X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22306

Well Details

Well ID: 37-115-22306
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Harford Township
Operator Name: CABOT OIL & GAS CORP
Well Pad ID: 154283
Farm/Lease Name: HAYNES, W. 2
License Status: Active
Spud Date: 2017-09-29
Permit Date: 2017-06-14
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.745050
Longitude: -75.674511

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-05-10 2018-06-20 7003.58 19,546,500.0 0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Cabot Carrier/Base Fluid Water 7732-18-5 100 87.9902 164,251,000.0
Scale Inhibitor, KSI-19NW Keane Scale Inhibitor Water 7732-18-5 95 0.0167179 31207.2
organic phosphonic salts 15827-60-8 15 0.00263966 4927.45
Other Chemical(s) Listed Above See Trade Name(s) List Ammonium chloride 12125-02-9 1.5 0.00158943 2966.98
Glutaral 111-30-8 26.7 0.00247024 4611.19
alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00105962 1977.98
organic phosphonic salts 15827-60-8 15 0.00263966 4927.45
Cinnamaldehyde 104-55-2 10 0.00007596 141.798
Ethoxylated alcohol 68131-39-5 10 0.00007596 141.798
didecyldimethylammonium chloride 7173-51-5 8 0.000737372 1376.45
isoproyl alcohol 67-63-0 5 0.00003798 70.899
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000151924 283.596
oleic acid diethanolamide 93-83-4 1.5 0.00158943 2966.98
Citric acid 77-92-9 30 0.000643398 1201.03
formic acid 64-18-6 10 0.00007596 141.798
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0211923 39559.7
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000491273 917.058
ethonal 64-17-5 2.8 0.000259052 483.571
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007596 141.798
Water 7732-18-5 7.5 0.00193433 3610.8
Iron Control, KFEAC-20/30 Keane Iron Control Acetic acid 64-19-7 5 0.000107233 200.172
Citric acid 77-92-9 30 0.000643398 1201.03
Sand (Proppant) Keane Proppant Crystalline silica: Quartz (SiO2) 14808-60-7 100 11.8482 22,117,100.0
Friction Reducer, KFR-16FW Keane Friction Reducer alcohols, C 12-16, ethoxylated 68551-12-2 1 0.00105962 1977.98
Ammonium chloride 12125-02-9 1.5 0.00158943 2966.98
Water 7732-18-5 60 0.063577 118679
Distillates (petroleum), hydrotreated light 64742-47-8 20 0.0211923 39559.7
oleic acid diethanolamide 93-83-4 1.5 0.00158943 2966.98
Biocide, MBC-516 Keane Biocide didecyldimethylammonium chloride 7173-51-5 8 0.000737372 1376.45
ethonal 64-17-5 2.8 0.000259052 483.571
Glutaral 111-30-8 26.7 0.00247024 4611.19
Water 7732-18-5 56.7 0.00524765 9795.77
quaternary ammonium compounds,
benzyl-C12-16-alkyldimethyl, chlorides
68424-85-1 5.3 0.000491273 917.058
Acid Inhibitor, KAI-12 Keane Acid Inhibitor formic acid 64-18-6 10 0.00007596 141.798
dipropylene gylcol, monomethyl ether 34590-94-8 20 0.000151924 283.596
Tar bases, quinoline derivs., benzyl chloride-quaternized 72480-70-7 10 0.00007596 141.798
Ethoxylated alcohol 68131-39-5 10 0.00007596 141.798
Cinnamaldehyde 104-55-2 10 0.00007596 141.798
isoproyl alcohol 67-63-0 5 0.00003798 70.899
Ethylene glycol 107-21-1 40 0.000303848 567.193
Hydrochloric Acid (15%) Keane Acidizing Water 7732-18-5 7.5 0.00193433 3610.8
Hydrochloric Acid 7647-01-0 15 0.00386865 7221.6

