If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-129-28797 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.474733,"lon":-79.5692,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Westmoreland | |
Municipality: Washington Township | |
Operator Name: CNX GAS CO LLC | |
Well Pad ID: 148819 | |
Farm/Lease Name: MAMONT SOUTH 1E | |
License Status: Active | |
Spud Date: 2013-06-10 | |
Permit Date: 2012-07-05 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.474733 | |
Longitude: -79.5692 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2014-03-15 | 2014-04-07 | 7806 | 9,305,360.0 | 0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Water | Customer & CWS | Base Fluid & Mix Water | Water | 7732-18-5 | 100 | 88.3739 | 77,648,800.0 |
Sand (Proppant), DAP-903, DWP-111, DWP-614, BioClear 2000, DWP-NE1, Spearhead Acid, Acetic Acid |
CWS | Propping Agent, Scale Inhibitor, Gel Slurry, Viscosifier, Biocide, Non-Emulsifier, Clean Perforations, Acid | Sodium chloride | 7647-14-5 | 0.1 | 0.00007000 | 60.08 | |
Alcohols, C14-15, ethoxylated | 68951-67-7 | 0.1 | 0.00205 | 1802.36 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0.1 | 0.00205 | 1802.36 | ||||
Calcite | 471-34-1 | 1 | 0.01837 | 16144.8 | ||||
Dimethylcocoamine, bis(chloroethyl) ether, diquaternary ammonium salt |
68607-28-3 | 40 | 0.00761 | 6683.34 | ||||
Propargyl Alcohol | 107-19-7 | 0.1 | 0.00068 | 600.79 | ||||
Oxirane, 2-methyl-, polymer with oxirane, monodecyl ether | 37251-67-5 | 1.5 | 0 | 2.24 | ||||
Guar gum | 9000-30-0 | 60 | 0.0001 | 89.66 | ||||
Crystalline silica (Quartz) | 14808-60-7 | 100 | 10.8933 | 9,571,310.0 | ||||
2,2-Dibromo-3-Nitrilopropionamide | 10222-01-2 | 20 | 0.01269 | 11148.2 | ||||
Isopropanol | 67-63-0 | 40 | 0.00761 | 6683.34 | ||||
Diallyldimethylammonium chloride | 7398-69-8 | 5 | 0.00095 | 835.42 | ||||
Goethite | 1310-14-1 | 0.1 | 0.00481 | 4227.36 | ||||
Methanol | 67-56-1 | 15 | 0.00696 | 6110.96 | ||||
Distillates (petroleum), hydrotreated middle | 64742-46-7 | 60 | 0.01651 | 14509.8 | ||||
Ilmenite | 98072-94-7 | 0.1 | 0.00219 | 1920.96 | ||||
2-Propenoic acid, polymer with 2-propenamide, sodium salt | 25987-30-8 | 40 | 0.02188 | 19226.9 | ||||
Hydrochloric acid | 7647-01-0 | 35 | 0.47864 | 420550 | ||||
Polyethylene glycol mixture | 25322-68-3 | 70 | 0.01269 | 11148.2 | ||||
Sorbitan monooleate | 1338-43-8 | 5 | 0.00274 | 2403.36 | ||||
Poly(oxyethylene)nonylphenol ether | 9016-45-9 | 5 | 0.00274 | 2403.36 | ||||
Quaternary ammonium compounds, bis(hydrogenated tallow alkyl)dimethyl, salts with bentonite |
68953-58-2 | 5 | 0.00001000 | 7.47 | ||||
Illite | 12173-60-3 | 1 | 0.0059 | 5186.59 | ||||
Apatite | 64476-38-6 | 0.1 | 0.00306 | 2689.76 | ||||
Biotite | 1302-27-8 | 0.1 | 0.00306 | 2689.76 | ||||
Modified thiourea polymer | 68527-49-1 | 0.1 | 0.00205 | 1802.36 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0.1 | 0.00205 | 1802.36 | ||||
Formaldehyde | 50-00-0 | 0.1 | 0.00014 | 120.16 | ||||
Acetic acid | 64-19-7 | 100 | 0.10874 | 95545.8 | ||||
2-Propenoic acid, polymer with sodium phosphonate | 71050-62-9 | 60 | 0.00645 | 5667.44 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2013 | CNX GAS CO LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2014 | CNX GAS CO LLC | 723,613.30 | 230 | 0.00 | 0 | 0.00 | 0 |
2015 | CNX GAS CO LLC | 550,162.66 | 361 | 0.00 | 0 | 0.00 | 0 |
2016 | CNX GAS CO LLC | 337,066.46 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CNX GAS CO LLC | 349,289.84 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CNX GAS CO LLC | 286,076.57 | 365 | 0.00 | 0 | 0.00 | 0 |
2019 | CNX GAS CO LLC | 60,821.19 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2013-S02 | Drill Cuttings (in Tons) | 1,028.14 Tons | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2013-S02 | Drilling Fluid Waste (in Barrels) | 253.62 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 301071 |
2013-S02 | Fracing Fluid Waste (in Barrels) | 45.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Fracing Fluid Waste (in Barrels) | 0.27 Bbl | LANDFILL | 100434 |
2014-S01 | Fracing Fluid Waste (in Barrels) | 28,949.90 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Produced Fluid (in Barrels) | 4,253.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2014-S01 | Servicing Fluid (in Barrels) | 0.14 Bbl | LANDFILL | 100434 |
2014-S02 | Produced Fluid (in Barrels) | 28,736.89 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M07 | Produced Fluid (in Barrels) | 539.37 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015-M07 | Produced Fluid (in Barrels) | 1,509.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M08 | Produced Fluid (in Barrels) | 1,431.67 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M09 | Produced Fluid (in Barrels) | 1,432.91 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M10 | Produced Fluid (in Barrels) | 1,261.47 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M11 | Produced Fluid (in Barrels) | 1,310.96 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-M12 | Produced Fluid (in Barrels) | 831.79 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Produced Fluid (in Barrels) | 2,585.90 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2015-S01 | Produced Fluid (in Barrels) | 60.84 Bbl | INJECTION DISPOSAL WELL | 34-119-28776 |
2015-S01 | Produced Fluid (in Barrels) | 171.99 Bbl | INJECTION DISPOSAL WELL | 34-155-21438 |
2015-S01 | Produced Fluid (in Barrels) | 157.95 Bbl | INJECTION DISPOSAL WELL | 34-155-23196 |
2015-S01 | Produced Fluid (in Barrels) | 1,800.32 Bbl | INJECTION DISPOSAL WELL | 34-157-25511 |
