X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-21887

Well Details

Well ID: 37-115-21887
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Jackson Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 151951
Farm/Lease Name: COLWELL A 5
License Status: Active
Spud Date: 2015-03-25
Permit Date: 2014-10-27
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.824814
Longitude: -75.596017

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2015-10-13 2015-11-13 6811 8,655,700.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Sand TSS Proppant Silica Substrate 14808-60-7 100 11.141 9,129,040.0
Plexslick 957 Chemplex Friction Reducer Paraffinic, Naphtehenic Solvent 64742-47-8 30 0.0283333 23216.7
Ammonium Chloride 12125-02-9 5 0.00472222 3869.45
Nonionic Surfactants Proprietary 1.5 0.00141667 1160.83
Poly (acrylamide-co-acrylic acid), partial sodium salt 62649-23-4 35 0.0330555 27086.1
Plexcide 15G Chemplex Biocide Alkyl Dimethyl Benzyl Ammonium Chloride 68424-85-1 3 0.000689399 564.902
Ethanol 64-17-5 3 0.000689399 564.902
Didecyl Dimethyl Ammonium Chloride 7173-51-5 3 0.000689399 564.902
Glutaraldehyde 111-30-8 14 0.00321719 2636.21
15% HCL Reagent Acidizing Hydrochloric Acid 7647-01-0 15 0.0408638 33484.3
Chemplex 4-N-1 Chemplex Combination/Iron Control Diethanolamine 111-42-2 2 0.00003636 29.792
Cocamide Diethanolamine Salt 68603-42-9 2 0.00003636 29.792
Propargyl Alcohol 107-19-7 1 0.00001818 14.896
2-Ethylhexanol 104-76-7 10 0.000181787 148.958
n-olefins Proprietary 1 0.00001818 14.896
Acetic Acid 64-19-7 85 0.00154519 1266.15
Alcohol Ethoxylate Surfactants Proprietary 2 0.00003636 29.792
Methyl Alcohol 67-56-1 10 0.000181787 148.958
thiourea-formaldehyde copolymer 68527-49-1 2 0.00003636 29.792
Greenhib 679 Chemplex Friction Reducer Proprietary Proprietary 35 0.00858717 7036.44
Glycerine 56-81-5 20 0.00490695 4020.82
Water Operator Carrier/Base Fluid Water 7732-18-5 100 88.4428 72,471,200.0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2015 CABOT OIL & GAS CORP 20,446.27 4 0.00 0 0.00 0
2016 CABOT OIL & GAS CORP 1,399,528.99 363 0.00 0 0.00 0
2017 CABOT OIL & GAS CORP 925,439.90 359 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 776,630.00 365 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 168,634.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2015-S01 Drill Cuttings (in Tons) 1,379.23 Tons LANDFILL 101247
2015-S02 Fracing Fluid Waste (in Barrels) 174.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2015-S02 Fracing Fluid Waste (in Barrels) 5,417.44 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Fracturing Fluid Waste (in Tons) 17.54 Tons LANDFILL UT2300249
2016-S01 Fracturing Fluid Waste (in Barrels) RWC 805 1,902.26 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016-S01 Produced Fluid (in Barrels) RWC 802 12,707.54 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NE002
2016-S01 Synthetic Liner Materials (in Tons) RWC 806 8.16 Tons LANDFILL 101247
2016-S01 Waste Water Treatment Sludge (in Tons) RWC 804 10.65 Tons LANDFILL 301358
2016-S01 Waste Water Treatment Sludge (in Tons) RWC 804 2.64 Tons LANDFILL UT2300249
2016-S02 Produced Fluid (in Barrels) RWC 802 211.17 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NE004
2016-S02 Produced Fluid (in Barrels) RWC 802 1,800.13 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M01 Produced Fluid (in Barrels) RWC 802 53.31 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M01 Produced Fluid (in Barrels) RWC 802 240.43 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M02 Produced Fluid (in Barrels) RWC 802 177.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M02 Produced Fluid (in Barrels) RWC 802 51.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M03 Produced Fluid (in Barrels) RWC 802 82.01 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M03 Produced Fluid (in Barrels) RWC 802 189.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M04 Produced Fluid (in Barrels) RWC 802 210.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M05 Produced Fluid (in Barrels) RWC 802 235.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M06 Produced Fluid (in Barrels) RWC 802 52.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M06 Produced Fluid (in Barrels) RWC 802 184.22 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M07 Produced Fluid (in Barrels) RWC 802 21.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2017-M07 Produced Fluid (in Barrels) RWC 802 131.08 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M07 Synthetic Liner Materials (in Tons) RWC 806 0.82 Tons LANDFILL 101247
2017-M08 Produced Fluid (in Barrels) RWC 802 210.85 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M08 Produced Fluid (in Barrels) RWC 802 30.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2017-M09 Produced Fluid (in Barrels) RWC 802 165.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M10 Produced Fluid (in Barrels) RWC 802 194.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M11 Produced Fluid (in Barrels) RWC 802 173.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M12 Produced Fluid (in Barrels) RWC 802 189.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M01 Produced Fluid (in Barrels) RWC 802 136.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M01 Produced Fluid (in Barrels) RWC 802 23.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M02 Produced Fluid (in Barrels) RWC 802 184.36 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M03 Produced Fluid (in Barrels) RWC 802 67.06 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M03 Produced Fluid (in Barrels) RWC 802 79.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M04 Produced Fluid (in Barrels) RWC 802 133.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M04 Produced Fluid (in Barrels) RWC 802 22.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M05 Produced Fluid (in Barrels) RWC 802 87.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M05 Produced Fluid (in Barrels) RWC 802 65.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M06 Produced Fluid (in Barrels) RWC 802 110.