, CHIEFTAIN ENERGY CORP. |
APP | 2008-08-04 | Proposed Formations:ROSE RUN, Issued Date:8/4/2008, Expired Date:8/4/2009 6:00:00 AM, Drilling unit acres:60, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2009-08-10 | |
APP | 2009-09-01 | Proposed Formations:BEEKMANTOWN, Issued Date:9/1/2009, Expired Date:9/1/2010 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:OG, Proposed Well Class: |
Construction Permit Expires | 2010-09-01 | |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-07-02 | 4053 | 4061 | 4 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
ACID | 15 | 250 Bbl | 0 | |||
ACID | 15 | 250 Gal | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | CHESAPEAKE APPALACHIA LLC | 0 | 0 | 0 |
1997 | CHESAPEAKE APPALACHIA LLC | 0 | 0 | 0 |
1998 | HOCKING HILLS ENERGY AND WELL | 7865 | 0 | 200 |
1999 | HOCKING HILLS ENERGY AND WELL | 664 | 0 | 365 |
2000 | HOCKING HILLS ENERGY AND WELL | 532 | 0 | 365 |
2001 | HOCKING HILLS ENERGY AND WELL | 666 | 0 | 365 |
2002 | HOCKING HILLS ENERGY AND WELL | 193 | 0 | 365 |
2003 | HOCKING HILLS ENERGY AND WELL | 29 | 0 | 365 |
2004 | HOCKING HILLS ENERGY AND WELL | 205 | 0 | 365 |
2005 | CHESAPEAKE APPALACHIA LLC | 217 | 0 | 0 |
2006 | HOCKING HILLS ENERGY AND WELL | 0 | 0 | 0 |
2007 | HOCKING HILLS ENERGY AND WELL | 0 | 0 | 0 |
2008 | HOCKING HILLS ENERGY AND WELL | 0 | 0 | 0 |
2009 | HOCKING HILLS ENERGY AND WELL | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1996 | CHESAPEAKE APPALACHIA LLC | Brine | 0 | 0 |
1997 | CHESAPEAKE APPALACHIA LLC | Brine | 0 | 0 |
1998 | CHESAPEAKE APPALACHIA LLC | Brine | 0 | 101 |
1999 | HOCKING HILLS ENERGY AND WELL | Brine | 50 | 365 |
2000 | HOCKING HILLS ENERGY AND WELL | Brine | 50 | 365 |
2001 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 365 |
2002 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 365 |
2003 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 365 |
2004 | HOCKING HILLS ENERGY AND WELL | Brine | 65 | 365 |
2005 | CHESAPEAKE APPALACHIA LLC | Brine | 0 | 0 |
2006 | HOCKING HILLS ENERGY AND WELL | Brine | 300 | 0 |
2007 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 0 |
2008 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 0 |
2009 | HOCKING HILLS ENERGY AND WELL | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0029726559 | 2008-06-10 | Administrative Inspection | No Violations | Mr. Doug Kitchen, Chieftain Energy, was contacted regarding NOVs on the Hill, Deval and McGlaughlin injection well. Mr. Kitchen stated that he would contact me tonight and set up a time for a mini-test on injection well. Mr. Kitchen states that he has sold gas on the Deval and will be plugging the Hill #1. |
0034773126 | 2010-07-02 | Final Restoration | No Violations | FOLLOW UP TO NOV # -588817506 An inspection conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor, revealed that the final restoration does not meet ORC 1509.072. Black plastic line was observed below the well site location and routed to location continuing for a su |
0574895631 | 2009-08-07 | Plug / Plug Back | No Violations | A follow-up inspection to Notice of Violation and Compliance Agreement Schedule revealed that rods are being pulled from the well bore. |
0588817506 | 2010-07-02 | Final Restoration | Violations Noted | An inspection conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor, revealed that the final restoration does not meet ORC 1509.072. Black plastic line was observed below the well site location and routed to location continuing for a substantial distance off property. All line and related equipment will need to be removed. The well site did not contain vegetative growth. Gravel placed around the well location and oil stained ground shall be removed in order to vegetation. Lime, seed and mulch will need to be applied. An earthen dike remains and will need to be graded. Currently, the lease road is acceptable. Background: Prior to inspection, courtesy verbal notifications have been provided to Chieftain Energy to serve as a reminder to complete final restoration. The inspection was also delayed in order to provide more time for company to achieve compliance. The well was plugged and abandoned on 8/10/2009. On 6/14/2010, Chieftain Energy Contractor, Mr. Ron McBride was reminded, in the field at non-related well location, final restoration was due. Mr. McBride stated that black plastic line routed in length of 1 mile would need removed. On 7/12/2010, Mr. Doug Kitchen was notified of failure to restore by telephone at 10:16 a.m. Please note that failure to comply with this notice may result in a enforcement action referral. Bond Forfeiture: Per SB 165 (effective 6/30/2010), ORC 1509.071 now states that forfeiture of surety bond for three or more wells, the owner, operator, producer or other person shall repost a surety bond in the amount of fifty thousand dollars. |
