If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-133-24171 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.09347854,"lon":-81.06850777,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Portage | |
Municipality: Palmyra Township | |
Operator Name: EVERFLOW EASTERN PTNS L P | |
Well Pad ID: | |
Farm/Lease Name: SANDERS UNIT | |
License Status: Producing | |
License Date: 1997-10-01 | |
Spud Date: 1997-11-21 | |
Spud Drilling Contractor: IPSCO | |
Final Drill Date: 1997-12-01 | |
Well Total Depth: 7520 ft | |
Configuration: Vertical | |
Latitude: 41.093478540 | |
Longitude: -81.06850777 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 1997-10-01 | Proposed Formations:CLINTON/ROSE RUN, Issued Date:10/1/97, Expired Date:10/1/98 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW |
Original Spud | 1997-11-21 | RBDMS Rec |
Completed | 1997-12-01 | RBDMS Rec |
Reached Total Depth | 1997-12-01 | RBDMS Rec |
Completion Report Received | 1998-07-13 | RBDMS Rec |
Construction Permit Expires | 1998-10-01 | RBDMS Rec |
Change of Owner | 2004-05-06 | Operator changed from 2911, WEINSZ OIL & GAS INC to 7626, M & M ROYALTY LTD |
Change of Owner | 2014-09-04 | Operator changed from 7626, M & M ROYALTY LTD to 84, EVERFLOW EASTERN PTNS L P |
Record Last Modified | 2017-02-15 | RBDMS Rec |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1998-09-21 | 7381 | 7434 | 31 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 44500 Gal | 50000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | WEINSZ OIL & GAS INC | 52355 | 832 | 296 |
1999 | WEINSZ OIL & GAS INC | 45603 | 289 | 365 |
2000 | WEINSZ OIL & GAS INC | 29776 | 240 | 365 |
2001 | WEINSZ OIL & GAS INC | 21930 | 128 | 365 |
2002 | WEINSZ OIL & GAS INC | 14967 | 0 | 365 |
2003 | WEINSZ OIL & GAS INC | 952 | 0 | 365 |
2004 | M & M ROYALTY LTD | 21 | 0 | 365 |
2005 | M & M ROYALTY LTD | 7250 | 0 | 365 |
2006 | M & M ROYALTY LTD | 3280 | 948 | 365 |
2007 | M & M ROYALTY LTD | 8878 | 1851 | 365 |
2008 | M & M ROYALTY LTD | 8350 | 1150 | 365 |
2009 | M & M ROYALTY LTD | 6350 | 1125 | 365 |
2010 | M & M ROYALTY LTD | 5605 | 680 | 365 |
2011 | M & M ROYALTY LTD | 2271 | 498 | 365 |
2012 | M & M ROYALTY LTD | 3338 | 509 | 366 |
2013 | M & M ROYALTY LTD | 2110 | 609 | 365 |
2014 | EVERFLOW EASTERN PTNS L P | 510 | 220 | 150 |
2015 | EVERFLOW EASTERN PTNS L P | 3487 | 408 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | 4015 | 652 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | 4488 | 547 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | 3455 | 464 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1998 | WEINSZ OIL & GAS INC | Brine | 2777 | 296 |
1999 | WEINSZ OIL & GAS INC | Brine | 3120 | 365 |
2000 | WEINSZ OIL & GAS INC | Brine | 2415 | 365 |
2001 | WEINSZ OIL & GAS INC | Brine | 1970 | 365 |
2002 | WEINSZ OIL & GAS INC | Brine | 2156 | 365 |
2003 | WEINSZ OIL & GAS INC | Brine | 219 | 365 |
2004 | M & M ROYALTY LTD | Brine | 70 | 365 |
2005 | M & M ROYALTY LTD | Brine | 280 | 365 |
2006 | M & M ROYALTY LTD | Brine | 1129 | 365 |
2007 | M & M ROYALTY LTD | Brine | 2690 | 365 |
2008 | M & M ROYALTY LTD | Brine | 1505 | 365 |
2009 | M & M ROYALTY LTD | Brine | 1455 | 365 |
2010 | M & M ROYALTY LTD | Brine | 1315 | 365 |
2011 | M & M ROYALTY LTD | Brine | 411 | 365 |
2012 | M & M ROYALTY LTD | Brine | 1139 | 366 |
2013 | M & M ROYALTY LTD | Brine | 820 | 365 |
2014 | M & M ROYALTY LTD | Brine | 1269 | 212 |
2015 | EVERFLOW EASTERN PTNS L P | Brine | 1425 | 365 |
2016 | EVERFLOW EASTERN PTNS L P | Brine | 1575 | 365 |
2017 | EVERFLOW EASTERN PTNS L P | Brine | 1135 | 365 |
2018 | EVERFLOW EASTERN PTNS L P | Brine | 1307 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0076317423 | 2010-07-07 | Production Wells | No Violations | CASE 10-006 The required muffler has been installed on the pumpjack motor and the noise complaint is abated. The original complaint was received on 6/14 with response by Insp Roberts. |
0620672516 | 2010-06-14 | Production Wells | No Violations | I received a call from Marlene Hall of the Uniontown office about a well noise. Mr. John Ferrell of 3776 Wayland road, Diamond Ohio, 44122, Office number 330-668-7394, home number 330-654-4290. I called Mr. Ferrell to let him know that I would be there in about 15 minutes. He stated that the muffler was very loud on the pumping unit. He had called the M & M office and was told that the muffler came with the motor. I arrived on the location, GPSd the wellhead. There was a small muffler on the pump motor. I called Matt Weintz of M & M (330-497-4343). Matt stated that it shouldnt be a problem to fix the muffler. He would have Bob Allen(field Superintendent 330-324-1958) call me. The pumper showed up while I was there. Don Hall is the pumper. He also said that getting the muffler changed should not be a problem. He would call Bob Allen and get things done this week. I told Don Hall that I would check back later in the week. This complaint continues. |
0844423320 | 2010-06-15 | Production Wells | No Violations | I received a call from Bob Allen(330-324-1958). He is going to install a car muffler on the gas motor. Will have the muffler installed by 6/18/10. This complaint continues. |
1393760162 | 2010-06-18 | Production Wells | No Violations | I inspected the pumping unit motor. The old muffler was still on. I called Bob Alan(330-324-1958). He had to order a stainless steel pipe from NAPA. The car muffler will get installed by this afternoon. This complaint continues. |
For data sources see[9]