X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-129-28727

Well Details

Well ID: 37-129-28727
Loading map...
Country: United States
State: Pennsylvania
County: Westmoreland
Municipality: Salem Township
Operator Name: PENN VIEW EXPLORATION CORP
Well Pad ID: 148378
Farm/Lease Name: FRYE UNIT 15H
License Status: Active
Spud Date: 2012-01-20
Permit Date: 2012-01-11
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.365467
Longitude: -79.480550

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2012-11-14 2012-11-14 7224.00 2,646,925.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 FR-66 Friction Reducer Halliburton Energy Services Friction Reducer Distillates, petroleum, hydrotreated light 64742-47-8 30.00 0.03
EC6673W Nalco Iron Control Ethylene glycol 107-21-1 30.00 0.00666000
Biocide EC 6116A Nalco Biocide Dibromoacetonitrile 3252-43-5 5.00 0.00108000
2,2-Dibromo-3-nitrilopropionamide 10222-01-2 30.00 0.00649000
Polyethylene glycol 25322-68-3 60.00 0.01
7.5 Hcl Acid Used to open perfs Hydrochloric acid 7647-01-0 7.50 0.28
EC6486A Nalco Scale Inhibitor Ethylene glycol 107-21-1 30.00 0.00705000
GBW-30 BREAKER Halliburton Energy Services Gel Breaker Hemicellulase enzyme 9012-54-8 15.00 0.00008000
Carbohydrates 95.00 0.00048000
WG-36 GELLING AGENT Halliburton Energy Services Water Viscosifier Guar gum 9000-30-0 100.00 0.00220000
Clean Volume (gals) Carrier/Base Fluid 91.42 100.00
Proppant (lbs) Proppant 8.58 9.46
ASP 900 Nalco Friction Reducer Ammonium sulfate 7783-20-2 30.00

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0
2013 CHEVRON APPALACHIA LLC 434,870.00 334 0.00 0 0.00 0
2014 CHEVRON APPALACHIA LLC 350,513.00 365 0.00 0 0.00 0
2015 CHEVRON APPALACHIA LLC 235,920.00 365 0.00 0 0.00 0
2016 CHEVRON APPALACHIA LLC 171,683.00 366 0.00 0 0.00 0
2017 CHEVRON APPALACHIA LLC 145,382.00 365 0.00 0 0.00 0
2018 CHEVRON APPALACHIA LLC 52,746.00 153 0.00 0 0.00 0
2019 CHEVRON APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S01 Drilling Fluid Waste (in Barrels) 1,679.40 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW001
2012-S01 Drilling Fluid Waste (in Barrels) 5,400.00 Bbl REUSE OTHER THAN ROAD SPREADING
2012-S02 Drill Cuttings (in Tons) 3.42 Tons LANDFILL 100434
2013-S01 Fracing Fluid Waste (in Barrels) 19,607.30 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Produced Fluid (in Barrels) 1,694.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Fracing Fluid Waste (in Barrels) 6,696.20 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013-S02 Fracing Fluid Waste (in Barrels) 10,382.80 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Fracturing Fluid Waste (in Tons) 72.43 Tons LANDFILL 073 114 654
2013-S02 Produced Fluid (in Barrels) 57.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123SW001
2013-S02 Produced Fluid (in Barrels) 991.00 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Fracturing Fluid Waste (in Tons) 6.47 Tons STORAGE PENDING DISPOSAL OR REUSE MID074259565
2014-S01 Produced Fluid (in Barrels) 1,111.33 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 466.67 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 468.33 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 366.66 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 281.67 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 260.35 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123SW019
2016-S02 Produced Fluid (in Barrels) RWC 802 71.67 Bbl REUSE OTHER THAN ROAD SPREADING
2017-M01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M02 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M03 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 33.33 Bbl REUSE (AT WELL PAD)
2017-M05 Produced Fluid (in Barrels) RWC 802 1,540.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW001
2017-M06 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2017-M08 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 36.67 Bbl REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA
2017-M10 Produced Fluid (in Barrels) RWC 802 63.33 Bbl REUSE (AT WELL PAD)
2018-M01 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW005
2018-M02 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2018-M03 Produced Fluid (in Barrels) RWC 802 35.67 Bbl REUSE (AT WELL PAD)
2018-M04 Produced Fluid (in Barrels) RWC 802 38.33 Bbl REUSE (AT WELL PAD)
2019-M03 Waste comment only Comment

