X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-113-20393

Well Details

Well ID: 37-113-20393
Loading map...
Country: United States
State: Pennsylvania
County: Sullivan
Municipality: Colley Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 152222
Farm/Lease Name: TA 6H
License Status: Active
Spud Date: 2018-07-12
Permit Date: 2018-01-23
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.538983
Longitude: -76.259194

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-09-09 2018-10-16 9639 9,091,030.0 884040

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0
ThinFrac MP I BJ SERVICES Friction Reducer Sodium Chloride 7647-14-5 0.05 0.00004000 0
Oxyalkylated alcohol Trade Secret 0.05 0.00004000 0
Distillates (petroleum), Hydrotreated Light 64742-47-8 0.3 0.00022 0
ResCare IC 300L BJ SERVICES Iron Control Agent Citric Acid 000077-92-9 0.5 0.00003000 0
HCL10.1 - 15 BJ SERVICES Acid Water 007732-18-5 0.85 0.00049 0
Hydrochloric Acid 007647-01-0 0.15 0.00009000 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.76382 0
CI-14 BJ SERVICES Corrosion Inhibitor Proprietary Olefin Trade Secret 0.05 0 0
Proprietary Fatty Acids Trade Secret 0.1 0 0
Proprietary Polyoxyalkylenes Trade Secret 0.2 0 0
Methanol (Methyl Alcohol) 000067-56-1 0.7 0.00001000 0
Propargyl Alcohol (2-Propynol) 000107-19-7 0.05 0 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.04339 0
FracCare SI720 BJ SERVICES Scale Inhibitor Diethylene Glycol 000111-46-6 0.05 0.00001000 0
Ethylene Glycol 000107-21-1 0.35 0.00008000 0
HCL 5.1 - 7.5 BJ SERVICES Acid Water 007732-18-5 0.93 0.00714 0
Hydrochloric Acid 007647-01-0 0.08 0.00058 0
Northern White Sand BJ SERVICES Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.18344 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CHESAPEAKE APPALACHIA LLC 321,093.00 35 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 734,551.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 1,272.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 27.50 Bbl REUSE (AT WELL PAD)
2018-M07 Waste Water Treatment Sludge (in Tons) RWC 804 2.90 Tons LANDFILL 301626
2018-M08 Drill Cuttings (in Tons) RWC 810 91.10 Tons LANDFILL 100933
2018-M08 Drill Cuttings (in Tons) RWC 810 73.92 Tons LANDFILL 8-0728-0004/013
2018-M08 Drill Cuttings (in Tons) RWC 810 77.71 Tons LANDFILL THR029
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 841.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl REUSE (AT WELL PAD)
2018-M08 Produced Fluid (in Barrels) RWC 802 208.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M08 Produced Fluid (in Barrels) RWC 802 31.30 Bbl REUSE (AT WELL PAD)
2018-M08 Synthetic Liner Materials (in Tons) RWC 806 2.50 Tons LANDFILL 8-0728-0004/013
2018-M08 Waste Water Treatment Sludge (in Tons) RWC 804 38.70 Tons LANDFILL 301626
2018-M09 Drilling Fluid Waste (in Tons) RWC 803 180.30 Tons LANDFILL 301626
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 128.80 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 1.30 Bbl REUSE (AT WELL PAD)
2018-M09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 1.40 Tons LANDFILL 8-0728-0004/013
2018-M09 Waste Water Treatment Sludge (in Tons) RWC 804 0.90 Tons LANDFILL 301626
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 324.25 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 36.25 Bbl REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 138.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M10 Produced Fluid (in Barrels) RWC 802 27.00 Bbl REUSE (AT WELL PAD)
2018-M10 Synthetic Liner Materials (in Tons) RWC 806 0.45 Tons LANDFILL 8-0728-0004/013
2018-M10 Waste Water Treatment Sludge (in Tons) RWC 804 5.58 Tons LANDFILL 301626
2018-M11 Produced Fluid (in Barrels) RWC 802 271.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M11 Produced Fluid (in Barrels) RWC 802 25.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M11 Produced Fluid (in Barrels) RWC 802 1,082.71 Bbl REUSE (AT WELL PAD)
2018-M11 Waste Water Treatment Sludge (in Tons) RWC 804 1.48 Tons LANDFILL 301626
2018-M12 Produced Fluid (in Barrels) RWC 802 347.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M12 Produced Fluid (in Barrels) RWC 802 239.50 Bbl REUSE (AT WELL PAD)
2018-M12 Synthetic Liner Materials (in Tons) RWC 806 21.20 Tons LANDFILL 101243
2018-M12 Waste Water Treatment Sludge (in Tons) RWC 804 58.70 Tons LANDFILL 301626
2019-M01 Produced Fluid (in Barrels) RWC 802 555.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019-M01 Produced Fluid (in Barrels) RWC 802 35.00 Bbl REUSE (AT WELL PAD)
2019-M01 Waste Water Treatment Sludge (in Tons) RWC 804 0.73 Tons LANDFILL 301626
2019-M02 Produced Fluid (in Barrels) RWC 802 220.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019-M02 Produced Fluid (in Barrels) RWC 802 81.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M02 Waste Water Treatment Sludge (in Tons) RWC 804 2.20 Tons LANDFILL 301626
2019-M03 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019-M03 Produced Fluid (in Barrels) RWC 802 297.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M03 Waste Water Treatment Sludge (in Tons) RWC 804 0.79 Tons LANDFILL 301358
2019-M03 Waste Water Treatment Sludge (in Tons) RWC 804 9.53 Tons LANDFILL 301626