2015-S01 | Produced Fluid (in Barrels) | 10,391.68 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M01 | Produced Fluid (in Barrels) RWC 802 | 1,110.28 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M02 | Produced Fluid (in Barrels) RWC 802 | 952.41 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M03 | Produced Fluid (in Barrels) RWC 802 | 955.36 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M04 | Produced Fluid (in Barrels) RWC 802 | 820.04 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M05 | Produced Fluid (in Barrels) RWC 802 | 66.70 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016-M05 | Produced Fluid (in Barrels) RWC 802 | 935.45 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M06 | Produced Fluid (in Barrels) RWC 802 | 331.48 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016-M06 | Produced Fluid (in Barrels) RWC 802 | 150.93 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016-M06 | Produced Fluid (in Barrels) RWC 802 | 172.93 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M07 | Produced Fluid (in Barrels) RWC 802 | 408.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016-M07 | Produced Fluid (in Barrels) RWC 802 | 364.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M08 | Produced Fluid (in Barrels) RWC 802 | 774.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M09 | Produced Fluid (in Barrels) RWC 802 | 634.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M10 | Produced Fluid (in Barrels) RWC 802 | 445.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016-M10 | Produced Fluid (in Barrels) RWC 802 | 69.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016-M10 | Produced Fluid (in Barrels) RWC 802 | 265.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M11 | Produced Fluid (in Barrels) RWC 802 | 121.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016-M11 | Produced Fluid (in Barrels) RWC 802 | 679.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-M12 | Produced Fluid (in Barrels) RWC 802 | 349.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2016-M12 | Produced Fluid (in Barrels) RWC 802 | 347.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2016-M12 | Produced Fluid (in Barrels) RWC 802 | 118.00 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 108.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 418.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 168.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-10 |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 123.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-32 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 335.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 117.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 340.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 467.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-16 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 362.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 12.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 723.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-10 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 117.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-16 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 277.00 Bbl | REUSE AT A CONVENTIONAL WELL SITE IN PA | 129-20421 |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 588.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-10 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 458.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-10 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 340.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 142.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 114.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 82.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 117.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 618.00 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 203.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 125.19 Bbl | INJECTION DISPOSAL WELL | 34-013-20609 |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 606.24 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 475.86 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 149.39 Bbl | REUSE (AT WELL PAD) | |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 537.87 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 109.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 748.47 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 500.00 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018-M02 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 11.00 Bbl | REUSE (AT WELL PAD) | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 321.33 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 328.00 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 635.35 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 126.90 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 12.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M04 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 10.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 69.40 Bbl | INJECTION DISPOSAL WELL | 34-119-28803 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 94.64 Bbl | REUSE (AT WELL PAD) | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 92.57 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 361.34 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 48.91 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 239.21 Bbl | REUSE (AT WELL PAD) | |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 421.11 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 118.96 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M06 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 10.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 430.69 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 165.09 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 193.36 Bbl | REUSE (AT WELL PAD) | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 71.09 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 352.51 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 117.35 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M08 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 3.00 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 404.22 Bbl | REUSE (AT WELL PAD) | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 172.14 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 45.64 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M09 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 13.