If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-051-24609 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.118661,"lon":-79.786567,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Fayette | |
Municipality: Washington Township | |
Operator Name: CHEVRON APPALACHIA LLC | |
Well Pad ID: 150856 | |
Farm/Lease Name: SICKLE UNIT 3H | |
License Status: Active | |
Spud Date: 2014-07-29 | |
Permit Date: 2014-02-14 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 40.118661 | |
Longitude: -79.786567 |
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 2015-03-22 | 2015-04-07 | 8070 | 11,305,000.0 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | J134 | Schlumberger | Gel Breaker | Hemicellulase enzyme | 9012-54-8 | 100 | 0.00133187 | 0 |
Proppant | Schlumberger | Proppant | Crystalline Silica | 14808-60-7 | 100 | 10.4893 | 0 | |
7.5% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 8 | 0.010218 | 0 | |
15% Acid | Schlumberger | Perf Cleanup | Hydrocloric Acid | 7647-01-0 | 15 | 0.0006002 | 0 | |
A264 | Schlumberger | Corrosion Inhibitor | Prop-2-yn-1-ol | 107-19-7 | 10 | 0.00001254 | 0 | |
Aliphatic acids | Proprietary | 30 | 0.00003763 | 0 | ||||
Aliphatic alcohols, ethoxylayed #1 | Proprietary | 30 | 0.00003763 | 0 | ||||
Methanol | 67-56-1 | 40 | 0.00005017 | 0 | ||||
U042 | Schlumberger | Iron Chelating Agent | Tetrasodium ethylenediam inetetraacetate | 64-02-8 | 60 | 0.00163809 | 0 | |
Sodium hydroxide | 1310-73-2 | 5 | 0.00013651 | 0 | ||||
Trisodium nitrilotriacetate (im purity) | 5064-31-3 | 10 | 0.00027301 | 0 | ||||
B317 | Schlumberger | Scale Inhibitor | Trisodium ortho phosphate | 7601-54-9 | 5 | 0.00010449 | 0 | |
Ethane-1,2-diol | 107-21-1 | 5 | 0.00010449 | 0 | ||||
J609W | Schlumberger | Friction Reducer | Ammonium Sulfate | 7783-20-2 | 30 | 0.00343633 | 0 | |
Urea | 57-13-6 | 5 | 0.00057272 | 0 | ||||
Base Fluid | Chevron | Carrier/Base Fluid | Water (Including Mix Water Supplied by Client) | 7732-18-5 | 100 | 89.3305 | 0 | |
M300 | BASF Corporation | Biocide | Water | 7732-18-5 | 75 | 0.00166441 | 0 | |
Glutaral | 111-30-8 | 25 | 0.0005548 | 0 | ||||
J580 | Schlumberger | Gelling Agent, Water | Carbohydrate Polymer | Proprietary | 100 | 0.0269889 | 0 | |
L058 | Schlumberger | Iron Stabilizer | Sodium erythorbate | 6381-77-7 | 100 | 0.00046876 | 0 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2014 | CHEVRON APPALACHIA LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2015 | CHEVRON APPALACHIA LLC | 1,012,315.00 | 155 | 0.00 | 0 | 0.00 | 0 |
2016 | CHEVRON APPALACHIA LLC | 1,395,998.00 | 366 | 0.00 | 0 | 0.00 | 0 |
2017 | CHEVRON APPALACHIA LLC | 964,761.00 | 365 | 0.00 | 0 | 0.00 | 0 |
2018 | CHEVRON APPALACHIA LLC | 688,295.00 | 334 | 0.00 | 0 | 0.00 | 0 |
2019 | CHEVRON APPALACHIA LLC | 163,021.00 | 90 | 0.00 | 0 | 0.00 | 0 |
For data sources see[5]
Period | Waste Type | Quantity | Disposal Method | Waste Facility ID |
---|---|---|---|---|
2014-S02 | Drill Cuttings (in Tons) | 195.93 Tons | LANDFILL | 100172 |
2014-S02 | Drill Cuttings (in Tons) | 669.89 Tons | LANDFILL | 100592 |
2014-S02 | Drill Cuttings (in Tons) | 221.80 Tons | LANDFILL | 100663 |
2014-S02 | Drilling Fluid Waste (in Barrels) | 619.57 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014-S02 | Fracing Fluid Waste (in Barrels) | 14.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2014-S02 | Fracing Fluid Waste (in Barrels) | 36.43 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S01 | Drill Cuttings (in Tons) | 41.97 Tons | LANDFILL | 100172 |
2015-S01 | Drill Cuttings (in Tons) | 215.04 Tons | LANDFILL | 100592 |
2015-S01 | Drilling Fluid Waste (in Barrels) | 105.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015-S01 | Fracing Fluid Waste (in Barrels) | 4,378.29 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015-S01 | Fracturing Fluid Waste (in Tons) | 70.55 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2015-S01 | Fracturing Fluid Waste (in Tons) | 2.51 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2015-S01 | Produced Fluid (in Barrels) | 64.29 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Fracing Fluid Waste (in Barrels) | 267.86 Bbl | RESIDUAL WASTE PROC FAC (GENERAL PERMIT) | WMGR123SW001 |
2015-S02 | Fracing Fluid Waste (in Barrels) | 0.04 Bbl | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2015-S02 | Fracing Fluid Waste (in Barrels) | 5,032.86 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2015-S02 | Fracturing Fluid Waste (in Tons) | 1.77 Tons | LANDFILL | 100172 |
