If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-103-25029 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.029718387,"lon":-81.87519626,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Medina | |
Municipality: Guilford Township | |
Operator Name: BLEACHTECH LLC | |
Well Pad ID: | |
Farm/Lease Name: BLEACH TECH (SMP#1) | |
License Status: Active Injection | |
License Date: 2009-01-23 | |
Spud Date: 2009-02-16 | |
Spud Drilling Contractor: H A D INC | |
Final Drill Date: 2009-02-19 | |
Well Total Depth: 2490 ft | |
Configuration: Vertical | |
Latitude: 41.029718387 | |
Longitude: -81.87519626 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2009-01-23 | Proposed Formations:SALINA F 1 SALT, Issued Date:1/23/2009, Expired Date:1/23/2010 6:00:00 AM, Drilling unit acres:0, Proposed Well Type:SM, Proposed Well Class:SMP |
Reached Total Depth | 2009-02-19 | |
Completion Report Received | 2009-05-07 | |
Construction Permit Expires | 2010-01-23 | |
Last Compliance Report | 2014-03-27 | |
Record Last Modified | 2015-09-24 |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 | NOT PERFED OR TREATED; ONLY CIRCULATED WATER FOR SOLUTION MINING. |
For data sources see[3]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0013924241 | 2012-02-16 | Solution Mining Project | No Violations | Davis Well Service is working on this well today. They excavated the pit and lined it with a 6 mil liner. They circulated the tubing to the bottom of the hole. They added two more joints of tubing to the string to replace the two joints ripped off during the roof collapse. |
0165431538 | 2009-02-23 | Drill / Deepen / Reopen | No Violations | HAD is moving today and should be ready to drill today and set surface Tuesday.Pit level is high and advise pump pits to next location or haul away . |
0510972722 | 2009-03-04 | Drill / Deepen / Reopen | No Violations | Check on pits because they were both full to the max .Check today and found pits at 3/4 full .Liner in place. |
0557538575 | 2009-03-12 | Solution Mining Project | No Violations | M.I.T on 8 5/8 casing .Pumped casing up to 500 P.S.I for 15 minutes and test passed with no drop off. |
0757597375 | 2010-05-03 | Solution Mining Project | No Violations | Check wells and found them in operation |
0956733833 | 2018-03-30 | Solution Mining Project | No Violations | I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time. |
1066958735 | 2009-02-11 | Solution Mining Project | No Violations | Review site for Columbus office on oversite for obstructions or overhead problems.Pre Drill site inspection found no problems for drilling. |
1078247582 | 2010-06-11 | Solution Mining Project | No Violations | Arrive today and found that the service rig is pulling tubing and will need to replace the top collar on the 4 inch as well. |
1135210996 | 2017-12-01 | Solution Mining Project | No Violations | I found the injection well in operation on the day of my inspection. There is an identification sign displayed on a steel post next to the well. There are no problems noted at this time. |
1194083787 | 2017-05-18 | Solution Mining Project | No Violations | Inspected well on 05/18/2017 with Inspector Steve Ochs at the request of Andrew Adgate to confirm the well status. The well has been placed into production, and well identification is clearly displayed. The well status (AI) is correct. No problems were noted at the time of the inspection. |
1279579512 | 2010-06-08 | Preliminary Restoration | No Violations | Priliminary restoration has been passed, but service rig has been back in and some restoration work will need done. Wait until after the 4 th when rig is scheduled back again. |
1342911403 | 2009-02-19 | Drill / Deepen / Reopen | No Violations | HAD Drilling has set 2407 ft 8 5/8 casing c/w 435 sks - Petroset - |
1396381263 | 2014-03-27 | Solution Mining Project | No Violations | On location to help with a Water-Brine Interface MIT test on this well. |
1397384955 | 2009-07-02 | Preliminary Restoration | No Violations | Work on 4 wells today at Bleach Tech.All pits are closed and area is graded and seeded. |
1487638274 | 2009-06-16 | Solution Mining Project | No Violations | Davis Well is working on well tody and have found a tubing hole .Pull tubing and replace with another string.Well has connected with the # 3 well |
1683598600 | 2009-02-17 | Solution Mining Project | No Violations | HAD Drilling set 637 ft. of 8 5/8 casing c/w 310 sks. Petroset- Rich - 11 inch hole to 653 ft - No conductor pipe set.Good returns . |
2131317686 | 2009-03-24 | Solution Mining Project | No Violations | Hook up to well with mudpump and circulate well . After getting everything unfrozen. |
For data sources see[4]