X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28596

Well Details

Well ID: 37-129-28596
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Derry Township
Operator Name: XPR RESOURCES LLC
Well Pad ID: 145495
Farm/Lease Name: MCBROOM 1-2H
License Status: Active
Spud Date: 2011-05-23
Permit Date: 2011-05-16
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.363856
Longitude: -79.299767

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2011-10-06 2011-10-06 8036.00 6,660,010.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 LP-65 Halliburton Energy Services Scale Inhibitor Ammonium chloride 12125-02-9 10.00 0.00220000
Water Municipal Authority of Derry Borough Carrier/Base Fluid Water 100.00 88.93
GBW-30 Breaker Halliburton Energy Services Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00030000
Carbohydrates 95.00 0.00190000
Hydrochloric Acid Halliburton Energy Services Acid Hydrochloric acid 7647-01-0 30.00 0.10
LGC-36 Halliburton Energy Services Gel Paraffinic Solvent 100.00 0.00250000
Polysaccharide
Sand- Silica Sand Halliburton Energy Services Proppant Quartz 14808-60-7 100.00 10.92
BE-9M Halliburton Energy Services Biocide
Tri-n-butyl tetradecyl phosphonium chloride 81741-28-8 10.00 0.00110000
Methanol 67-56-1 30.00 0.00320000
SP Breaker Halliburton Energy Services Breaker Sodium persulfate 7775-27-1 100.00 0.00200000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.02

