X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-099-23173

Well Details

Well ID: 34-099-23173
Loading map...
Country: United States
State: Ohio
County: Mahoning
Municipality: Goshen Township
Operator Name: CHESAPEAKE EXPLORATION LLC
Well Pad ID: US-OH-000463
Farm/Lease Name: JARVIS 4-17-4
License Status: Cancelled
License Date: 2011-11-14
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Horizontal
Latitude: 40.977476225
Longitude: -80.92906373

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2011-11-14 Proposed Formations:UTICA-TRENTON, Issued Date:11/14/2011, Expired Date:11/13/2013 12:00:00 PM, Drilling unit acres:161.16, Proposed Well Type:OG, Proposed Well Class:EDPW
Construction Permit Expires 2013-11-13
Completion Report Received 2013-12-05
Record Last Modified 2017-02-10

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
1857780842 2014-03-27 Drill / Deepen / Reopen No Violations I performed a status check on the above location. At this time there has been no drilling activity on the location. The location is secured by a chain link fence and a locked entrance gate. Location is clear of debris. Lease road is in good condition. Erosions control is in good condition. No violation at this time. I spoke with a Chesapeake Representative, Lucas Shipper and he did not know when any drilling active would take place. The drilling permit expired on 11/13/2013.
1972737392 2011-12-28 Surface Facility Construction No Violations The construction of the gravel drill pad and access road is finished. Identification signage posted at the entrance on West Calla Road. The drill pad is enclosed with chain link fencing that is topped with barbed wire. The top soil is stockpiled to the northwest of the drill pad and encircled with silt fence. Erosion control measures are in place along the berms around the drill pad. The gravel pad is flooded with rain water. The crew from Pol Construction is on site pumping water off of the pad.

For data sources see[3]

References