X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-115-22428

Well Details

Well ID: 37-115-22428
Loading map...
Country: United States
State: Pennsylvania
County: Susquehanna
Municipality: Auburn Township
Operator Name: CHESAPEAKE APPALACHIA LLC
Well Pad ID: 147009
Farm/Lease Name: BOREK 104H
License Status: Active
Spud Date: 2018-05-24
Permit Date: 2018-02-06
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.669038
Longitude: -76.110747

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2018-10-07 2018-10-12 7391.3 5,116,150.0 476868

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 SC-30 FOUNTAIN QUAIL Scale Inhibitor Sodium Hydroxide 1310-73-2 0.02 0 0
HAI-OS HALLIBURTON Corrosion Inhibitor Propargyl Alcohol (2-Propynol) 000107-19-7 0.1 0.00001000 0
Methanol (Methyl Alcohol) 000067-56-1 0.6 0.00004000 0
Recycled Produced Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.07351 0
Northern White Sand HALLIBURTON Proppant - Natural Crystalline Silica (Quartz Sand, Silicon Dioxide) 014808-60-7 1 0.16871 0
FE-2A, HAI-OS HALLIBURTON Corrosion Inhibitor, Iron Control Agent Non-MSDS Components Not Provided by Supplier Not Assigned 0 0 0
Fresh Water CHESAPEAKE ENERGY Carrier/Base Fluid Water 007732-18-5 1 0.74523 0
Excelerate PS-2 HALLIBURTON Friction Reducer Petroleum Distillate Hydrotreated Light 064742-47-8 0.3 0.00028 0
Inorganic salt Trade Secret 0.3 0.00028 0
7.5%HCL HYDROCHLORIC ACID HALLIBURTON Acid Hydrochloric Acid 007647-01-0 0.08 0.00085 0
Water 007732-18-5 0.93 0.01054 0
FE-2A HALLIBURTON Iron Control Agent Citric Acid 000077-92-9 0.6 0.00004000 0
Chlorine Dioxide FOUNTAIN QUAIL Anti-Bacterial Agent Chlorine Dioxide 10049-04-4 0.01 0 0

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2018 CHESAPEAKE APPALACHIA LLC 577,904.00 15 0.00 0 0.00 0
2019 CHESAPEAKE APPALACHIA LLC 2,216,932.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 108.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M05 Other Oil & Gas Wastes (in Barrels) RWC 899 78.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M05 Waste Water Treatment Sludge (in Tons) RWC 804 2.90 Tons LANDFILL 301626
2018-M06 Waste Water Treatment Sludge (in Tons) RWC 804 1.33 Tons LANDFILL 301626
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 55.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M07 Waste Water Treatment Sludge (in Tons) RWC 804 0.20 Tons LANDFILL 301626
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 1,010.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M08 Other Oil & Gas Wastes (in Barrels) RWC 899 136.80 Bbl REUSE (AT WELL PAD)
2018-M08 Waste Water Treatment Sludge (in Tons) RWC 804 37.20 Tons LANDFILL 301626
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 1,401.90 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 150.00 Bbl REUSE (AT WELL PAD)
2018-M09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 345.70 Tons LANDFILL 100933
2018-M09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 86.00 Tons LANDFILL THR029
2018-M09 Waste Water Treatment Sludge (in Tons) RWC 804 9.00 Tons LANDFILL 301626
2018-M10 Drill Cuttings (in Tons) RWC 810 6.96 Tons LANDFILL THR029
2018-M10 Drilling Fluid Waste (in Tons) RWC 803 200.59 Tons LANDFILL 301626
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 37.50 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M10 Other Oil & Gas Wastes (in Barrels) RWC 899 48.00 Bbl REUSE (AT WELL PAD)
2018-M10 Waste Water Treatment Sludge (in Tons) RWC 804 0.46 Tons LANDFILL 301626
2018-M11 Produced Fluid (in Barrels) RWC 802 662.74 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M11 Produced Fluid (in Barrels) RWC 802 68.27 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2018-M11 Produced Fluid (in Barrels) RWC 802 36.67 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NW011
2018-M11 Produced Fluid (in Barrels) RWC 802 508.96 Bbl REUSE (AT WELL PAD)
2018-M11 Waste Water Treatment Sludge (in Tons) RWC 804 3.61 Tons LANDFILL 301626
2018-M12 Produced Fluid (in Barrels) RWC 802 229.70 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2018-M12 Produced Fluid (in Barrels) RWC 802 93.40 Bbl REUSE (AT WELL PAD)
2018-M12 Waste Water Treatment Sludge (in Tons) RWC 804 38.80 Tons LANDFILL 301626
2019-M01 Produced Fluid (in Barrels) RWC 802 216.30 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019-M01 Produced Fluid (in Barrels) RWC 802 214.40 Bbl REUSE (AT WELL PAD)
2019-M01 Waste Water Treatment Sludge (in Tons) RWC 804 0.29 Tons LANDFILL 301626
2019-M02 Produced Fluid (in Barrels) RWC 802 81.10 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019-M02 Waste Water Treatment Sludge (in Tons) RWC 804 0.80 Tons LANDFILL 301626
2019-M03 Produced Fluid (in Barrels) RWC 802 70.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC008
2019-M03 Produced Fluid (in Barrels) RWC 802 98.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2019-M03 Waste Water Treatment Sludge (in Tons) RWC 804 0.50 Tons LANDFILL 301358
2019-M03 Waste Water Treatment Sludge (in Tons) RWC 804 6.06 Tons LANDFILL 301626

