X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-24417

Well Details

Well ID: 34-083-24417
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Pleasant Township
Operator Name: MARAM ENERGY INC
Well Pad ID:
Farm/Lease Name: KNOX WOODS
License Status: Producing
License Date: 2008-11-10
Spud Date: 2009-02-10
Spud Drilling Contractor: CAMPHIRE DRILLING
Final Drill Date: 2009-04-10
Well Total Depth: 2650 ft
Configuration: Vertical
Latitude: 40.352035989
Longitude: -82.40307857

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2008-11-10 Proposed Formations:CLINTON, Issued Date:11/10/2008, Expired Date:11/10/2009 6:00:00 AM, Drilling unit acres:35, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2009-04-10
Construction Permit Expires 2009-11-10
Completion Report Received 2010-07-06
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-09-02 2576 2608 62

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 15 1000 Bbl 4000 23 BPM

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2009 MARAM ENERGY INC 89 0 90
2010 MARAM ENERGY INC 2063 0 365
2011 MARAM ENERGY INC 1979 0 365
2012 MARAM ENERGY INC 1083 0 366
2013 MARAM ENERGY INC 1050 0 365
2014 MARAM ENERGY INC 908 0 365
2015 MARAM ENERGY INC 530 0 365
2016 MARAM ENERGY INC 435 0 365
2017 MARAM ENERGY INC 354 0 365
2018 MARAM ENERGY INC 243 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2009 MARAM ENERGY INC Brine 0 90
2010 MARAM ENERGY INC Brine 80 365
2011 MARAM ENERGY INC Brine 0 365
2012 MARAM ENERGY INC Brine 0 366
2013 MARAM ENERGY INC Brine 45 365
2014 MARAM ENERGY INC Brine 0 365
2015 MARAM ENERGY INC Brine 0 365
2016 MARAM ENERGY INC Brine 0 365
2017 MARAM ENERGY INC Brine 0 365
2018 MARAM ENERGY INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0211488753 2009-02-17 Drill / Deepen / Reopen No Violations I witnessed this power mud job on the surface string today.
1323711042 2011-12-12 Preliminary Restoration No Violations Well location inspected for compliance for perlimintary restoration,well is in production,with active pumping unit. Tank battery consistis of one 30 barrel tank,drip and filter system for gas delivery.Good ID posted at tank , pits are filled, ground cover is present to prevent substanial erosion. Perliminary restoration passed.
1335886151 2010-04-30 Preliminary Restoration No Violations The inspection revealed that there is an open pit on location. There is still a significant amount of grading that need to be done to close up the location. Preliminary Restoration not passed.
1963665353 2009-02-13 Drill / Deepen / Reopen No Violations I inspected the well location with Jeff Fry. George Campfires cable tool rig is on location and he has begun drilling this well. There were no violations noted this date.
2102364571 2011-12-12 Preliminary Restoration No Violations New well, pumping unit in production,lease road in good condition,diesel fuel tank on site near pump jack,pits filled,rough grading done,

For data sources see[9]

References