Well ID: 34-103-25011 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.029263872,"lon":-81.87489972,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Guilford Township | |
Operator Name: BLEACHTECH LLC | |
Well Pad ID: | |
Farm/Lease Name: BLEACH TECH(SMP #1) | |
License Status: Plugged and Abandoned | |
License Date: 2014-11-17 | |
Spud Date: 2007-08-02 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2007-08-31 | |
Well Total Depth: 2462 ft | |
Configuration: Vertical | |
Latitude: 41.029263872 | |
Longitude: -81.87489972 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2006-12-12 | Proposed Formations:SALINA F1 SALT, Issued Date:12/12/2006, Expired Date:12/12/2007 6:00:00 AM, Drilling unit acres:, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2007-08-31 | |
Completion Report Received | 2008-03-19 | |
Last Compliance Report | 2012-10-24 | |
Plugged/Abandoned | 2014-10-17 | |
APP | 2014-11-17 | Proposed Formations:SALINA, Issued Date:11/17/2014, Expired Date:11/16/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Record Last Modified | 2015-09-24 | |
Construction Permit Expires | 2016-11-16 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
0 | 0 | 0 | SOLUTION MINING WELL; NOT PERFED; ONLY 500 GAL OF 30% HCL USED TO CLEAN UP OPEN HOLE |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0154091352 | 2007-08-16 | Drill / Deepen / Reopen | No Violations | J.D. Drilling at top of cement ready to drill out. |
0179038976 | 2007-08-30 | Drill / Deepen / Reopen | No Violations | Arrive to run 4 inch casing and found that we are waiting on cement crew.It takes both crews to do the job and after waiting found that job was cancelled because one crew was stuck on a job and would be latenight before they could make it. |
0203745442 | 2007-09-12 | Solution Mining Project | No Violations | Arrive today to grout well to surface today. Used 6 yards of 9 sk grout and was able to bring cement to surface. |
0239857033 | 2007-08-10 | Drill / Deepen / Reopen | No Violations | J.D Drilling is at 383 on surface with the rig broke down and will wait until Monday to start again . |
0322727412 | 2007-07-12 | Drill / Deepen / Reopen | No Violations | Rig is moving today and Friday .Start drilling Monday or after .This is a U.IC. Solution Mine Project |
0329387681 | 2007-11-29 | Solution Mining Project | No Violations | Check for restoration and found pits closed area graded. |
0343029420 | 2007-10-10 | Solution Mining Project | No Violations | This well has a service rig on well to drill out the bottom shoe and it is not going as planned.This well was to be logged later today but will have to re-scheduled for another day. |
0376825593 | 2012-04-06 | Solution Mining Project | No Violations | During my last inspection of this site there was an open pit on site. I returned today to check the pit liner and to see if pit was pumped off. The pit has a liner, which remains in place. The pit has been pumped off but has not been closed. The empty pit can remain until the service work has been completed next month. |
0447517964 | 2007-08-31 | Drill / Deepen / Reopen | No Violations | Run 4 inch casing to 2414 ft. and cemented with 630 sks to surface.Petroset - Paul - Rich - |
0449973092 | 2007-09-06 | Solution Mining Project | No Violations | Arrive for bond log today at 8 am. Then they are a no show and they are on the way and at 11 they arrived and after running in to bottom they broke down. |
0619787254 | 2010-06-08 | Preliminary Restoration | No Violations | Priliminary restoration has been passed but service rig has been back and some restoration work is needed. Rig is scheduled around the 4 th of July so after that the work can be completed. |
0644698142 | 2010-05-03 | Solution Mining Project | No Violations | Check wells and found them in operation. |
0654263317 | 2007-08-22 | Drill / Deepen / Reopen | No Violations | Nobody here so I am guessing that they are still broke down . |
0695559610 | 2007-09-06 | Solution Mining Project | No Violations | On site for cement bond log today which was guaranteed at 8 :30 today.They did call at that time and said they are a few minutes away.At 11 am they arrived and ran in to bottom and then broke down. |
0805426966 | 2007-08-13 | Drill / Deepen / Reopen | No Violations | Rig is at 385 ft on surface hole. Will start today |
0877335059 | 2007-08-15 | Solution Mining Project | No Violations | JD Drilling ran 560 ft. of 8 5/8 casing c/w 290 sks .Petroset - Paul -121/4 hole |
0881296309 | 2007-08-27 | Drill / Deepen / Reopen | No Violations | J.D. Drilling is at 1840 ft. on 7 7/8 hole dusting . |
0948092597 | 2014-10-22 | Plug / Plug Back | No Violations | Visited location on 10/22/2014 to check cement top. Top of cement remained at ~15-20 below ground level. Will continue to check on well to ensure no change in location of top of cement. |
0985728227 | 2007-09-04 | Completion Testing | No Violations | Wait on Log truck to run Bond log.And after waiting I found that it could not make it. |
1023886063 | 2014-10-20 | Plug / Plug Back | No Violations | Visited location on 10/20/2014 to check cement top. Top of cement seen at ~15-20 below ground level. Will continue to check on well to ensure no change in location of top of cement. |
1176309652 | 2014-12-11 | Plug / Plug Back | No Violations | Visited location on 12/11/2014. Permanent monument with permit number has been installed at the well. |