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2712685 Primary Facility 2018-03-30 Routine/Complete Inspection No Violations Noted I inspected the Borek well site on March 30, 2018. The access road was solid and stable. The pad surface was somewhat muddy due to recent rains. The wells were all properly labeled and the wells associated with this site were as follows:

115-21026 115-22426 115-22427 115-22428. The cut and fill slopes were very rocky but had vegetation where it was able to grow and there were no erosional issues observed.

There were no violations noted.

2759829 Primary Facility 2018-08-01 Drilling/Alteration No Violations Noted Upon arrival to location, (3) new 20" conductors have been set and cemented to surface for new wells, the Borek 2H, 4H and 104H. (1) open well cellar and (1) Existing well, the Borek S Sus 3H well has been shut in and disconnected from all production equipment. Liner and drilling mats have been installed in preparation for drilling new wells on pad.

- The Borek S Sus 3H well still had production tree installed. Pressure gauge installed on upper wing valve read 0 psi. at time of insp. (3) annular vents were present. The (5 1/2"/P) vent was shut in to gauge reading 0 psi. The (13 3/8"x 9 5/8") and (9 5/8"x 5 1/2") vents were open and venting to atmosphere through Sentry vent check fittings. Gas checks performed at these vents showed 0% LEL, 0% CH4. Well cellar had ~ 6" standing water, no bubbling was noted at time of inspection. See individual insp. for the Borek S Sus 3H for further info. - During this inspection no obvious concerns or violations were noted.

2774256 Primary Facility 2018-08-28 Drilling/Alteration No Violations Noted I arrived at the site at 11:26. The weather conditions are partly cloudy skies, a slight breeze, very warm and humid with temperatures in low to mid 80's. Patterson Drilling Rig # 572 is at the site. I met with Mickey Brewer, site company man, consultant of CHK, and Lauren Sorkin, Field Engineer of CHK. The Borek 4H well is currently in the process of being drilled at a depth of (838) feet. Mr. Brewer and Ms. Sorkin provided me with the following information pertaining to site activities. "We completed cementing of the surface casing at 11AM today, 8/28/18. This well will be drilled to a total depth of (12,710) feet. We are waiting on cement to cure for (8) hours. Schlumberger was the cement crew. We will resume drilling of the intermediate section tonight, 8/28/18. The Borek 2H was the most recent well drilled to total depth. The Borek 104H well will be the next well drilled to total depth. The Borek Sus 3H well was in production but is currently shut in." Mr. Brewer and Ms. Sorkin informed they wo

For data sources see[7]

References