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M06 Produced Fluid (in Barrels) RWC 802 44.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M07 Produced Fluid (in Barrels) RWC 802 90.18 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 67.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M08 Produced Fluid (in Barrels) RWC 802 166.44 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M09 Produced Fluid (in Barrels) RWC 802 137.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M09 Produced Fluid (in Barrels) RWC 802 24.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M10 Produced Fluid (in Barrels) RWC 802 166.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M11 Produced Fluid (in Barrels) RWC 802 76.11 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M11 Produced Fluid (in Barrels) RWC 802 42.28 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M12 Produced Fluid (in Barrels) RWC 802 110.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M12 Produced Fluid (in Barrels) RWC 802 20.07 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M01 Produced Fluid (in Barrels) RWC 802 21.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M01 Produced Fluid (in Barrels) RWC 802 114.71 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M02 Produced Fluid (in Barrels) RWC 802 147.23 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M03 Produced Fluid (in Barrels) RWC 802 46.63 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M03 Produced Fluid (in Barrels) RWC 802 93.26 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2357436 Primary Facility 2015-04-01 Drilling/Alteration No Violations Noted
2363739 Primary Facility 2015-03-19 Preoperation Inspection No Violations Noted On 3/19/15, the Department was on site at the Cabot Colwell A. Pad 1 to conduct a Preoperational Inspection. The well permits that have been issued for this pad are the Colwell 1H (115-21885), the 2H (115-21886), and the 5H (115-21887). All perimeter BMP’s in place to include red lined additions. Pad is 100% complete with about 20% of the pad left to mulch. No violations noted.
2368495 Primary Facility 2015-05-08 Drilling/Alteration No Violations Noted
2376782 Primary Facility 2015-04-20 Routine/Complete Inspection No Violations Noted On 4/20/15, the Department conducted an inspection of the Colwell A. Pad in response to a reported small spill of diesel fuel. Steve Watson of Cabot Oil and Gas reported that on 4/19/15, at approximately 11:50 pm, a truck delivering barite to the Colwell Pad had leaked diesel fuel onto the access road of the pad. The delivery truck fuel tank cap became dislodged and while the truck was moving up the access road, which has a relatively steep grade, the fuel spilled out as it sloshed around in the tank, consequently splashing out of the fuel tank onto the road surface.
2434434 Primary Facility 2015-12-15 Routine/Complete Inspection No Violations Noted Flowback operations and setting up for production of the 1H, 2H and 5H wells were in progress as we arrived to the site at 11:00. Conductivity of water accumulated from recent rainfall events in containment was (1.38) milliSiemens/cm, where the Erick Flowback Services gas buster tanks are staged, (2) ms/cm in the Rain for Rent spill guard containment next to a pump in the frac tank battery in the Southeast corner of the pad, (2-3) ms/cm in the tank battery and pad surface in the Southwest corner of the pad near where heavy equipment is staged and a trench has been dug in the pad surface to eventually contain production pipeline. The elevated conductivity readings indicate the potential that hydraulic flowback fluid may have been spilled to containment and has been diluted with rainwater in these particular areas of the site. Petroleum sheen was observed in the Rain for Rent Spill Guard containment near the port-a-johns where (4) drums are staged. One of the drums was labeled Oil & Diapers, Colwell 11/20/15.
2477057 Primary Facility 2016-04-21 Routine/Complete Inspection No Violations Noted
2479325 Primary Facility 2016-04-28 Routine/Complete Inspection No Violations Noted
2553373 Primary Facility 2017-01-18 Routine/Complete Inspection No Violations Noted At time of inspection, arrived on site at 13:50p.m., the cellar was full of water with no bubbling noticed. The (20x13) vent pipe was open and venting into a small plastic tank, the (13x9) vent pipe was open and venting into a small plastic tank, the (9x5) vent pipe was open and venting into a small plastic tank. There was 683psi on the production casing. I took a walk around the location and there were no obvious concerns noticed.

I left the site at 14:20p.m.

2643623 Primary Facility 2017-09-12 Routine/Complete Inspection No Violations Noted 3 wells located on pad. Equipment onsite includes: 1 brine tank, 3 glycol tanks and 1 condensate tank. All cellars filled with water with no visible bubbling at time of inspection. Production casing obtained from heater treaters are as follows: 1H-786.86psi; 2H-810.04psi; 5H-775.51psi. No violations noted at time of inspection.
2687780 Primary Facility 2018-01-22 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Site is snow covered. Plowing has occurred since last snow event. No E&S issues observed. No spills detected. No violations noted.
2739892 Primary Facility 2018-06-11 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water 1' below grade in the cellar and there was no bubbling noticed. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same tank. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2835881 Primary Facility 2019-02-05 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was in production. There was water and ice 1' below grade in the cellar and there was no bubbling noticed. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 1/2/19. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2844376 Primary Facility 2019-02-25 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. Access road and associated ditches in very good condition. Overall the site appears to have good stabilization. No E&S issues identified. No violations noted.

For data sources see[7]

References