If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-23466 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.112888987,"lon":-81.79003739,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Montville Township | |
Operator Name: HARRISON ENERGY | |
Well Pad ID: | |
Farm/Lease Name: BROOKSIDE DEVELOPMENT CO | |
License Status: Final Restoration | |
License Date: 2003-05-27 | |
Spud Date: 1984-09-24 | |
Spud Drilling Contractor: STONE DRLG | |
Final Drill Date: 1984-09-29 | |
Well Total Depth: 3510 ft | |
Configuration: Vertical | |
Latitude: 41.112888987 | |
Longitude: -81.79003739 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-08-19 | Issued Date 8/19/83 Expired Date 2/15/84 Acres 0020000 Tool Type CRAF Proposed Formation CLINTON Proposed Depth 00000 Proposed Drill Depth 00000 |
CO | 1984-07-30 | 646 COASTAL PETROLEUM CORP GeoDate 7/30/84 |
Oil and Gas | 1984-07-30 | Issued Date 7/30/84 Expired Date 1/26/85 Acres 0020000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03510 Proposed Drill Depth 03510 |
Original Spud | 1984-09-24 | R.I. 8-4-84 |
Completed | 1984-09-29 | R.I. 8-4-84 |
Reached Total Depth | 1984-09-29 | R.I. 8-4-84 |
CO | 1984-10-12 | 646 COASTAL PETROLEUM CORP GeoDate 8/19/83 |
Completion Report Received | 1984-10-18 | R.I. 8-4-84 |
CO | 1992-11-06 | 2348 TRIAD RESOURCES INC GeoDate 7/30/84 |
CO | 1996-04-04 | 1217 HARRISON ENERGY GeoDate 7/30/84 |
APP | 2003-05-27 | Proposed Formations:CLINTON, Issued Date:5/27/2003, Expired Date:5/26/2004 6:00:00 AM, Drilling unit acres:20, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2003-07-25 | R.I. 8-4-84 |
Construction Permit Expires | 2004-05-26 | R.I. 8-4-84 |
Record Last Modified | 2017-02-15 | R.I. 8-4-84 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3372 | 3418 | 16 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | FRAC: H2O,SAND,N2 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | TRIAD RESOURCES INC | 1843 | 24 | 365 |
1994 | TRIAD RESOURCES INC | 1137 | 24 | 365 |
1995 | TRIAD RESOURCES INC | 548 | 13 | 365 |
1996 | HARRISON ENERGY | 169 | 3 | 100 |
1997 | HARRISON ENERGY | 429 | 0 | 100 |
1998 | HARRISON ENERGY | 288 | 0 | 365 |
1999 | HARRISON ENERGY | 209 | 0 | 365 |
2000 | HARRISON ENERGY | 70 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1993 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1994 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1995 | TRIAD RESOURCES INC | Brine | 0 | 365 |
1996 | HARRISON ENERGY | Brine | 0 | 100 |
1997 | HARRISON ENERGY | Brine | 0 | 100 |
1998 | HARRISON ENERGY | Brine | 0 | 365 |
1999 | HARRISON ENERGY | Brine | 0 | 365 |
2000 | HARRISON ENERGY | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL11750 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
0145362342 | 2003-11-25 | Final Restoration | No Violations | Final restoration approved, golf course construction, 30 degrees, sun. |
For data sources see[9]