X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-133-24191

Well Details

Well ID: 34-133-24191
Loading map...
Country: United States
State: Ohio
County: Portage
Municipality: Franklin Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: HORNING UNIT
License Status: Producing
License Date: 1998-09-14
Spud Date: 1998-09-18
Spud Drilling Contractor: MOHAWK DRLG
Final Drill Date: 1998-09-25
Well Total Depth: 4311 ft
Configuration: Vertical
Latitude: 41.149627438
Longitude: -81.32458014

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 1998-03-19 Proposed Formations:CLINTON, Issued Date:3/19/98, Expired Date:3/19/99 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:
APP 1998-09-14 Proposed Formations:CLINTON, Issued Date:9/14/98, Expired Date:9/14/99 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:POOL
Change of Owner 1998-09-14 Operator changed from 2651, D & L ENERGY INC to 84, EVERFLOW EASTERN PTNS L P. D & L's APPLICATION WAS CANCELLED.
Original Spud 1998-09-18 RBDMS Rec THIS PERMIT WAS CANCELLED 8-10-98 PER REQUEST OF BEN LUPO.
Completed 1998-09-25 RBDMS Rec THIS PERMIT WAS CANCELLED 8-10-98 PER REQUEST OF BEN LUPO.
Reached Total Depth 1998-09-25 RBDMS Rec THIS PERMIT WAS CANCELLED 8-10-98 PER REQUEST OF BEN LUPO.
Completion Report Received 1998-10-22 RBDMS Rec THIS PERMIT WAS CANCELLED 8-10-98 PER REQUEST OF BEN LUPO.
Construction Permit Expires 1999-09-14 RBDMS Rec THIS PERMIT WAS CANCELLED 8-10-98 PER REQUEST OF BEN LUPO.
Record Last Modified 2017-02-15 RBDMS Rec THIS PERMIT WAS CANCELLED 8-10-98 PER REQUEST OF BEN LUPO.

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
1998-12-22 4090 4154 50

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 97851 Gal 80000

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1999 EVERFLOW EASTERN PTNS L P 6747 331 91
2000 EVERFLOW EASTERN PTNS L P 89761 1409 365
2001 EVERFLOW EASTERN PTNS L P 85279 788 365
2002 EVERFLOW EASTERN PTNS L P 54072 504 365
2003 EVERFLOW EASTERN PTNS L P 50051 343 365
2004 EVERFLOW EASTERN PTNS L P 42968 323 365
2005 EVERFLOW EASTERN PTNS L P 39992 267 365
2006 EVERFLOW EASTERN PTNS L P 32108 278 365
2007 EVERFLOW EASTERN PTNS L P 32506 170 365
2008 EVERFLOW EASTERN PTNS L P 30632 173 365
2009 EVERFLOW EASTERN PTNS L P 21753 93 365
2010 EVERFLOW EASTERN PTNS L P 17371 91 181
2011 EVERFLOW EASTERN PTNS L P 26477 166 365
2012 EVERFLOW EASTERN PTNS L P 25431 82 366
2013 EVERFLOW EASTERN PTNS L P 19040 162 334
2014 EVERFLOW EASTERN PTNS L P 15927 82 275
2015 EVERFLOW EASTERN PTNS L P 16382 79 365
2016 EVERFLOW EASTERN PTNS L P 953 0 365
2017 EVERFLOW EASTERN PTNS L P 16198 86 365
2018 EVERFLOW EASTERN PTNS L P 20959 136 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1999 EVERFLOW EASTERN PTNS L P Brine 324 91
2000 EVERFLOW EASTERN PTNS L P Brine 511 365
2001 EVERFLOW EASTERN PTNS L P Brine 384 365
2002 EVERFLOW EASTERN PTNS L P Brine 150 365
2003 EVERFLOW EASTERN PTNS L P Brine 52 365
2004 EVERFLOW EASTERN PTNS L P Brine 151 365
2005 EVERFLOW EASTERN PTNS L P Brine 40 365
2006 EVERFLOW EASTERN PTNS L P Brine 56 365
2007 EVERFLOW EASTERN PTNS L P Brine 90 365
2008 EVERFLOW EASTERN PTNS L P Brine 95 365
2009 EVERFLOW EASTERN PTNS L P Brine 0 365
2010 EVERFLOW EASTERN PTNS L P Brine 0 181
2011 EVERFLOW EASTERN PTNS L P Brine 63 365
2012 EVERFLOW EASTERN PTNS L P Brine 45 366
2013 EVERFLOW EASTERN PTNS L P Brine 0 334
2014 EVERFLOW EASTERN PTNS L P Brine 62 275
2015 EVERFLOW EASTERN PTNS L P Brine 31 365
2016 EVERFLOW EASTERN PTNS L P Brine 0 365
2017 EVERFLOW EASTERN PTNS L P Brine 0 365
2018 EVERFLOW EASTERN PTNS L P Brine 72 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0163880780 2018-11-27 UrbanProduction Wells No Violations Status check inspection of this Clinton Sandstone well. My inspection found the wellhead fenced and secured with board on board fencing with a cage and a locked man door. The wellhead is equipped with 1.5 tubing and is operating with the aid of a plunger lift system. This well produces to a diked tank battery just north of the park gate. The battery is secured with chain link fencing, three (3) strands of barbed wire, and a locked man door. The battery contains one (1) low-profile, 140 barrel tank, one (1) 50 barrel tank, and a horizontal separator. A gauge on the separator indicates a pressure just below 50psi and the 16 day chart was changed 7 days ago. The chart indicates a differential production pressure between 40psi and 100psi. There is a Dominion Roots meter run just south of the tank battery and it is fenced, locked, and secured. The required ID is posted at the wellhead and at the tank battery. No violations.
iDIAN00361 2000-01-26 Preliminary Restoration No Violations

For data sources see[9]

References