If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-013-20746 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.015018415,"lon":-80.94600829,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Belmont | |
Municipality: Smith Township | |
Operator Name: RICE DRILLING D LLC | |
Well Pad ID: US-OH-001042 | |
Farm/Lease Name: GOLD DIGGER | |
License Status: Producing | |
License Date: 2014-07-23 | |
Spud Date: 2014-07-04 | |
Spud Drilling Contractor: PATTERSON DRILLING | |
Final Drill Date: 2014-08-04 | |
Well Total Depth: 18767 ft | |
Configuration: Horizontal | |
Latitude: 40.015018415 | |
Longitude: -80.94600829 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-01-31 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:1/31/2014, Expired Date:1/31/2016 12:00:00 PM, Drilling unit acres:0, Proposed Well Type:ST, Proposed Well Class:STRT |
APP | 2014-07-23 | Proposed Formations:UTICA/POINT PLEASANT, Issued Date:7/23/2014, Expired Date:7/22/2016 12:00:00 PM, Drilling unit acres:386.592, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2014-08-04 | |
Completion Report Received | 2015-05-22 | |
Correction to Well | 2015-06-05 | CHANGE IN TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED SURVEY PLAT. |
Construction Permit Expires | 2016-07-22 | |
Record Last Modified | 2018-04-06 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2015-05-28 | 9705 | 18752 | 0 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 11/22/2014 | 12/27/2014 | 9528 | 17,254,200.0 | 23,286,700.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Bio- | WFT | Bactericide | Sodium Bromide | 7647-15-6 | 1.5 | 0.000346921 | 597.9 |
2,2-dibromo-3-nitriloproppionamide | 10222-01-2 | 5 | 0.0011564 | 1993 | ||||
Polyethylene Glycol | 25322-68-3 | 65 | 0.0150332 | 25909 | ||||
Dibromoacetonitrile | 3252-43-5 | 0.5 | 0.00011564 | 199.3 | ||||
WAI-251LC | WFT | Inhibitor | Triethylphosphate | 78-40-0 | 5 | 0.00002624 | 45.22 | |
Tar bases, quinoline derivs, benzyl chloride-quaternized | 72480-70-7 | 10 | 0.00005248 | 90.45 | ||||
1-Octanol | 111-87-5 | 5 | 0.00002624 | 45.22 | ||||
1-Decanol | 112-30-1 | 5 | 0.00002624 | 45.22 | ||||
Isopropyl Alcohol | 67-63-0 | 5 | 0.00002624 | 45.22 | ||||
Ethylene Glycol | 111-76-2 | 40 | 0.000209924 | 361.79 | ||||
Ethoxylated Nonylphenol | 68412-54-4 | 5 | 0.00002624 | 45.22 | ||||
N,N-Dimethylformamide | 68-12-2 | 20 | 0.000104962 | 180.9 | ||||
2-Butoxyethanol | 111-76-2 | 10 | 0.00005248 | 90.45 | ||||
40/70 Premium | WFT | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 2.60115 | 4,482,930.0 | |
WIC-641L | WFT | Iron Control | Citric acid | 77-92-9 | 60 | 0.00184223 | 3174.98 | |
15% HCL | WFT | Acid | Hydrochloric Acid | 7647-01-0 | 15 | 0.046334 | 517107 | |
Water | Rice Energy | Carrier / Base Fluid | Carrier / Base Fluid - Water | 7732-18-5 | 100 | 85.8555 | 147,967,000.0 | |
100 Mesh | WFT | Proppant | Crystalline Silica in the form of Quartz | 14808-60-7 | 100 | 10.601 | 17,746,800.0 | |
WSI-685L | WFT | Inhibitor | Monoethanolamine Hydrochloride | 2002-24-6 | 15 | 0.00405873 | 6995 | |
Ammonium Chloride | 12125-02-9 | 15 | 0.00405873 | 6995 | ||||
Methyl Alcohol | 67-56-1 | 2.5 | 0.000676455 | 1165.83 | ||||
Friction Reducers | WFT | Friction Reducers | Petroleum distillates, hydrotreated light | 64742-47-8 | 40 | 0.23185 | 399581 | |
Ammonium acetate | 631-61-8 | 5 | 0.00289813 | 4994.77 | ||||
Other Chemicals | Phosphonic acid ammonium salt | Proprietary | 0 | 0.000607403 | 1064.83 | |||
Cinnamaldehyde | 104-55-2 | 0 | 0.00002624 | 45.22 | ||||
Ethylene Oxide | 75-21-8 | 0 | 0.00000525 | 9.04 | ||||
Dioxane | 123-91-1 | 0 | 0.00000525 | 9.04 | ||||
Acetaldehyde | 75-07-0 | 0 | 0.00000525 | 9.04 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2014-11-22 | H2O | 15 | 9028 Bbl | 504940 | Weatherford | STAGE 1/45
