If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 37-115-20395 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":41.88395,"lon":-75.992386,"icon":""}]} |
Country: United States | |
State: Pennsylvania | |
County: Susquehanna | |
Municipality: Forest Lake Township | |
Operator Name: CARRIZO (MARCELLUS) LLC | |
Well Pad ID: | |
Farm/Lease Name: BAKER 2H | |
License Status: | |
Spud Date: | |
Permit Date: 2010-07-15 | |
Unconventional Well: Y | |
Configuration: Horizontal Well | |
Latitude: 41.883950 | |
Longitude: -75.992386 |
Period | Operator Name | Gas Quantity (mcf) | Gas Production Days | Oil Quantity (bbl) | Oil Production Days | Water Quantity (bbl) | Water Production Days |
---|---|---|---|---|---|---|---|
2010 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
2011 | CARRIZO (MARCELLUS) LLC | 0.00 | 0 | 0.00 | 0 | 0.00 | 0 |
For data sources see[4]
Inspection ID | Inspection Category | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|---|
1928308 | Primary Facility | 2010-11-17 | Routine/Complete Inspection | No Violations Noted | This site is currently being constructed. No 7 day notice was received by the Department that construction had begun. There was no ESCGP on site. The issues that were noteworthy were the topsoil pile on the North end requires mulching and seeding, the filter sock on the north side is not on the contour, and there is a check dam installed in the sediment trap. The check dam does not conform with the ESCGP that I had on hand to conduct the inspection. I spoke with Company Man, Jeff Myers, about the issues. I have emailed Carrizo Staff regarding the plan and notice but have not received a response. I will reinspect this site. |
1949297 | Primary Facility | 2011-02-12 | Routine/Complete Inspection | No Violations Noted | 165 Gallons of diesel fuel spilled on to containment due to an absent minded fuel handler. The fuel was vacuumed up. I did not observe any evidence that the spill left the containment, however, I will reinspect the site when the equipment is removed to attempt to determine if the spill had left containment. |
1955399 | Primary Facility | 2011-03-08 | Routine/Complete Inspection | No Violations Noted |
For data sources see[5]