34-167-29758

Well Details

Well ID: 34-167-29758
Loading map...
Country: United States
State: Ohio
County: Washington
Municipality: Waterford Township
Operator Name: PDC ENERGY INC
Well Pad ID:
Farm/Lease Name: MASON
License Status: Not Drilled
License Date: 2015-08-25
Spud Date:
Spud Drilling Contractor:
Final Drill Date:
Well Total Depth:
Configuration: Vertical
Latitude: 39.567295757
Longitude: -81.58889126

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2015-08-25 Proposed Formations:POINT PLEASANT, Issued Date:8/25/2015, Expired Date:8/24/2017 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT
Construction Permit Expires 2017-08-24
Record Last Modified 2018-11-01

For data sources see[2]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0119952161 2015-09-30 Drill / Deepen / Reopen No Violations On location to check status of drive pipe/conductor drilling for this well. Upon arrival, HAD Drilling Contractors had just reached competent rock at 97. I witnessed the welding of the final 20 joint of 30 drive pipe and the drilling of the pipe into the ground to 117. HADs rig will now move to P#29760.
1444136087 2015-10-05 Drill / Deepen / Reopen No Violations Upon inspection, it was observed that HAD Drilling Contractors rig is now moved off of this hole and is sitting beside it. I spoke with Mr. Don Kreager of PDC and he stated that 118 of 30 drive pipe was set and that competent bedrock was encountered at 95. The rig will remain on the location until PDC decides how they want the mouse holes to be set and grouted.
1787538982 2015-09-28 Drill / Deepen / Reopen No Violations HAD Drilling Contractors is rigged up over the cellar for this well and will commence 30 drive pipe/conductor drilling operations on 9/29/2015.

For data sources see[3]