2015-S02 | Produced Fluid (in Barrels) | 6,327.43 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S01 | Filter Socks (in Tons) RWC 812 | 0.08 Tons | STORAGE PENDING DISPOSAL OR REUSE | MID0209062814 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016-S01 | Produced Fluid (in Barrels) RWC 802 | 3,595.43 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2016-S01 | Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 | 28.57 Tons | RESIDUAL WASTE TRANSFER FACILITY | 101532 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 2,059.24 Bbl | CENTRALIZED TREATMENT PLANT FOR RECYCLE | WMGR123SW019 |
2016-S02 | Produced Fluid (in Barrels) RWC 802 | 368.88 Bbl | REUSE OTHER THAN ROAD SPREADING | |
2017-M01 | Produced Fluid (in Barrels) RWC 802 | 271.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M02 | Produced Fluid (in Barrels) RWC 802 | 270.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 131.13 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M03 | Produced Fluid (in Barrels) RWC 802 | 113.00 Bbl | REUSE (AT WELL PAD) | |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 62.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M04 | Produced Fluid (in Barrels) RWC 802 | 31.43 Bbl | REUSE (AT WELL PAD) | |
2017-M05 | Produced Fluid (in Barrels) RWC 802 | 7,506.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M06 | Drilling Fluid Waste (in Barrels) RWC 803 | 49.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 84.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M06 | Produced Fluid (in Barrels) RWC 802 | 17.14 Bbl | REUSE (AT WELL PAD) | |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 48.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 65.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M07 | Produced Fluid (in Barrels) RWC 802 | 16.43 Bbl | REUSE (AT WELL PAD) | |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 32.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 51.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 15.29 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M08 | Produced Fluid (in Barrels) RWC 802 | 32.14 Bbl | REUSE (AT WELL PAD) | |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 99.29 Bbl | REUSE (AT WELL PAD) | |
2017-M09 | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 16.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW001 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 16.00 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M10 | Produced Fluid (in Barrels) RWC 802 | 16.43 Bbl | REUSE (AT WELL PAD) | |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 32.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2017-M11 | Produced Fluid (in Barrels) RWC 802 | 126.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2017-M12 | Produced Fluid (in Barrels) RWC 802 | 131.68 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 31.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 48.86 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-M01 | Produced Fluid (in Barrels) RWC 802 | 125.00 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 31.43 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW019 |
2018-M02 | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 17.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 31.86 Bbl | REUSE (AT WELL PAD) | |
2018-M03 | Produced Fluid (in Barrels) RWC 802 | 29.29 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 17.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 31.43 Bbl | REUSE (AT WELL PAD) | |
2018-M04 | Produced Fluid (in Barrels) RWC 802 | 16.43 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M05 | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 32.14 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 31.86 Bbl | REUSE (AT WELL PAD) | |
2018-M06 | Produced Fluid (in Barrels) RWC 802 | 47.86 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 31.43 Bbl | REUSE (AT WELL PAD) | |
2018-M07 | Produced Fluid (in Barrels) RWC 802 | 79.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M08 | Produced Fluid (in Barrels) RWC 802 | 109.29 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 29.86 Bbl | REUSE (AT WELL PAD) | |
2018-M09 | Produced Fluid (in Barrels) RWC 802 | 120.57 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M11 | Produced Fluid (in Barrels) RWC 802 | 156.57 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 16.00 Bbl | REUSE (AT WELL PAD) | |
2018-M12 | Produced Fluid (in Barrels) RWC 802 | 62.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 84.29 Bbl | REUSE (AT WELL PAD) | |
2019-M01 | Produced Fluid (in Barrels) RWC 802 | 17.14 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 48.57 Bbl | REUSE (AT WELL PAD) | |