36 SHOTS STAGES 2-44 SEE IMAGES |
2014-12-25 | H2O | 15 | 8812 Bbl | 500580 | Weatherford | STAGE 45/45
36 SHOTS |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | RICE DRILLING D LLC | 4295595 | 0 | 314 |
2016 | RICE DRILLING D LLC | 3643170 | 0 | 360 |
2017 | RICE DRILLING D LLC | 1737855 | 0 | 352 |
2018 | RICE DRILLING D LLC | 362123 | 0 | 138 |
2019 | RICE DRILLING D LLC | 326919 | 0 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | RICE DRILLING D LLC | Brine | 29153 | 314 |
2016 | RICE DRILLING D LLC | Brine | 35274 | 360 |
2017 | RICE DRILLING D LLC | Brine | 14939 | 352 |
2018 | RICE DRILLING D LLC | Brine | 11018 | 138 |
2019 | RICE DRILLING D LLC | Brine | 10295 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0061079268 | 2018-04-06 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. Gauges were present for monitoring annular pressure 13.375 inch diameter casing read 350 pounds per square inch, 9.625 inch diameter casing read 1950 pounds per square inch. The production equipment included a Gas Processing unit, a line heater and a sand trap. Also present 5- 400 barrel purge tanks shared with 3401320747, 3401321072, 3401321073, 3401321074, 3401321075, 3401321077. Identification tags were present and production was up to date. |
0145918564 | 2018-07-10 | Production Wells | No Violations | On site inspection accompanied by ODNR Inspector Ryan Armstrong. The well site entrance point was marked with signage and the lease road was of gravel construction. There is 2 well pads sitting next to one another back the same lease road with the Gold Digger being the rear pad and the Sonuvadigger being the pad closest to State Route 9. There was recently 5 wells newly drilled on the Gold Digger pad and 2 prior producing wells. The said well was equipped with electronic annular pressure monitoring on both the 13.375 and 9.625 well head sections. The 9.625 well head gauge showed 465 psi and the 13.375 showed 450 psi on the manual gauge. The well was selling off the production tubing tree with 2 manually controlled valves in place on the well head followed by an emergency shut down valve with multiple shut down point on the well pad. Also present on location is one gas processing unit present for each well supported by a production fluid facility consisting of 5 steel tanks of 400 barrel construction design situated inside a polymer lined steel containment dike area. |
0152914605 | 2018-08-23 | Production Wells | No Violations | Upon inspection the well was observed to be equipped with a lower A and upper B section with 2 diameter riser pipes attached to the A&B section outlet ports, the riser pipes are equipped with valves and gauges. The A section gauge which monitors the pressure between the 13.375 and 9.625 diameter casing string reads 356 pound pressure. The B section gauge which monitors the pressure between the 5.5 and 9.625 diameter strings reads 344 pounds pressure. The 5.5 diameter production casing reads 1,400 pounds pressure and the production tubing head reads 1,200 pounds pressure. 7 wells total are producing on this pad. The production fluid storage area consists of 5 steel design 400 barrel fluid volume tanks that are situated inside a polymer lined steel containment dike area. |
0227755179 | 2014-11-17 | Completion Testing | No Violations | On this day completions work was to begin. A zipper frac was to be utilized where the two wells on the pad would be completed at the same time. No violations noted. |
0296446333 | 2014-08-04 | Drill / Deepen / Reopen | No Violations | Halliburton cemented the 5.5 casing on 8/3/2014. Patterson 349 is moving to the 3H well this date. |
