X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-00819

Well Details

Well ID: 37-129-00819
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Allegheny Township
Operator Name: VERNARD L SHUMAKER
Well Pad ID:
Farm/Lease Name: GALLAGHER 1
License Status: Plugged OG Well
Spud Date: 1800-01-01
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.583944
Longitude: -79.613208

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2001 VERNARD L SHUMAKER 471.00 365 0.00 0 0.00 0
2002 VERNARD L SHUMAKER 1,234.00 365 0.00 0 0.00 0
2003 VERNARD L SHUMAKER 1,692.00 365 0.00 0 0.00 0
2004 VERNARD L SHUMAKER 1,556.00 365 0.00 0 0.00 0
2005 VERNARD L SHUMAKER 1,239.00 365 0.00 0 0.00 0
2007 VERNARD L SHUMAKER 647.00 365 0.00 0 0.00 0
2009 VERNARD L SHUMAKER 100.00 365 0.00 0 0.00 0
2010 VERNARD L SHUMAKER 23.00 365 0.00 0 0.00 0
2012 VERNARD L SHUMAKER 15.00 365 0.00 0 0.00 0
2013 0.00 0 0.00 0 0.00 0
2014 0.00 0 0.00 0 0.00 0
2015 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2002-A00 Brine 0.01 Bbl Brine or Industrial Waste Treatment Plt PA0091472
2003-A00 Brine 0.02 Bbl Brine or Industrial Waste Treatment Plt
2004-A00 Brine 0.01 Bbl Brine or Industrial Waste Treatment Plt
2005-A00 Brine 0.01 Bbl Brine or Industrial Waste Treatment Plt

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2334078 Primary Facility 2015-01-06 Plugging(Includes Plugged/Mined Through) No Violations Noted Finished pulling 3” out of hole at time of inspection. Bottom plug previously cemented from +/-2212’ to +/- 2104’. Pit lined and freeboard maintained. Plan is to perforate 7” at +/- 500’ and cement solid to surface.

For data sources see[6]

References