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2036200 Primary Facility 2012-01-23 Routine/Complete Inspection No Violations Noted Well had been spudded, drilling was not ongoing at the time of the inspection. Well pad construction ahd been completed, well stimulation impoundment construction was still underway. All access road and site erosion controls had been implemented as outlined in the ESCGP. There was no evidence of accelerated erosion or sedimentation in relation to the access road or well-site. The operator should monitor the site and access road eorsion controls and maintain them as neccesary.
2039251 Primary Facility 2012-01-31 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained. Inspection conducted w/OGI J. Branan.
2045691 Primary Facility 2012-02-22 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2048797 Primary Facility 2012-03-06 Drilling/Alteration No Violations Noted Waiting on rig to commence tophole drilling. Pit lined and freeboard maintained.
2055996 Primary Facility 2012-03-30 Routine/Complete Inspection No Violations Noted Highlands Rig #2 finished drilling on 3/30/12. TD@4195'; 16"csg@248'; 11 3/4"@507' and 8 5/8"@2330'; moving off location; Patterson rig to set up 4/2/12; On pad with Frye 13H and 14H. Location looks good; E&S good.
2066499 Primary Facility 2012-05-10 Drilling/Alteration No Violations Noted Waiting on frac. Pit lined and freeboard maintained.
2116925 Primary Facility 2012-11-20 Routine/Complete Inspection No Violations Noted Site stable. No violations.
2129645 Primary Facility 2013-01-10 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2180094 Primary Facility 2013-07-02 Routine/Complete Inspection No Violations Noted At the time of inspection the well appears to be drilled and is actively being equipped for production. The Erosion and Sedimentation Plan was on site. No accelerated erosion or sedimentation observed in relation to the access road or well pad area. The perimeter E&S BMPs appear to properly installed and functioning properly. Various pits located on site appear to be in sound condition and have the required 2' of freeboard. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained.
2251081 Primary Facility 2014-03-06 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, however no growth observed. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
2278651 Primary Facility 2014-06-16 Routine/Complete Inspection No Violations Noted At the time of inspection the well was drilled and equipped for production. The well apparatus and brine tanks appear to be in sound condition. The Department notes that the site has been regraded, and mulched, with good growth. The Department suggest the Operator continue to monitor the site weekly and after significant precipitation events.
2366781 Primary Facility 2015-04-28 Routine/Complete Inspection No Violations Noted Well operating and properly identified.
2367097 Primary Facility 2015-05-05 Site Restoration No Violations Noted Site inspection in response to a "Well Site Restoration Report" filed with the Department on 11/26/2014. At the time of inspection the well was drilled and equipped for production. Well apparatus and brine tank appeared to be in sound condition. All earth disturbance activities associated with the site appear to be complete, stabilized and have sufficient growth. PCSM BMPs are installed and appear to be functioning properly.
2468852 Primary Facility 2016-03-28 Routine/Complete Inspection No Violations Noted 3 wells drilled and appear to be equipped for production. 3 tanks onsite. ID sign and e&s ok.
2518632 Primary Facility 2016-09-12 Routine/Complete Inspection No Violations Noted Well tagged-in production. Well head casing-production set equipment-tank battery/containment looked ok.
2589327 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2589630 Primary Facility 2017-05-02 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Brine tank within secondary containment and appears to be structurally sound. No E&S issues.
2706115 Primary Facility 2018-03-15 Routine/Complete Inspection No Violations Noted At the time of inspection well equipped for production. Three brine tanks within secondary containment and appears structurally sound. No E&S issues.
2841188 Primary Facility 2019-02-19 Routine/Complete Inspection No Violations Noted This well is tagged and temporarily shut in. The well head casing looks good and has a lock out tag out lock with a cable installed on the master production casing valve. The piping, production set equipment, contain,ent dike and tank battery look good.

For data sources see[7]

References