X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-083-24486

Well Details

Well ID: 34-083-24486
Loading map...
Country: United States
State: Ohio
County: Knox
Municipality: Pleasant Township
Operator Name: BI JOE DEVELOPMENT INC
Well Pad ID:
Farm/Lease Name: SMITH
License Status: Producing
License Date: 2010-05-27
Spud Date: 2010-06-08
Spud Drilling Contractor: G & H DRLG
Final Drill Date: 2010-06-15
Well Total Depth: 4715 ft
Configuration: Vertical
Latitude: 40.347545697
Longitude: -82.41756045

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2010-05-27 Proposed Formations:BEREA THRU TREMPEALEAU, Issued Date:5/27/2010, Expired Date:5/27/2011 6:00:00 AM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EDPW
Reached Total Depth 2010-06-15
Completion Report Received 2010-10-12
Construction Permit Expires 2011-05-27
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2010-12-10 2558 2576 38
2010-12-10 4554 4610 28

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
ACID 15 3000 Gal 0 STAGE 1 OF 2
H2O 0 31951 Gal 23300 STAGE 2 OF 2…PLUG SET @ 2630'

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
0 0 0
2010 BI JOE DEVELOPMENT INC 1861 0 122
2011 BI JOE DEVELOPMENT INC 5882 0 365
2012 BI JOE DEVELOPMENT INC 3312 0 366
2013 BI JOE DEVELOPMENT INC 2872 0 365
2014 BI JOE DEVELOPMENT INC 2753 16 365
2015 BI JOE DEVELOPMENT INC 1866 0 365
2016 BI JOE DEVELOPMENT INC 1244 0 365
2017 BI JOE DEVELOPMENT INC 986 0 365
2018 BI JOE DEVELOPMENT INC 927 0 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2010 BI JOE DEVELOPMENT INC Brine 225 122
2011 BI JOE DEVELOPMENT INC Brine 50 365
2012 BI JOE DEVELOPMENT INC Brine 0 366
2013 BI JOE DEVELOPMENT INC Brine 0 365
2014 BI JOE DEVELOPMENT INC Brine 30 365
2015 BI JOE DEVELOPMENT INC Brine 0 365
2016 BI JOE DEVELOPMENT INC Brine 0 365
2017 BI JOE DEVELOPMENT INC Brine 0 365
2018 BI JOE DEVELOPMENT INC Brine 0 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0096694742 2010-06-10 Drill / Deepen / Reopen No Violations I witnessed drilling procedures today. There were no violations noted this date.
0350593633 2010-06-09 Drill / Deepen / Reopen No Violations I witnessed this surface cement job today.
0530702701 2010-06-11 Drill / Deepen / Reopen No Violations I witnessed drilling procedures today. There were no violations noted this date.
1085831994 2010-06-16 Drill / Deepen / Reopen No Violations I witnessed this longstring cement job today.
1278678059 2010-06-15 Drill / Deepen / Reopen No Violations I witnessed drilling operations today. G&H Drilling are drilling in to TD on fluid. There were no violations noted this date.
1313071469 2011-08-08 Preliminary Restoration No Violations There is an active pumping unit on the well. There is one 100 barrel tank and separator contained within an earthen dike. The lease road and well location have been properly graded and the farmer is growing beans successfully at site. There is proper identification displayed. No violations noted this date. Preliminary Restoration passed.
1958765137 2010-06-14 Drill / Deepen / Reopen No Violations I witnessed drilling procedures today. A straight hole test was conducted and the rig will be switching over from drilling on air to drilling on fluid at 4,280 feet. There were no violations noted this date.

For data sources see[9]

References