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2751207 Primary Facility 2018-07-12 Drilling/Alteration No Violations Noted Spud notification received on 7/12/2018 for the 6H and 23H wells.

Nomac Peakrig 71 already drilled 1H and 21H wells within the past month.

Neil Brown did a walk-around with the Department during this inspection. No violations noted.

2753460 Primary Facility 2018-07-18 Routine/Complete Inspection No Violations Noted Weather was 70 and sunny at time of inspection. Met with Chesapeake representative Joe Foerste on location. Well is a spud conductor. At time of inspection well was covered with rig mats due to the drilling on the other wells on the pad. No violations were noted at time of inspection.
2758644 Primary Facility 2018-08-01 Routine/Complete Inspection No Violations Noted Weather was 70 and sunny at time of inspection. Met with Chesapeake representative Joe Foerste on location. Rig was in the process of drilling the 17 1/2" hole for the surface casing. They estimated cementing the surface casing on 8/2/2018. Performed a walk around inspection of location. No violations were noted at time of inspection.
2768397 Primary Facility 2018-08-28 Routine/Complete Inspection No Violations Noted Weather was 75° and sunny at time of inspection. There were no Chesapeake representatives on location at time of inspection. Well was closed in at time of inspection. Well was not yet stimulated. Well had a 0-10k analog pressure gauge attached to the top of the wellhead with a needle valve below it. The gauge read 0 psi at time of inspection. There were no violations noted at time of inspection.
2790922 Primary Facility 2018-10-17 Routine/Complete Inspection Pending I arrived onsite and was unable to locate a Chesapeake company representative. I spoke briefly with one of the workers on the site, who informed me that the frac had ended that morning, and that equipment removal was beginning. Puddles located on the pad surface outside of containment were generally low in conductivity (.6-1.1 mS/cm). Between the freshwater AST and the upright brine tanks in containment, however, I identified an area where high conductance water (19.42 mS/cm) was seeping slowly from under the containment liner. The affected area was approximately 2'x5' and very muddy with little free water, but I was able to collect a sample (sample ID# 0939076) by scraping out a small depression where the water was flowing and bailing the fluid into the sample containers with the container caps. I strongly recommend that Chesapeake attempt to determine the source of this fluid, as the volume of fluid present under the liner is unknown. The result of the inspection will be left as Pending until sample
2804052 Primary Facility 2018-11-16 Administrative/File Review No Violations Noted Sample results received from sample ID# 0939076, taken on 10/17/18. Results show elevated barium, strontium, and chlorides, indicative of a release of wastewater to the pad. The Department would like to encourage Chesapeake to report all spills and releases within 2 hours of discovery, regardless of volume. The result of the Administrative inspection is Violation Noted.

For data sources see[7]

References