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 528.96 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 47.76 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M10 | Other Oil & Gas Wastes (in Barrels) RWC 899 | 5.20 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 24.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 95.03 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018-M10 | Produced Fluid (in Barrels) RWC 802 | 550.92 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 547.23 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 22.70 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 67.69 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 48.20 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 511.17 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 183.51 Bbl | REUSE (AT WELL PAD) | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 139.15 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 212.60 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 119.90 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 233.38 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 64.00 Bbl | REUSE (AT WELL PAD) | |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 117.39 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 72.09 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 72.35 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 263.77 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 91.44 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-17 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 253.14 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-19 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 44.00 Bbl | SURFACE IMPOUNDMENT | 95-7-37312-21 |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2132724 | Primary Facility | 2013-01-22 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of cutting and removing trees and underbrush. The inspection at the request of the Operator to inspect perimeter BMP controls prior earth disturbance. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2139212 | Primary Facility | 2013-02-13 | Routine/Complete Inspection | No Violations Noted | no violations noted |
2152939 | Primary Facility | 2013-04-02 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2163818 | Primary Facility | 2013-05-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was in the process of constructing the site. At the time of inspection the Erosion and Sedimentation plan was on site and implemented as designed. No observation of accelerated E&S issue in relation to proposed well pad area or the access road. The Department suggests that the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site in maintained. |
2174970 | Primary Facility | 2013-06-13 | Routine/Complete Inspection | In Compliance with Policy | Inspection the result of the Operator reporting a breached BMP during a precipitation event. The Operator is in compliance with the Departments notification policy for a BMP breach. During the inspection the Department notes that an infiltration ditch located closest to the access road failed during a heavy precipitation event in the early morning hours on 6/13/2013. The failure resulted in material from the infiltration ditch being washed into a 32" silt sox, which did not contain the material and also failed. The two failures resulted is accelerated erosion of the access road and scouring of a hillside below the excavated pad area. The precipitation event appears to exceed the Departments criteria for construction standards. The Operators response was to rebuild the failed portion of the infiltration ditch, add an additional rock outlet and repair the silt sox. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2175886 | Primary Facility | 2013-06-13 | Drilling/Alteration | No Violations Noted | Well not spud in at time of inspection. Inspection conducted w/OGI J. Branan. |
2177614 | Primary Facility | 2013-05-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. The Department notes that the Operator replaced the silt sox, installed an additional rock outlet, and repaired the failed earthen dike surrounding the well site. The Department has also notes that the additions have been added to the E&S plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2182019 | Primary Facility | 2013-07-05 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. No observation of accelerated erosion or sedimentation in relation to the access road or well site. The E&S plan was on site and all associated BMPs appear to be installed as outlined on the plan. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2182380 | Primary Facility | 2013-07-09 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence tophole drilling. |
2185975 | Primary Facility | 2013-07-24 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2189814 | Primary Facility | 2013-08-06 | Incident- Response to Accident or Event | Violation(s) Noted | Inspection the result of a spill reported to the Department on 8/6/2013 at 11:50am. The Department recognizes that the Operator in in compliance with the Departments spill policy. At the time of inspection the Operator indicated that approximately 1.5 barrels of drilling water spilled off of containment. The Operator indicated the drilling water contained liquid aluminum, defoamer, flocculants and surfactants. The MSDS sheets for these substances were on site and supplied to the Department upon request. During the inspection the Operator vacuumed the affected area and excavated the affected media for disposal. The affected area was approximately 20'x25'x8". The Department suggests the Operator submit confirmatory sample results of the drilling water, affected media and background to verify clean up. |