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2017 CABOT OIL & GAS CORP 0.00 0 0.00 0 0.00 0
2018 CABOT OIL & GAS CORP 3,446,178.00 134 0.00 0 0.00 0
2019 CABOT OIL & GAS CORP 1,863,319.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-M10 Synthetic Liner Materials (in Tons) RWC 806 2.75 Tons LANDFILL 101247
2018-M02 Drill Cuttings (in Tons) RWC 810 268.07 Tons LANDFILL 101247
2018-M03 Drill Cuttings (in Tons) RWC 810 1,066.50 Tons LANDFILL 101247
2018-M05 Synthetic Liner Materials (in Tons) RWC 806 1.47 Tons LANDFILL 101247
2018-M05 Waste Water Treatment Sludge (in Tons) RWC 804 2.94 Tons REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 3.50 Bbl REUSE (AT WELL PAD)
2018-M06 Synthetic Liner Materials (in Tons) RWC 806 0.51 Tons LANDFILL 101247
2018-M06 Waste Water Treatment Sludge (in Tons) RWC 804 4.29 Tons REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Barrels) RWC 802 2.91 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M07 Produced Fluid (in Barrels) RWC 802 22.38 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M07 Produced Fluid (in Barrels) RWC 802 387.59 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M07 Synthetic Liner Materials (in Tons) RWC 806 0.64 Tons LANDFILL 101247
2018-M07 Unused Fracturing Fluid Waste (in Tons) RWC 805 1.09 Tons LANDFILL 101247
2018-M07 Waste Water Treatment Sludge (in Tons) RWC 804 17.06 Tons REUSE (AT WELL PAD)
2018-M08 Other Oil & Gas Wastes (in Tons) RWC 899 0.23 Tons RESIDUAL WASTE PROCESSING FACILITY 301333
2018-M08 Produced Fluid (in Barrels) RWC 802 7,269.98 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M08 Produced Fluid (in Barrels) RWC 802 10,633.54 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M08 Synthetic Liner Materials (in Tons) RWC 806 6.32 Tons LANDFILL 101247
2018-M08 Waste Water Treatment Sludge (in Tons) RWC 804 40.63 Tons REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 607.79 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M09 Produced Fluid (in Barrels) RWC 802 10,125.55 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M09 Waste Water Treatment Sludge (in Tons) RWC 804 13.59 Tons REUSE (AT WELL PAD)
2018-M10 Produced Fluid (in Barrels) RWC 802 228.72 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M10 Produced Fluid (in Barrels) RWC 802 3,539.78 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M11 Produced Fluid (in Barrels) RWC 802 19.69 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M11 Produced Fluid (in Barrels) RWC 802 1,477.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2018-M11 Synthetic Liner Materials (in Tons) RWC 806 9.07 Tons LANDFILL 101247
2018-M12 Produced Fluid (in Barrels) RWC 802 334.66 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2018-M12 Produced Fluid (in Barrels) RWC 802 854.68 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M01 Produced Fluid (in Barrels) RWC 802 8.15 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M01 Produced Fluid (in Barrels) RWC 802 972.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M02 Produced Fluid (in Barrels) RWC 802 723.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004
2019-M03 Produced Fluid (in Barrels) RWC 802 144.17 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE002
2019-M03 Produced Fluid (in Barrels) RWC 802 537.04 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NE004

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2642967 Primary Facility 2017-10-03 Drilling/Alteration No Violations Noted At time of inspection.

I met with company man Ari Dabila. United Drilling was on site to drill and run conductor pipe in the 1H, 2H, 3H, 4H, 5H, 6H, 7H and 8H wells. The 1H, 2H, 3H, 4H, 5H and 7H wells were drilled to a depth of 104'. There was a rig on the 1H, 6H and 8H wells. The rig on the 6H was at a depth of 45' and will drill to 104'. The rig on the 8H was at a depth of 87' and will drill to 104'. The rig on the 1H was running conductor pipe. The conductor pipe will be set at 102' in all the wells and cemented to the surface. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2647603 Primary Facility 2017-09-27 Preoperation Inspection No Violations Noted Todays inspection was conduced as a preoperational inspection. He site has been built per plan with no red lined additions. No violations noted.
2710204 Primary Facility 2018-03-26 Drilling/Alteration No Violations Noted At time of inspection.

Met with company man Tony Ketterling. Nabors X36 was on site and drilling the lateral section of the well. The proposed TD for the well is 14,537'. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2714303 Primary Facility 2018-03-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as part of an investigation into a nearby water supply complaint. As photos 3 and 4 show, a drilling rig was on-site actively drilling. No E&S issues were identified. No violations were noted.
2736543 Primary Facility 2018-05-31 Routine/Complete Inspection No Violations Noted At time of inspection.

Met with company men Ron Rupert and Wayne Wilridge. Keane was on site to frac the 1H,2H,3H,4H,5H,6H,7H and 8H wells. They were on stage 23 out of 65 on the 8H when I arrived on location. The 1H and 3H haven't been started yet, there will be 32 stages on the 1H and 45 stages on the 3H. There were 15 stages completed out of 46 on the 2H. There were 25 stages completed out of 57 on the 4H. There were 15 stages completed out of 34 on the 5H. There were 24 stages completed out of 54 on the 6H. There were 20 stages completed out of 44 on the 7H. The water was being trucked to the location. I took a walk around the location and there were no obvious concerns noticed. There were no violations noted.

2740122 Primary Facility 2018-06-06 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. As the photo's show, hydraulic fracturing operations are still occurring at this site. Operations on the pad appeared to be impressively streamlined. No E&S issues were identified. The well connect pipeline for this pad appears to be close to completion as far as pipe installation is concerned. No violations noted.
2807302 Primary Facility 2018-11-28 Routine/Complete Inspection No Violations Noted At time of inspection.

The well was recently completed and put in production. The permit numbers on the entrance sign were correct. The well tag was on the well and correct. There was water 7.5' below grade in the cellar with no bubbling noticed and there was no gas detected in the remainder of the cellar. The (20x13), (13x9) and (9x5) annuli vent pipes were connected together and going to the same poly vent tank. There was gas detected at the poly vent tank with a MSA Altair 5X multi gas detector that was calibrated on 11/2/18. The production fluid was going into a 500bbl tank on containment and the containment appeared to be in good condition. There were four 500bbl tanks on containment and that containment appeared to be in good condition. The rest of the 500bbl tanks on site appeared to have been clean

2832727 Primary Facility 2019-01-28 Routine/Complete Inspection No Violations Noted Today's inspection was conducted as a routine inspection. All wells appear to be in production. Overall the site has good stabilization. No E&S issues identified. No violations noted.

For data sources see[7]

References