If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-23123 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.433697324,"lon":-82.23138349,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Union Township | |
Operator Name: MARAM ENERGY INC | |
Well Pad ID: | |
Farm/Lease Name: WALKER BILLIE S | |
License Status: Producing | |
License Date: 1982-04-19 | |
Spud Date: 1982-06-07 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-06-09 | |
Well Total Depth: 3100 ft | |
Configuration: Vertical | |
Latitude: 40.433697324 | |
Longitude: -82.23138349 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1982-04-19 | Issued Date 4/20/82 Expired Date 10/17/82 Acres 0050000 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 03100 Proposed Drill Depth 03100 |
Original Spud | 1982-06-07 | |
Completed | 1982-06-09 | |
Reached Total Depth | 1982-06-09 | |
CO | 1982-06-15 | 1529 JADWIN ENERGY MANAGE INC GeoDate 4/19/82 |
Construction Permit Expires | 1982-10-17 | |
Completion Report Received | 1986-05-09 | |
CO | 1986-10-31 | 1305 R I G DRILLING INC GeoDate 4/19/82 |
CO | 1995-07-15 | 2070 HALWELL COMPANY GeoDate 4/19/82 |
Change of Owner | 2002-03-18 | Operator changed from 2070, HALWELL COMPANY to 476, MARAM ENERGY CO |
Record Last Modified | 2017-02-15 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 3020 | 3026 | 9 |
2006-09-11 | 3056 | 3060 | 5 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 1500 Bbl | 45000 |
For data sources see[4]
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1986 | R I G DRILLING INC | Brine | 0 | 365 |
1987 | R I G DRILLING INC | Brine | 60 | 365 |
1988 | R I G DRILLING INC | Brine | 0 | 365 |
1989 | R I G DRILLING INC | Brine | 0 | 365 |
1990 | R I G DRILLING INC | Brine | 30 | 365 |
1991 | R I G DRILLING INC | Brine | 0 | 365 |
1992 | R I G DRILLING INC | Brine | 0 | 365 |
1993 | R I G DRILLING INC | Brine | 0 | 365 |
1995 | STONEBRIDGE OPERATING CO LLC | Brine | 113 | 238 |
1996 | STONEBRIDGE OPERATING CO LLC | Brine | 0 | 0 |
1997 | STONEBRIDGE OPERATING CO LLC | Brine | 0 | 0 |
1998 | STONEBRIDGE OPERATING CO LLC | Brine | 0 | 0 |
2000 | STONEBRIDGE OPERATING CO LLC | Brine | 0 | 364 |
2001 | STONEBRIDGE OPERATING CO LLC | Brine | 0 | 0 |
2005 | MARAM ENERGY INC | Brine | 270 | 365 |
2006 | MARAM ENERGY INC | Brine | 240 | 365 |
2007 | MARAM ENERGY INC | Brine | 150 | 365 |
2008 | MARAM ENERGY INC | Brine | 200 | 365 |
2009 | MARAM ENERGY INC | Brine | 75 | 365 |
2010 | MARAM ENERGY INC | Brine | 175 | 365 |
2011 | MARAM ENERGY INC | Brine | 155 | 365 |
2012 | MARAM ENERGY INC | Brine | 120 | 366 |
2013 | MARAM ENERGY INC | Brine | 0 | 365 |
2014 | MARAM ENERGY INC | Brine | 80 | 365 |
2015 | MARAM ENERGY INC | Brine | 135 | 365 |
2016 | MARAM ENERGY INC | Brine | 160 | 365 |
2017 | MARAM ENERGY INC | Brine | 140 | 365 |
2018 | MARAM ENERGY INC | Brine | 90 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
000PL14826 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
1185406867 | 2017-12-20 | Production Wells | No Violations | This well is a producing well. The production reporting is current with this well. There were no issues to note during this inspection. |
For data sources see[9]