1195024917 | 2012-01-24 | Solution Mining Project | No Violations | Bishop Well Service is working to repair well today. There has been a roof collapse which parted the tubing. There is also a problem with the top of the 4.5 casing which has rotted off and needs repaired. Today they are going to run more fiberglass tubing back in hole and place a packer just below the bad 4.5 casing. While this is only a temporary repair they can operate until all of the equipment is in place in order to dig up around the well and make the proper repairs. They tested the packer and the well is back in operation. |
1251091410 | 2014-10-23 | Plug / Plug Back | No Violations | Visited location on 10/23/2014 to check cement top. Top of cement remained at ~15-20 below ground level. Will continue to check on well to ensure no change in location of top of cement. |
1320881537 | 2007-08-31 | Solution Mining Project | No Violations | Cement 4 inch casing from 2450 ft. to surface with 630 sks cement.Petroset - Rich -Had latch down at 1800 P.S.I. After having trouble dispacing cement. |
1433599064 | 2007-09-05 | Solution Mining Project | No Violations | Wait on log truck again and after 2 hours I felt that they would not show up again and left.Cement bond log is needed after poor cement circulation. |
1441035461 | 2008-09-10 | Preliminary Restoration | No Violations | Meets requirements for Primary restoration. |
1456562969 | 2014-10-16 | Plug / Plug Back | No Violations | Arrived on location on 10/16/2014 to witness plugging operations at the Bleachtech #2 well. Steve Ochs was also onsite to witness plugging operations. Appalachian Wireline was already onsite and rigged up. Decision made to attempt another pressure test prior to shooting off the tubing. Attempted test repeatedly - all tests failed. Left to attend meeting; Steve Ochs remained onsite to witness shooting off the tubing and setting the bottom plug. |
1491918513 | 2007-08-20 | Drill / Deepen / Reopen | No Violations | Rig is broke down today and is not going to be drilling. |
1499468489 | 2008-03-21 | Solution Mining Project | No Violations | Well is in operation. Portable pump attached to well head. GPS location. |
1533942139 | 2007-10-08 | Solution Mining Project | No Violations | Pressure test well for 15 minute test at 500 P.S.I. Test passed with no drop off of pressure. |
1535565937 | 2007-09-12 | Solution Mining Project | No Violations | Used 5 yards of 9 sk grout to cement well to surface. |
1580742264 | 2014-10-15 | Plug / Plug Back | No Violations | Arrived on location on 10/15/2014 to witness plugging operations at the Bleachtech #2 well. Bishop Well Service was on location, finishing pulling tubing and preparing to set the bridge plug. Appalachian Wireline arrived, rigged up, and ran in the hole to set the bridge plug. Decision made to set bridge plug at 2,357, as it is within 50 of the bottom of the hole, in good quality cement, and outside of the collar. Set bridge plug and rig down Appalachian Wireline. Pressured well up 500# to test bridge plug per special plugging conditions - test failed almost immediately. Worked tubing up and down and tested again - test failed. While working tubing up and down, the packer got stuck above the bridge plug. Decision made to shut down for the day and resume operations tomorrow. Plan forward is to shoot off tubing above the packer and set 200 bottom plug in the morning. |
1615734491 | 2007-08-30 | Solution Mining Project | No Violations | Run 4 inch casing in well , wait on cement crew to cement casing which has to be witnessed and cement crew cancelled job.The job was cancelled because two full crews are needed to circulate cement from top to bottom and one crew could not get free. |
1741391819 | 2007-08-02 | Solution Mining Project | No Violations | Rig moving today and may start drilling . |
1796661606 | 2014-10-17 | Plug / Plug Back | No Violations | Arrived on location on 10/17/2014 to witness plugging operations at the Bleachtech #2 well. Ran in the hole with 2 3/8 tubing to tag cement. Tagged top of cement at 2,099. Rigged up Petroset. Established circulation prior to setting the all plugs. Tripped out of hole with tubing and ran back in with open-ended tubing in order to run hulls with the top plug. Cemented well to surface. After pulling remaining tubing, the cement fell down ~5-6. Will monitor well per special plugging conditions for at least a week and then top off with bagged Portland cement. |
1841911274 | 2012-04-04 | Solution Mining Project | No Violations | I was on site today to witness a downhole camera go in the well. We found the camera would only go to 2300. The tubing has been cut off from a roof collapse. The operator wanted to see what was at 2300 so he could determine how to correct his well. Bill Davis/ Service Co. will run fiberglass tubing back in the well and see if it will go through an obstruction at 2300. |
1859551740 | 2014-10-21 | Plug / Plug Back | No Violations | Visited location on 10/21/2014 to check cement top. Top of cement remained at ~15-20 below ground level. Will continue to check on well to ensure no change in location of top of cement. |
1948305040 | 2012-10-03 | Solution Mining Project | No Violations | On location to conduct a Water-Brine interface mechanical integrity test. |
1990585353 | 2014-10-27 | Plug / Plug Back | No Violations | Visited location on 10/27/2014 to check on the status of the top of cement. The cement top remains at ~15-20 below ground level. |
2022803398 | 2007-09-05 | Solution Mining Project | No Violations | Arrive to run bond log and the log truck is on the way , no there broke down and will not make it again today. |
2143074898 | 2007-09-04 | Solution Mining Project | No Violations | Arrive to witness cement bond log and after waiting 2 hours found job cancelled. |