0598604958 | 2010-07-02 | Final Restoration | No Violations | FOLLOW UP TO NOV # -588817506 An inspection conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor, revealed that the final restoration does not meet ORC 1509.072. Black plastic line was observed below the well site location and routed to location continuing for a substantial distance off property. All line and related equipment will need to be removed. The well site did not contain vegetative growth. Gravel placed around the well location and oil stained ground shall be removed in order to vegetation. Lime, seed and mulch will need to be applied. An earthen dike remains and will need to be graded. Currently, the lease road is acceptable. Background: Prior to inspection, courtesy verbal notifications have been provided to Chieftain Energy to serve as a reminder to complete final restoration. The inspection was also delayed in order to provide more time for company to achieve compliance. The well was plugged and abandoned on 8/10/2009. On 6/14/2010, Chieftain Energy Contractor, Mr. Ron McBride was reminded, in the field at non-related well location, final restoration was due. Mr. McBride stated that black plastic line routed in length of 1 mile would need removed. On 7/12/2010, Mr. Doug Kitchen was notified of failure to restore by telephone at 10:16 a.m. Please note that failure to comply with this notice may result in a enforcement action referral. Bond Forfeiture: Per SB 165 (effective 6/30/2010), ORC 1509.071 now states that forfeiture of surety bond for three or more wells, the owner, operator, producer or other person shall repost a surety bond in the amount of fifty thousand dollars. |
0711780156 | 2004-02-10 | Production Wells | No Violations | No violations. |
1015736125 | 2005-10-04 | Production Wells | No Violations | No violations. NEW LAT & LONG |
1120419557 | 2010-07-02 | Final Restoration | No Violations | FOLLOW UP TO NOV # -588817506 An inspection conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor, revealed that the final restoration does not meet ORC 1509.072. Black plastic line was observed below the well site location and routed to location continuing for a substantial distance off property. All line and related equipment will need to be removed. The well site did not contain vegetative growth. Gravel placed around the well location and oil stained ground shall be removed in order to vegetation. Lime, seed and mulch will need to be applied. An earthen dike remains and will need to be graded. Currently, the lease road is acceptable. Background: Prior to inspection, courtesy verbal notifications have been provided to Chieftain Energy to serve as a reminder to complete final restoration. The inspection was also delayed in order to provide more time for company to achieve compliance. The well was plugged and abandoned on 8/10/2009. On 6/14/2010, Chieftain Energy Contractor, Mr. Ron McBride was reminded, in the field at non-related well location, final restoration was due. Mr. McBride stated that black plastic line routed in length of 1 mile would need removed. On 7/12/2010, Mr. Doug Kitchen was notified of failure to restore by telephone at 10:16 a.m. Please note that failure to comply with this notice may result in a enforcement action referral. Bond Forfeiture: Per SB 165 (effective 6/30/2010), ORC 1509.071 now states that forfeiture of surety bond for three or more wells, the owner, operator, producer or other person shall repost a surety bond in the amount of fifty thousand dollars. |
1204297761 | 2008-02-28 | Production Wells | Violations Noted | A complaint was received alleging non-production. An inspection revealed that this well is idle. The pump jack for this well has been removed, but is still located on-site. Rods and tubing were observed in the well. Records indicate that the last year of production was 2005. |