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 XPR RESOURCES LLC 29,611.00 11 0.00 0 0.00 0
2012 XPR RESOURCES LLC 1,240,224.36 366 0.00 0 0.00 0
2013 XPR RESOURCES LLC 593,144.74 311 0.00 0 0.00 0
2014 XPR RESOURCES LLC 494,099.97 355 0.00 0 0.00 0
2015 XPR RESOURCES LLC 352,838.99 362 0.00 0 0.00 0
2016 XPR RESOURCES LLC 274,000.55 366 0.00 0 0.00 0
2017 XPR RESOURCES LLC 223,396.06 365 0.00 0 0.00 0
2018 XPR RESOURCES LLC 184,784.00 334 0.00 0 0.00 0
2019 XPR RESOURCES LLC 39,616.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2011-S02 Drill Cuttings (in Tons) 1,521.73 Tons LANDFILL 100277
2011-S02 Fracing Fluid Waste (in Barrels) 1,152.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-S01 Drill Cuttings (in Tons) 814.49 Tons LANDFILL 100277
2012-S01 Drilling Fluid Waste (in Barrels) 110.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-S01 Fracing Fluid Waste (in Barrels) 28,860.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-S01 Produced Fluid (in Barrels) 780.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2012-S02 Produced Fluid (in Barrels) 4,817.65 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013-S01 Produced Fluid (in Barrels) 1,420.67 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2013-S02 Drilling Fluid Waste (in Barrels) 120.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013-S02 Fracing Fluid Waste (in Barrels) 1,100.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2013-S02 Produced Fluid (in Barrels) 446.67 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014-S01 Drilling Fluid Waste (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014-S01 Produced Fluid (in Barrels) 3,812.30 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2014-S02 Produced Fluid (in Barrels) 1,058.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2015-S02 Produced Fluid (in Barrels) 704.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-S01 Fracturing Fluid Waste (in Barrels) RWC 805 94,065.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-S01 Produced Fluid (in Barrels) RWC 802 528.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW005
2016-S02 Other Oil & Gas Wastes (in Barrels) RWC 899 813.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S02 Produced Fluid (in Barrels) RWC 802 422.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2016-S02 Synthetic Liner Materials (in Tons) RWC 806 17.75 Tons LANDFILL 100434
2017-M01 Produced Fluid (in Barrels) RWC 802 55.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-M02 Produced Fluid (in Barrels) RWC 802 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-M03 Produced Fluid (in Barrels) RWC 802 440.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-M04 Produced Fluid (in Barrels) RWC 802 220.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE PA0254185
2017-M05 Produced Fluid (in Barrels) RWC 802 88.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M06 Produced Fluid (in Barrels) RWC 802 115.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M07 Produced Fluid (in Barrels) RWC 802 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M08 Produced Fluid (in Barrels) RWC 802 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M09 Produced Fluid (in Barrels) RWC 802 50.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M10 Produced Fluid (in Barrels) RWC 802 80.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2017-M11 Waste comment only Comment
2017-M12 Produced Fluid (in Barrels) RWC 802 120.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M03 Produced Fluid (in Barrels) RWC 802 88.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M04 Produced Fluid (in Barrels) RWC 802 138.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M06 Produced Fluid (in Barrels) RWC 802 48.00 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M07 Produced Fluid (in Barrels) RWC 802 92.00 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 66.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M08 Produced Fluid (in Barrels) RWC 802 22.00 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 114.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M10 Produced Fluid (in Barrels) RWC 802 44.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M11 Produced Fluid (in Barrels) RWC 802 18.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M11 Produced Fluid (in Barrels) RWC 802 70.00 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 24.00 Bbl REUSE (AT WELL PAD)
2019-M01 Produced Fluid (in Barrels) RWC 802 72.00 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 22.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
1977273 Primary Facility 2011-05-31 Routine/Complete Inspection No Violations Noted Inspection was conducted during construction of the pad.
1985346 Primary Facility 2011-07-01 Routine/Complete Inspection No Violations Noted Inspection was part of routine site visit. Met with company man and tool pusher. Tool pusher accompanied inspection.
1986048 Primary Facility 2011-06-06 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
1996476 Primary Facility 2011-08-02 Routine/Complete Inspection Pending Inspection was in response to company man¿s report of foam in under drain leading to sediment trap.
1998264 Primary Facility 2011-08-04 Drilling/Alteration No Violations Noted HORIZONTAL MARCELLUS
2000753 Primary Facility 2011-07-28 Routine/Complete Inspection No Violations Noted Inspection was in response to company man¿s (Anton Francois) report of oil based mud spill.
2008858 Primary Facility 2011-08-30 Routine/Complete Inspection Pending Site visit was part of routine inspection.
2008861 Primary Facility 2011-09-19 Routine/Complete Inspection No Violations Noted Inspection was follow-up from 8-30-11 site visit.
2182388 Primary Facility 2013-06-06 Drilling/Alteration No Violations Noted 6/6/2013 produced fluid tanks, GPU, and in production.
2188014 Primary Facility 2013-07-25 Routine/Complete Inspection No Violations Noted 7/25/2013 produced fluid tanks, GPU, and in production.
2195646 Primary Facility 2013-08-12 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Department notes that the Operator will be actively drilling wells on the same pad and the drill rig was on site and placed on containment. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2200893 Primary Facility 2013-09-03 Routine/Complete Inspection No Violations Noted See inspection # 2200890 for observations made on 9/3/2013. At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Department notes that the Operator will be actively drilling wells on the same pad and the drill rig was on site and placed on containment. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2211068 Primary Facility 2013-09-23 Routine/Complete Inspection No Violations Noted 9/23/2013 produced fluid tanks, GPU, and in production.
2217750 Primary Facility 2013-10-03 Routine/Complete Inspection No Violations Noted 10/3/2013 drilling on 10H well at depth of 11,455'. inspected w/OGI P. Wyrwas.
2219565 Primary Facility 2013-10-16 Routine/Complete Inspection No Violations Noted 10/16/2013 drillig on the 12H @ depth of 3700’.
2222834 Primary Facility 2013-11-05 Routine/Complete Inspection No Violations Noted 11/5/2013 moving rig off pad.
2237665 Primary Facility 2014-01-16 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2259072 Primary Facility 2014-03-26 Routine/Complete Inspection No Violations Noted 3/26/2014 Produced fluids ttanks diked and GPU's
2274302 Primary Facility 2014-05-20 Drilling/Alteration No Violations Noted 5/20/2014 Produced fluids tanks diked and GPU’s
2302599 Primary Facility 2014-08-27 Routine/Complete Inspection No Violations Noted At the time of inspection the well appeared to drilled and equipped for production. The well apparatus, brine tank, and gas production unit appear to be in sound condition. The Erosion and Sedimentation Plan was onsite and appeared to implemented and maintained. No observation of accelerated erosion in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained.
2347409 Primary Facility 2014-02-18 Routine/Complete Inspection No Violations Noted 2/18/2015 Produced fluids tanks diked and GPU’s. Inspected w/OGI P. Wyrwas.
2358850 Primary Facility 2015-04-07 Site Restoration No Violations Noted Inspection in response to a "Well Site Restoration Report" file by the Operator on 11-3-2014. At the time of inspection all earth disturbance activities, authorized by the well permit were complete, and the site has been stabilized. Site appears to meet PCSM and BMPs have been removed.
2440122 Primary Facility 2016-01-12 Routine/Complete Inspection No Violations Noted Access road gated, locked and shared with ag field. At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Freshwater impoundment located on site and appears structurally sound. Site permanently stabilized with no signs of E& S issues in relation to site and/or access road.
2474477 Primary Facility 2016-04-13 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production equipment-tank battery and dike look ok.
2502330 Primary Facility 2016-07-18 Routine/Partial Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appear to in sound condition. Well labeled and no observation of accelerated erosion or sedimentation in relation to the well site or access road.
2553547 Primary Facility 2017-01-17 Routine/Complete Inspection No Violations Noted At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Four brine tanks located on site within secondary containment and appear to be structurally sound. Site permanently stabilized with no signs of E& S issues in relation to site and/or access road.
2554691 Primary Facility 2017-01-24 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery-dike containment looked ok.
2621666 Primary Facility 2017-08-02 Routine/Complete Inspection No Violations Noted Well tagged-on. Well head casing-production set equipment-tank battery-dike containment look ok.
2690485 Primary Facility 2018-02-01 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Four brine tanks within secondary containment and appear to be structurally sound. No E&S issues.

Site id sign updated to reflect current Operator information. PPC plan and ERP appears to reflect outdated Operator information. Department request Operator update documents accordingly in accordance with regulation. Violation issued (see inspection id 2690484).

2755329 Primary Facility 2018-07-24 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Four brine tanks within secondary containment and appears structurally sound. No E&S issues.

For data sources see[7]

References