2019-M02 | Produced Fluid (in Barrels) RWC 802 | 15.71 Bbl | REUSE AT A WELL PAD OUTSIDE PENNSYLVANIA | |
2019-M03 | Drilling Fluid Waste (in Barrels) RWC 803 | 15.71 Bbl | RESIDUAL WASTE PROCESSING FACILITY | WMGR123SW005 |
2019-M03 | Produced Fluid (in Barrels) RWC 802 | 148.57 Bbl | REUSE (AT WELL PAD) |
For data sources see[6]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
2298811 | Primary Facility | 2014-08-01 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, CONDUCTOR SET @ 55' AND CEMENTED IN (7/31/2014). |
2299813 | Primary Facility | 2014-08-21 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 14 START MOVING ON SICKLE # 3 - H (8/21/2014). |
2299815 | Primary Facility | 2014-08-23 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 14 DRILLING ON AIR @ 405' (TD). CEMENTING WATER PROTECTION CASING AND CEMENTING TONIGHT. |
2299823 | Primary Facility | 2014-08-25 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, HIGHLANDS # 14 DRILLING ON AIR @ 526' (TD).RUNNING COAL PROTECTION CASING AND CEMENTING TONIGHT. |
2313125 | Primary Facility | 2014-10-10 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, DRILLING ON 10.2 WATER BASE MUD @ 2437' (TD). RUNNING INTERMEDIATE CASING AND CEMENTING TONIGHT(10/15/2014). RIG IS IN PROCESS OF MOVING TO SICKLE # 4 WHILE CEMENTING # 3 INTERMEDIATE CASING. |
2313136 | Primary Facility | 2014-10-15 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS, DRILLING ON 10.2 WATER BASE MUD @ 2437' (TD). RUNNING INTERMEDIATE CASING AND CEMENTING TONIGHT(10/15/2014). RIG IS IN PROCESS OF MOVING TO SICKLE # 4 WHILE CEMENTING # 3 INTERMEDIATE CASING. |
2338683 | Primary Facility | 2014-12-30 | Drilling/Alteration | No Violations Noted | HORIZONTAL MARCELLUS,Drilling on 12.4 oil base mud @16,260 ' (TD).Running 51/2" Prod. Casing and cementing tonight (12/28/2014 ). |
2360471 | Primary Facility | 2015-04-02 | Complaint Inspection | No Violations Noted | At time of inspection, pumps utilized for frac’g operations in process of being replaced and set-up of waterlines to 1H also occurring. Frac’g of 3H completed this morning. 1H, 2H frac’d. 4H, 5H, 6H, 7H perforated, not yet frac’d. |
2373951 | Primary Facility | 2015-05-28 | Site Restoration | No Violations Noted | |
2504362 | Primary Facility | 2016-06-01 | Routine/Complete Inspection | No Violations Noted |
On 06/01/16 at approximately 1400 hours I conducted a routine complete inspection of the Sickle Unit. The Act 9 sign was in place and all required documents were present at the mail box. The site was well vegetated and the site had been partially reclaimed. An area along the access road appeared to have been recently restored and graded. There were no violations observed at the time of inspection. |
2523479 | Primary Facility | 2016-09-08 | Routine/Complete Inspection | No Violations Noted | HORIZONTAL MARCELLUS, Well appears to be producing natural gas. |
2682081 | Primary Facility | 2018-01-10 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. |
2734818 | Primary Facility | 2018-05-29 | Routine/Complete Inspection | No Violations Noted | The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The production equipment appeared to be in good condition. There were no violations observed at the time of inspection. |
2768895 | Primary Facility | 2018-08-23 | Routine/Partial Inspection | No Violations Noted | On 08/23/18 at approximately 1200 hours I met Curtis Small of Chevron to discuss transferring previously approved redlines to the PCSM page prior to Chevron submitting for an NOT. The Act 9 sign was in place and all required documents were present at the site. Redlines approved in 2014 were transferred to the PCSM sheet.
A small fluid release was observed on the site entrance outside the gated area. The fluid appeared to be similar in type to hydraulic fluid. A line of spilled fluid was observed leaving the site and continuing down the road. During the inspection agricultural equipment was observed traveling back and forth on the roadway adjacent to the site. |
2809349 | Primary Facility | 2018-11-21 | Site Restoration | No Violations Noted | A site restoration inspection was conducted in response to an NOT submittal from Chevron. The Act 9 sign was in place and all required documents were present at the site. The site was well vegetated and there were no signs of erosion observed. The site met and exceeded uniform 70% vegetative cover. PCSM features were installed and appeared to be functioning. The NOT is approved. |
For data sources see[7]