X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-117-21585

Well Details

Well ID: 37-117-21585
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: ROCKDALE MARCELLUS LLC
Well Pad ID: 145419
Farm/Lease Name: LYNN D 719E 5H
License Status: Active
Spud Date: 2012-11-17
Permit Date: 2012-08-24
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.557836
Longitude: -77.079011

For data sources see[1][2][3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2013-07-19 2013-07-30 6807 6,117,970.0

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 I-22 Nalco Corrosion Inhibitor Quaternary ammonium compound Proprietary 5 0.000101399 60
Methanol 67-56-1 5 0.000101399 60
2-Mercaptoethyl Alcohol 60-24-2 5 0.000101399 60
Aromatic aldehyde Proprietary 30 0.000608391 360
Formic Acid 64-18-6 60 0.00121678 720
Quaternary ammonium compound Proprietary 30 0.000608391 360
Isopropanol 67-63-0 10 0.000202797 120
Oxyalkylated Fatty Acid Derivative Proprietary 30 0.000608391 360
Cyclic alkanes Proprietary 5 0.000101399 60
FR900 Nalco Friction Reducer Proprietary Proprietary 100 0.0782645 46311
MSI-7 National Petrochem Scale Inhibitor Hydrogen Chloride 7647-01-0 100 0.00869662 5146
Plexgel Breaker 10L Chemplex, L.C. Breaker No Hazardous Ingredients Proprietary 100 0.000155478 92
Sand Operator Proppant Silicon Dioxide 14808-60-7 100 13.1326 7,770,880.0
Bio-Clear 5000 Clearwater International LLC Biocide Proprietary Proprietart 95 0.0266628 15777
2,2-dibromo-3-nitril oprop ionam ide 10222-01-2 5 0.00140268 830
Plexgel 907 Chemplex, L.C. Gellant Guar Gum 9000-30-0 100 0.0192387 11384
FE-4 Chemplex, L.C. Iron Control Additive Citric Acid Anhydrous 77-92-9 55 0.00100892 597
Water 7732-18-5 55 0.00100892 597
Water Operator Base Carrier Fluid Water 7732-18-5 100 86.2292 51,023,900.0
15% Hydrochloric Acid Reagent Scale Dissolver 36% Hydrochloric Acid 7647-01-0 15 0.0749927 44375
Water 7732-18-5 85 0.42496 251459

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2012 SWEPI LP 0.00 0 0.00 0 0.00 0
2013 SWEPI LP 816,889.12 115 0.00 0 0.00 0
2014 SWEPI LP 1,533,443.28 360 0.00 0 0.00 0
2015 SWEPI LP 1,054,915.73 358 0.00 0 0.00 0
2016 SWEPI LP 819,994.50 366 0.00 0 0.00 0
2017 SWEPI LP 689,775.96 365 0.00 0 0.00 0
2018 ROCKDALE MARCELLUS LLC 518,557.00 365 0.00 0 0.00 0
2019 ROCKDALE MARCELLUS LLC 89,986.00 90 0.00 0 0.00 0

