X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28725

Well Details

Well ID: 37-129-28725
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Salem Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID: 148378
Farm/Lease Name: FRYE UNIT 13H
License Status: Active
Spud Date: 2012-01-19
Permit Date: 2012-01-11
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.365386
Longitude: -79.480575

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-14 2012-11-14 6808.00 5,539,606.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00710000
Biocide EC 6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5.00 0.00117000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00702000
Polyethylene glycol 25322-68-3 60.00 0.01
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00688000
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.27
Proppant (lbs) Proppant 9.54 10.64
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00234000
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00
Clean Volume (gals) Carrier/Base Fluid 90.46 100.00
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Carbohydrates 95.00 0.00058000
Hemicellulase enzyme 9012-54-8 15.00 0.00009000
FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 602,865.00 334 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 578,059.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 398,132.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 293,275.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 238,509.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 104,567.00 212 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S01 Drilling Fluid Waste (in Barrels) 3,173.30 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012-S02 Drill Cuttings (in Tons) 3.41 Tons LANDFILL 100434
2013-S01 Fracing Fluid Waste (in Barrels) 25,749.80 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 170.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2013-S01 Produced Fluid (in Barrels) 2,216.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Fracing Fluid Waste (in Barrels) 7,494.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013-S02 Fracing Fluid Waste (in Barrels) 10,382.40 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Fracturing Fluid Waste (in Tons) 72.42 Tons LANDFILL 073 114 654
2013-S02 Produced Fluid (in Barrels) 556.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013-S02 Produced Fluid (in Barrels) 2,328.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Fracturing Fluid Waste (in Tons) 6.47 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014-S01 Produced Fluid (in Barrels) 1,111.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 466.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 468.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 366.66 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 281.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 260.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 71.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M02 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 33.33 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 1,540.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M06 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M08 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M10 Produced Fluid (in Barrels) RWC 802 63.33 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M02 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 35.67 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2019-M03 Waste comment only Comment

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2036198 Primary Facility 2012-01-23 Routine/Complete Inspection No Violations Noted Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary.
2039240 Primary Facility 2012-01-31 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan.
2045690 Primary Facility 2012-02-22 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2048769 Primary Facility 2012-03-06 Drilling/Alteration No Violations Noted Highlands Rig#2 Speedstar cleaning hole (damp) at 1424' at time of inspection. Pit lined and freeboard maintained.
2056001 Primary Facility 2012-03-30 Routine/Complete Inspection No Violations Noted Well topholed and ready for Patterson rig; On pad with Fry 14h and 15H; Location good; E&S good
2066497 Primary Facility 2012-05-10 Drilling/Alteration No Violations Noted Patterson-UTI Rig#255 nippling up BOP at time of inspection. Closed loop system being utilized. Pit lined and freeboard maintained.
2069689 Primary Facility 2012-05-21 Routine/Complete Inspection No Violations Noted TD of hole: 11360; Ran 11320' 5 !/2"csg; Cement w/67bbls; 285 sks Varicem cement; 14.2ppg;Yield=1.32ft3/sk; 5.84 galsk; followed by Gasstop 208 bbls; 885sks; 14.2;1.32yield; 5.85ft3/sk; Tail in with Fraccem; 110bbls; 280 sks; 15.2ppg; 2.2Yield; 9.13ft3/sk;'; cement returns; Patterson rig 255 moving off location;
2116918 Primary Facility 2012-11-20 Routine/Complete Inspection No Violations Noted Site stable no violations
2118993 Primary Facility 2012-11-28 Incident- Response to Accident or Event Violation(s) Noted Violations noted
2129637 Primary Facility 2013-01-10 Compliance Evaluation No Violations Noted Compliance inspection the result of violations written on 11/29/2012. At the time of inspection the soil and rock affected by the brine spill on 11/28 appears to have been removed. At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2180092 Primary Facility 2013-07-02 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2195289 Primary Facility 2013-08-14 Administrative/File Review Viol(s) Noted & Immediately Corrected Administrative review the result of a restoration extension request submitted to the Department on June 5 2013. During the restoration review process the Department notes that the Operator was approximately 4 months past the restoration date, when the restoration extension was filed with the Department. According to the well record submitted to the Department by the Operator the well was drilled to total depth on 5/18/2012 making the restoration date 2/18/2013, the subsequent violation is for the failure to restore the site within 9 months or file for a site restoration extension within the same time frame.
2251079 Primary Facility 2014-03-06 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
2278646 Primary Facility 2014-06-16 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, with good growth. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
2366785 Primary Facility 2015-04-28 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2367099 Primary Facility 2015-05-05 Site Restoration No Violations Noted Site inspection in response to a "Well Site Restoration Report" filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete, stabilized and have sufficient growth. PCSM BMPs are installed and appear to be functioning properly.
2468850 Primary Facility 2016-03-28 Routine/Complete Inspection No Violations Noted 3 wells drilled and appear to be equipped for production. 3 tanks onsite. ID sign and e&s ok.
2468851 Primary Facility 2016-03-28 Routine/Complete Inspection No Violations Noted 3 wells drilled and appear to be equipped for production. 3 tanks onsite. ID sign and e&s ok.
2518641 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery/containment looked ok.
2589323 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2706117 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Three brine tanks within secondary containment and appears structurally sound. No E&S issues.
2841196 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted This well is tagged and temporarily shut in. The well head casing looks good and has a lock out tag out lock with a cable installed on the master production casing valve. The piping, production set equipment, contain,ent dike and tank battery look good.

NOTE: The well tag API well permit number is not legible enough to read and I am requesting that the operator install a more legible tag on this well. See attached photo.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2118993 654625 11/28/2012 2012-11-28 78.56(3) - Impoundment not structurally sound, impermeable, 3rd party protected. Administrative
2195289 675160 08/14/2013 2013-08-14 206C - Failure to restore well site within nine months after completion of drilling, failure to remove all pits, drilling supplies and equipment not needed for production. Administrative 3216c

Penalties Applied

Violation ID Penalty ID Penalty Code Penalty Status Penalty Date Enforcement Date Penalty Amount Amount Collected
654625 295110 NOV - Notice of Violation Comply/Closed 2013-01-10
654625 305560 CACP - Consent Assessment of Civil Penalty Comply/Closed 2013-12-10 2013-12-10 $4,500.00 $4,500.00
675160 300894 NOV - Notice of Violation Comply/Closed 2013-10-11
675160 309500 CACP - Consent Assessment of Civil Penalty Comply/Closed 2014-04-07 2014-04-07 $2,000.00 $2,000.00

For data sources see[7]

References