2189901 | Primary Facility | 2013-08-01 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the drill rig was located onsite and placed on containment. Operator indicated the well has not been started at the time of inspection. See inspection id #2185968 for description of observations made during site inspection. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2195036 | Primary Facility | 2013-08-07 | Drilling/Alteration | No Violations Noted | Falcon rig#28 Schramm 200 shut down and waiting on 4” pipe ram rubber at time of inspection. |
2209077 | Primary Facility | 2013-10-02 | Compliance Evaluation | No Violations Noted | CEI inspection in response to violations written to the Operator on 8/6/2013. The issues resulting in violations have been corrected. The Department has received Operators 15 and 30 day responses, which is in compliance with the Department spill policy. The Department has also received confirmatory samples. At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2216398 | Primary Facility | 2013-10-25 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well was drilled to KOP. The E&S plan was onsite and all BMPs appeared be installed and maintained as outlined in the plan. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2217799 | Primary Facility | 2013-10-23 | Drilling/Alteration | No Violations Noted | Waiting on rig to commence lateral drilling. |
2222912 | Primary Facility | 2013-11-14 | Drilling/Alteration | No Violations Noted | CalFrac cementing 5 1/2” at time of inspection. |
2226523 | Primary Facility | 2013-11-26 | Drilling/Alteration | No Violations Noted | Waiting on frac. |
2243103 | Primary Facility | 2014-02-06 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was actively preparing the site for stimulation. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2249735 | Primary Facility | 2014-02-18 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the Operator was actively stimulating the wells located onsite. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2249754 | Primary Facility | 2014-03-03 | Routine/Complete Inspection | No Violations Noted | See inspection # 2249702 for events and description from the 3/3/2014 inspection. |
2253174 | Primary Facility | 2014-03-13 | Routine/Complete Inspection | No Violations Noted | See inspection # 2253170 for events and description from the 3/13/2014 inspection. |
2360468 | Primary Facility | 2015-04-13 | Site Restoration | No Violations Noted | Inspection in response to a "Well Site Restoration Report" file by the Operator on 11-24-2014. At the time of inspection all earth disturbance activities, authorized by the well permit were complete, and the site has been stabilized. No observation of accelerated erosion or sedimentation in relation to the well pad or access road. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation events to ensure the stability of the site is maintained. |
2361184 | Primary Facility | 2015-04-08 | Routine/Complete Inspection | No Violations Noted | Well operating and properly identified. |
2393157 | Primary Facility | 2015-07-27 | Routine/Complete Inspection | No Violations Noted | At the time of inspection the well appears to be in production. The site appears to be restored. The Department suggests the Operator continue to monitor the site weekly and after significant precipitation event to ensure the stability of the site in maintained. |
2520189 | Primary Facility | 2016-09-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appears to be structurally sound. Site stable, no E& S issues in relation to site and/or access road. |
2551873 | Primary Facility | 2017-01-12 | Routine/Complete Inspection | No Violations Noted | Well tagged-on. Well head casing-production set-tank battery looked ok. |
2564509 | Primary Facility | 2017-02-14 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well appears equipped for production. Well tag present and affixed in a permanent manner. Brine tank located on site within secondary containment and appear to be structurally sound. Site permanently stabilized, no E& S issues in relation to site and/or access road. |
2615568 | Primary Facility | 2017-07-13 | Routine/Complete Inspection | No Violations Noted | Well tagged. Operator running wireline to retrieve plunger sleeve from well at time of inspection. Well head casing-production set equipment-tank battery-dike containment looked ok. |
2679800 | Primary Facility | 2018-01-09 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. No E&S issues. |
2700796 | Primary Facility | 2018-03-05 | Routine/Complete Inspection | No Violations Noted | This well is tagged and in production. The well head casing, piping, production set equipment, tank battery and containment dike look ok. |
2718040 | Primary Facility | 2018-04-13 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Five brine tanks within secondary containment and appears structurally sound. No E&S issues. |
2800482 | Primary Facility | 2018-11-08 | Routine/Complete Inspection | No Violations Noted | Well appears to be in good working condition. |
2804830 | Primary Facility | 2018-11-19 | Routine/Complete Inspection | No Violations Noted | At the time of inspection well equipped for production. Brine tank within secondary containment and appears structurally sound. |
Inspection ID | Violation ID | Violation Date | Date Resolved | Violation Code | Violation Type | Violation Comments |
---|---|---|---|---|---|---|
2189814 | 674641 | 08/06/2013 | 2013-08-06 | 78.54* - Failure to properly control or dispose of industrial or residual waste to prevent pollution of the waters of the Commonwealth. | Environmental Health & Safety |
Violation ID | Penalty ID | Penalty Code | Penalty Status | Penalty Date | Enforcement Date | Penalty Amount | Amount Collected |
---|---|---|---|---|---|---|---|
674641 | 300698 | NOV - Notice of Violation | Comply/Closed | 2013-10-02 | |||
674641 | 310747 | CACP - Consent Assessment of Civil Penalty | Comply/Closed | 2014-04-30 | 2014-04-30 | $2,500.00 | $2,500.00 |
For data sources see[7]