X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-081-20717

Well Details

Well ID: 37-081-20717
Loading map...
Country: United States
State: Pennsylvania
County: Lycoming
Municipality: Penn Township
Operator Name: EXCO RESOURCES PA LLC
Well Pad ID: 148239
Farm/Lease Name: DOEBLER UNIT 2H
License Status: Active
Spud Date: 2011-11-09
Permit Date: 2011-10-17
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.283697
Longitude: -76.589689

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-08-07 2013-08-28 7297 3,860,010.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Operator Carrier/Base Fluid Water 7732-18-5 100 84.7562 0
FR-66 Halliburton Friction Reducer Hydrotreated light petroleum distaillate 64742-47-8 30 0.02749 0
Scalechek LP-65 Scale Inhibitor Halliburton Scale Inhabitor Ammonium chloride 12125-02-9 10 0.00195 0
LCA-1 Halliburton Solvent Paraffinic solvent Proprietary 100 0.00214 0
SAND-PREMIUM WHITE Halliburton Proppant Crystalline Silica, quartz 14808-60-7 100 12.3767 0
SSA-2 Halliburton Proppant Crystalline Silica, quartz 14808-60-7 100 2.10025 0
BE-9 Halliburton Biocide Tributyl tetradecyl phosphonium chloride 81741-28-8 30 0.02749 0
FE ACID-<10% HCL Halliburton Acid Hydrochloric acid 7647-01-0 10 0.0633 0
HAI-OS ACID INHIBITOR Halliburton Corrosion Inhibitor Methanol 67-56-1 60 0.00061 0
Propargyl alcohol 107-19-7 10 0.0001 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2011 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2012 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2013 EXCO RESOURCES PA LLC 0.00 0 0.00 0 0.00 0
2014 EXCO RESOURCES PA LLC 1,016,984.00 360 0.00 0 0.00 0
2015 EXCO RESOURCES PA LLC 715,080.00 349 0.00 0 0.00 0
2016 EXCO RESOURCES PA LLC 472,654.00 277 0.00 0 0.00 0
2017 EXCO RESOURCES PA LLC 510,103.00 337 0.00 0 0.00 0
2018 EXCO RESOURCES PA LLC 429,598.00 334 0.00 0 0.00 0
2019 EXCO RESOURCES PA LLC 105,375.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S01 Drill Cuttings (in Tons) 623.44 Tons LANDFILL 301358
2013-S02 Fracing Fluid Waste (in Barrels) 350.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC024
2013-S02 Fracing Fluid Waste (in Barrels) 5,800.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013-S02 Fracing Fluid Waste (in Barrels) 534.00 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Fracturing Fluid Waste (in Tons) 29.50 Tons LANDFILL 301358
2013-S02 Produced Fluid (in Barrels) 689.26 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC024
2013-S02 Produced Fluid (in Barrels) 1,459.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013-S02 Produced Fluid (in Barrels) 1,095.68 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC009
2013-S02 Produced Fluid (in Barrels) 54.76 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014-S01 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014-S01 Produced Fluid (in Barrels) 329.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2014-S01 Produced Fluid (in Barrels) 219.10 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC024
2014-S02 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2014-S02 Produced Fluid (in Barrels) 110.00 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC010
2015-S01 Produced Fluid (in Barrels) 110.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016-S01 Produced Fluid (in Barrels) RWC 802 110.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016-S02 Produced Fluid (in Barrels) RWC 802 55.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2016-S02 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2017-M04 Produced Fluid (in Barrels) RWC 802 50.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M08 Produced Fluid (in Barrels) RWC 802 55.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2017-M11 Produced Fluid (in Barrels) RWC 802 50.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2018-M06 Produced Fluid (in Barrels) RWC 802 122.90 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 40.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019-M01 Produced Fluid (in Barrels) RWC 802 40.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019-M02 Produced Fluid (in Barrels) RWC 802 20.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE
2019-M03 Produced Fluid (in Barrels) RWC 802 47.00 Bbl INJECTION DISPOSAL WELL PAS2D205BCLE

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2012633 Primary Facility 2011-10-20 Drilling/Alteration No Violations Noted
2034062 Primary Facility 2012-01-12 Drilling/Alteration No Violations Noted
2062926 Primary Facility 2012-04-25 Routine/Complete Inspection No Violations Noted
2067471 Primary Facility 2012-05-11 Routine/Complete Inspection No Violations Noted
2077297 Primary Facility 2012-06-14 Follow-up Inspection No Violations Noted
2092261 Primary Facility 2012-08-16 Routine/Partial Inspection No Violations Noted
2098767 Primary Facility 2012-09-11 Routine/Partial Inspection No Violations Noted
2098794 Primary Facility 2012-09-05 Routine/Complete Inspection No Violations Noted
2117182 Primary Facility 2012-11-20 Routine/Complete Inspection No Violations Noted
2123226 Primary Facility 2012-12-06 Routine/Complete Inspection No Violations Noted
2125968 Primary Facility 2012-12-21 Complaint Inspection No Violations Noted
2151239 Primary Facility 2013-03-27 Drilling/Alteration No Violations Noted
2198891 Primary Facility 2013-08-26 Routine/Complete Inspection No Violations Noted
2575309 Primary Facility 2017-03-20 Routine/Complete Inspection No Violations Noted I entered the site at 09:40, in response to a spill notification phone call I received from Bird Smith (EXCO) at 08:20 this morning. Mr. Smith reported that

approximately 56 barrels of produced water were released to containment from the bottom valve on the Doebler 3H (081-20718) produced water tank. The release was caused when the produced water froze in the valve and dislodged the gasket. At the time of the inspection, the Doebler 1-5H (081-20454, 081- 20717, 081-20718, 081-20719, 081-20720) wells were in production. Water was actively leaking from the bottom valve on the production tank for the Doebler 3H well but the vac-truck driver/operator was onsite vacuuming water from the containment. Snow was covering the ground around the containment and I found no evidence that any produced water had leaked out of the containment. Field conductivity of produced water in the containment was between 1650- 1995 umhos/cm at several locations. The conductivity of the produced water is significantly lower than expecte

2800849 Primary Facility 2018-11-08 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. No violations noted.
2845618 Primary Facility 2019-02-27 Routine/Complete Inspection No Violations Noted Five wells staged for production phase. Five each water separators. No leaks detected from production equipment. No violations noted.

For data sources see[7]

References