0313000726 | 2018-04-06 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a plunger lift system with valves in the open position. Gauges were present for monitoring annular pressure 13.375 inch diameter casing read 350 pounds per square inch, 9.625 inch diameter casing read 1950 pounds per square inch. The production equipment included a Gas Processing unit, a line heater and a sand trap. Also present 5- 400 barrel purge tanks shared with 3401320747, 3401321072, 3401321073, 3401321074, 3401321075, 3401321077. Identification tags were present and production was up to date. |
1155724587 | 2014-07-28 | Drill / Deepen / Reopen | No Violations | On the date of inspection I accompanied ODNR Inspector Andrew Corder to check the drilling status of the well. Refer to Andrew Corders report for further details. |
1323896946 | 2014-06-02 | Drill / Deepen / Reopen | No Violations | Onsite with Inspector Andrew Corder. See his inspection report this date. |
1408366276 | 2014-08-13 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Patterson 349 was drilling in the lateral section and would be running casing soon. No violations noted. |
1595302668 | 2014-06-02 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Patterson # 349 was rigging up to begin drilling. No violations noted. |
1623693553 | 2014-07-30 | Drill / Deepen / Reopen | No Violations | On the day of my inspection the company had almost reached total depth. The 5.5 casing would be ran and cemented after reaching T.D and cleaning the hole. No violations noted. |
1813658199 | 2018-07-10 | Production Wells | No Violations | On the day of my inspection I witnessed that the well was equipped with a four-string casing design with 20-inch diameter surface casing, 13.375-inch diameter intermediate casing, 9.625-inch diameter deep intermediate casing and 5.5-inch diameter production casing, and 2.875-inch diameter tubing, the well was currently under normal production and appeared to be open flowing. Annular pressure monitoring was in place, the 9.625-inch diameter intermediate casing gauge read 2215 pounds per square inch, the 13.375-inch diameter surface casing gauge read 385 pounds per square inch. The 5.5-inch diameter production casing was also at 2215 pounds per square inch and appeared to be communicating with the 9.625-inch diameter deep intermediate casing. Production equipment included an individual Gas Processing unit. Shared production equipment included a dehydrator, 2 phase separators, contact tower, and 3- 400-barrel purge tanks shared with 34013210760000, 34013210750000, 34013210740000, 34013210730000, 34013210720000, 34013207460000. The well pad and all equipment were contained in an earthen dike with secondary containment around the production tanks. There were multiple Emergency Shutoff Devices on location, Identification tags were present, and production was up to date. |
1852527936 | 2014-07-28 | Drill / Deepen / Reopen | No Violations | On the day of my inspection Patterson 349 was drilling ahead in the lateral section. No violations noted. |
1967183186 | 2014-07-09 | Casing String Witnessed | No Violations | On the day of my inspection the 13.375 casing was ran and cemented. See cement ticket for details. No violations noted. |
2042973903 | 2018-11-21 | Production Wells | No Violations | Status check inspection found the well equipped with a production tree with (2) primary gate valves and an emergency shut down device present in the 3.5 diameter production flow line. The tubing head pressure is 500 pounds per square inch (psi) the 13.375 diameter casing head pressure is 21 psi and the 9.625 diameter casing pressure is 250 psi. The 5.5 diameter casing well head section has 2,000 pounds pressure on the gauge. The production facility consists of (5) 400 barrel capacity steel tanks. |
For data sources see[10]