If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23740 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.124950095,"lon":-81.91311879,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Chester Township | |
Operator Name: RAINBOW OIL & GAS | |
Well Pad ID: | |
Farm/Lease Name: WOOD (ERP #9) | |
License Status: Producing | |
License Date: 2018-06-05 | |
Spud Date: 2014-12-15 | |
Spud Drilling Contractor: MONROE DRILLING OPERATION, LLC | |
Final Drill Date: 2014-12-31 | |
Well Total Depth: 1942 ft | |
Configuration: Vertical | |
Latitude: 39.124950095 | |
Longitude: -81.91311879 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2014-11-04 | Proposed Formations:BEREA, Issued Date:11/4/2014, Expired Date:11/3/2016 12:00:00 PM, Drilling unit acres:56.64, Proposed Well Type:OG, Proposed Well Class:POOL |
Last Compliance Report | 2014-12-29 | PASSED SURFACE CASING MIT ON 12/23/2014. |
Reached Total Depth | 2014-12-31 | PASSED SURFACE CASING MIT ON 12/23/2014. |
Completion Report Received | 2016-08-01 | PASSED SURFACE CASING MIT ON 12/23/2014. |
APP | 2018-06-05 | Proposed Formations:BEREA & BEDFORD SHALE, Issued Date:6/5/2018, Expired Date:6/4/2020 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:EOR, Proposed Well Class:ERP |
Record Last Modified | 2018-06-12 | PASSED SURFACE CASING MIT ON 12/23/2014. |
Construction Permit Expires | 2020-06-04 | PASSED SURFACE CASING MIT ON 12/23/2014. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2016-08-04 | 1774 | 1778 | 12 |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | RAINBOW OIL & GAS | 0 | 0 | 0 |
2017 | RAINBOW OIL & GAS | 0 | 0 | 180 |
2018 | RAINBOW OIL & GAS | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2015 | RAINBOW OIL & GAS | Brine | 0 | 0 |
2017 | RAINBOW OIL & GAS | Brine | 0 | 180 |
2018 | RAINBOW OIL & GAS | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0047109772 | 2014-12-08 | Field Inspected, Well Not Found | No Violations | Presite review with producer. |
0287434091 | 2015-05-14 | Drill / Deepen / Reopen | No Violations | Checking pit closure for two month restoration requirements. Pits closed but area has not been graded or reseeded yet. |
0348358276 | 2014-12-30 | Drill / Deepen / Reopen | No Violations | Currently drilling around 1430 feet. The Big Injun Sandstone was encountered around 1400 feet and the mud pump is now running. |
0445507559 | 2017-09-08 | Preliminary Restoration | No Violations | Site has been reclaimed and vegetation is starting to grow. |
0487864412 | 2017-06-22 | Production Wells | No Violations | Well is in production, pit has been closed and there is equipment on location to put topsoil back and restore the location. Well is currently equipped with annular disposal. |
0592391484 | 2017-10-27 | Enhanced Recovery Project | No Violations | Inspected site for possible conversion to a Enhanced Recovery Project . |
0796918708 | 2018-10-31 | Enhanced Recovery Project | No Violations | Convert to ERP. Appalachian wire line on site to perf the production casing from 1776 feet to 1884 feet with 52 shots. |
0858345432 | 2018-10-18 | Surface Facility Construction | No Violations | The concrete one piece vault for the unloading pad drain has been installed. Took picture for file. |
1021050547 | 2017-10-05 | Production Wells | No Violations | Inspected site along with county inspector to see if well wood be a good candidate for a enhanced recovery project, well is currently equipped with surface casing and 4.5 production casing . |
1127980380 | 2017-07-11 | Production Wells | No Violations | The well has been completed, however, the well site has not been restored. |
1137631725 | 2019-04-09 | Surface Facility Construction | No Violations | Rainbow Oil and Gas rig on the well. Tubing is not on location. The access road gate was closed and locked. The containment dike has three sides built. The dike liner is on site. |
1151223041 | 2017-04-12 | Production Wells | No Violations | Well still has not been completed. Jeff Burke the owner operator of Rainbow Oil and Gas said that he wants to get it completed before August he just needs to get the funds from the bank. |
1261674953 | 2016-01-22 | Preliminary Restoration | No Violations | Review of well with Matt Fulk. |
1302387746 | 2016-01-06 | Preliminary Restoration | No Violations | Follow up to -1747772169. company was on site remediating the site and the road to manage the erosion issues, the casing will be removed today and seed/ mulch should be applied soon after the well is fraced. |
1364362004 | 2017-07-20 | Production Wells | No Violations | Well has been completed, pit has been closed and tanks set. The topsoil has been grated back over location and just waiting for seed and mulch. |
1419352990 | 2014-12-23 | Drill / Deepen / Reopen | No Violations | Witnessed intermediate casing pressure test and Annular Disposal casing test. 450 psi was placed on the 7 intermediate casing, which was encased with cement from 763 feet to surface, and after 1/2 hour the pressure had dropped by 10 psi. casing pressure and annular disposal test requirements met. |
1420036823 | 2014-12-31 | Drill / Deepen / Reopen | No Violations | Witnessed 1935 feet of new 10.5 lb/ft 4 1/2 casing set in 1960 feet of 6 1/4 borehole with 36 sacks of Class A cement. Centralizers placed on the first, third, seventh, 17th, and 19th joints. |
1747772169 | 2015-12-17 | Preliminary Restoration | Violations Noted | Vegetative cover not established, road way has small areas of erosion, there are two sticks of production casing and a joint of surface casing on site. Vegetative cover shall be established in areas not essential to production in order prevent significant erosion, all equipment used in drilling shall be removed from the site. |
1791764301 | 2019-01-08 | Surface Facility Construction | No Violations | Permit to convert to enhanced recovery well. Rainbow O&G rig is set up on the well. A dozer and trac hoe are on location. The containment dike is 3/4 constructed. The containment dike liner is on site in a roll. |
1979439009 | 2018-10-19 | Surface Facility Construction | No Violations | Rainbow Oil and Gas rig is currently pulling the production tubing out of the well. Reviewed surface facility construction plans with Jeff Burke on location. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
1747772169 | US-OH-117361 | 2015-12-28 | Failure to restore within six months |
For data sources see[8]