1204774197 | 2009-08-10 | Plug / Plug Back | No Violations | Witnessed all plugging activity. At conclusion of plugging, Mr. Doug Kitchen was instructed to leave well open to allow cement to settle. If cement drops, we would grout to surface then cut casing and install ID plate. |
1213100698 | 2008-06-10 | Production Wells | No Violations | A follow-up inspection revealed non-compliance. Mr. Doug Kitchen states that he will be plugging this well. |
1220874016 | 2008-09-05 | Production Wells | No Violations | A follow-up inspection revealed non-compliance. Rods and tubing were observed in the well. The pump jack has been removed from the well, however, is still located on the well site. A steel flowline was observed to be connected from the well to a separator and 100 bbl tank. A valve for this line was observed to be open. Plastic flowline was observed to be cut and not connected. The valve for this line was observed to be closed. No meter observed on well site. Records show that the last year of production was 2005. Mr. Doug Kitchen has stated that this well would be plugged per June 10, 2008 conversation. Obtained photographs from this inspection. This case will be handed over to management for further action. |
1304296839 | 2010-07-02 | Final Restoration | No Violations | FOLLOW UP TO NOV # 34773126 FOLLOW UP TO NOV # -588817506 An inspection conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor, revealed that the final restoration does not meet ORC 1509.072. Black plastic line was observed below the well site location and routed to location continuing for a su |
1475544567 | 2008-12-16 | Production Wells | No Violations | A follow-up inspection revealed non-compliance. Mr. Doug Kitchen has previously stated that he is going to plug this well. |
1500512718 | 2009-08-11 | Plug / Plug Back | No Violations | An inspection revealed that cement has settled approximately 6, but still remains at the surface. The casing will be cut 30 below grade and ID plate installed. |
1548642295 | 2010-07-02 | Final Restoration | No Violations | FOLLOW UP TO NOV # -1120419557 FOLLOW UP TO NOV # -588817506 An inspection conducted with Mr. Robert Stonerock, Oil & Gas South Region Supervisor, revealed that the final restoration does not meet ORC 1509.072. Black plastic line was observed below the well site location and routed to location continuing for a substantial distance off property. All line and related equipment will need to be removed. The well site did not contain vegetative growth. Gravel placed around the well location and oil stained ground shall be removed in order to vegetation. Lime, seed and mulch will need to be applied. An earthen dike remains and will need to be graded. Currently, the lease road is acceptable. Background: Prior to inspection, courtesy verbal notifications have been provided to Chieftain Energy to serve as a reminder to complete final restoration. The inspection was also delayed in order to provide more time for company to achieve compliance. The well was plugged and abandoned on 8/10/2009. On 6/14/2010, Chieftain Energy Contractor, Mr. Ron McBride was reminded, in the field at non-related well location, final restoration was due. Mr. McBride stated that black plastic line routed in length of 1 mile would need removed. On 7/12/2010, Mr. Doug Kitchen was notified of failure to restore by telephone at 10:16 a.m. Please note that failure to comply with this notice may result in a enforcement action referral. Bond Forfeiture: Per SB 165 (effective 6/30/2010), ORC 1509.071 now states that forfeiture of surety bond for three or more wells, the owner, operator, producer or other person shall repost a surety bond in the amount of fifty thousand dollars. |
iANGE00089 | 1998-03-10 | Preliminary Restoration | No Violations |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0588817506 | US-OH-126595 | 2010-07-14 | Failure to remove production equip. within 6 mos. REPLACE | |
0588817506 | US-OH-126596 | 2010-07-14 | Failure to restore land surface within 6 months (CHANGE) | |
0588817506 | US-OH-126597 | 2010-07-14 | Forfeiture of bond | |
1204297761 | US-OH-105332 | 2008-02-29 | Well shall be plugged |
For data sources see[9]