For data sources see[5]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2012-S02 Drill Cuttings (in Tons) 860.96 Tons LANDFILL 301358
2012-S02 Drilling Fluid Waste (in Barrels) 12.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-S02 Fracing Fluid Waste (in Barrels) 411.43 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123
2012-S02 Produced Fluid (in Barrels) 40.00 Bbl CENTRALIZED TREATMENT PLANT FOR RECYCLE WMGR123NC006
2013-S01 Drill Cuttings (in Tons) 613.37 Tons LANDFILL 301358
2013-S01 Drilling Fluid Waste (in Barrels) 238.90 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-S01 Drilling Fluid Waste (in Barrels) 65.60 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC006
2013-S01 Drilling Fluid Waste (in Barrels) 617.02 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S01 Fracing Fluid Waste (in Barrels) 409.55 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Drill Cuttings (in Tons) 5.43 Tons LANDFILL 301358
2013-S02 Fracing Fluid Waste (in Barrels) 52.50 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013-S02 Fracing Fluid Waste (in Barrels) 233.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-S02 Fracing Fluid Waste (in Barrels) 6.98 Bbl RESIDUAL WASTE TRANSFER FACILITY 7-3115-00193
2013-S02 Fracing Fluid Waste (in Barrels) 5,176.18 Bbl REUSE OTHER THAN ROAD SPREADING
2013-S02 Produced Fluid (in Barrels) 31.75 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR119
2013-S02 Produced Fluid (in Barrels) 165.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2013-S02 Produced Fluid (in Barrels) 4,698.55 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S01 Produced Fluid (in Barrels) 6,288.94 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Drill Cuttings (in Tons) 0.02 Tons LANDFILL 301358
2014-S02 Fracing Fluid Waste (in Barrels) 51.86 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2014-S02 Fracing Fluid Waste (in Barrels) 214.26 Bbl REUSE OTHER THAN ROAD SPREADING
2014-S02 Produced Fluid (in Barrels) 275.05 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2014-S02 Produced Fluid (in Barrels) 1,516.79 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Fracing Fluid Waste (in Barrels) 74.84 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S01 Produced Fluid (in Barrels) 183.37 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015-S01 Produced Fluid (in Barrels) 1,029.91 Bbl REUSE OTHER THAN ROAD SPREADING
2015-S02 Produced Fluid (in Barrels) 30.23 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123
2015-S02 Produced Fluid (in Barrels) 500.93 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2015-S02 Produced Fluid (in Barrels) 444.69 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S01 Produced Fluid (in Barrels) RWC 802 75.02 Bbl RESIDUAL WASTE PROC FAC (GENERAL PERMIT) WMGR123NC018
2016-S01 Produced Fluid (in Barrels) RWC 802 921.09 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Produced Fluid (in Barrels) RWC 802 100.02 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2016-S02 Produced Fluid (in Barrels) RWC 802 1,595.26 Bbl REUSE OTHER THAN ROAD SPREADING
2016-S02 Synthetic Liner Materials (in Tons) RWC 806 0.26 Tons LANDFILL 301358
2017-M01 Produced Fluid (in Barrels) RWC 802 33.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC018
2017-M01 Produced Fluid (in Barrels) RWC 802 33.33 Bbl REUSE (AT WELL PAD)
2017-M02 Produced Fluid (in Barrels) RWC 802 133.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2017-M03 Produced Fluid (in Barrels) RWC 802 33.33 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2017-M03 Produced Fluid (in Barrels) RWC 802 133.33 Bbl REUSE (AT WELL PAD)
2017-M04 Produced Fluid (in Barrels) RWC 802 233.33 Bbl REUSE (AT WELL PAD)
2017-M04 Waste Water Treatment Sludge (in Tons) RWC 804 2.06 Tons RESIDUAL WASTE PROCESSING FACILITY WMGR123
2017-M05 Produced Fluid (in Barrels) RWC 802 143.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2017-M06 Produced Fluid (in Barrels) RWC 802 233.33 Bbl REUSE (AT WELL PAD)
2017-M07 Produced Fluid (in Barrels) RWC 802 133.33 Bbl REUSE (AT WELL PAD)
2017-M08 Produced Fluid (in Barrels) RWC 802 54.20 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M08 Produced Fluid (in Barrels) RWC 802 133.33 Bbl REUSE (AT WELL PAD)
2017-M09 Produced Fluid (in Barrels) RWC 802 35.03 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2017-M09 Produced Fluid (in Barrels) RWC 802 16.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC022
2017-M09 Produced Fluid (in Barrels) RWC 802 116.67 Bbl REUSE (AT WELL PAD)
2017-M10 Produced Fluid (in Barrels) RWC 802 158.00 Bbl REUSE (AT WELL PAD)
2017-M12 Waste Water Treatment Sludge (in Tons) RWC 804 1.33 Tons STORAGE PENDING DISPOSAL OR REUSE PA-0678
2018-M02 Produced Fluid (in Barrels) RWC 802 140.92 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M03 Produced Fluid (in Barrels) RWC 802 146.67 Bbl REUSE (AT WELL PAD)
2018-M06 Produced Fluid (in Barrels) RWC 802 1,198.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-M06 Synthetic Liner Materials (in Tons) RWC 806 2.20 Tons LANDFILL 301358
2018-M07 Other Oil & Gas Wastes (in Barrels) RWC 899 83.40 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M07 Produced Fluid (in Barrels) RWC 802 130.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123
2018-M07 Produced Fluid (in Barrels) RWC 802 841.12 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123NC010
2018-M07 Produced Fluid (in Barrels) RWC 802 17.00 Bbl REUSE (AT WELL PAD)
2018-M07 Produced Fluid (in Tons) RWC 802 14.06 Tons LANDFILL 301358
2018-M07 Synthetic Liner Materials (in Tons) RWC 806 0.95 Tons LANDFILL 301358
2018-M08 Produced Fluid (in Barrels) RWC 802 50.00 Bbl REUSE (AT WELL PAD)
2018-M08 Synthetic Liner Materials (in Tons) RWC 806 0.77 Tons LANDFILL 301358
2018-M09 Other Oil & Gas Wastes (in Barrels) RWC 899 63.00 Bbl REUSE (AT WELL PAD)
2018-M09 Produced Fluid (in Barrels) RWC 802 225.00 Bbl REUSE (AT WELL PAD)
2018-M09 Soil Contaminated by Oil & Gas Related Spills (in Tons) RWC 811 31.05 Tons LANDFILL 301358
2018-M09 Synthetic Liner Materials (in Tons) RWC 806 2.81 Tons LANDFILL 301358
2018-M10 Produced Fluid (in Barrels) RWC 802 126.00 Bbl REUSE (AT WELL PAD)
2018-M11 Produced Fluid (in Barrels) RWC 802 40.00 Bbl REUSE (AT WELL PAD)
2018-M11 Synthetic Liner Materials (in Tons) RWC 806 0.99 Tons LANDFILL 301358
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 64.80 Bbl REUSE (AT WELL PAD)
2018-M12 Produced Fluid (in Barrels) RWC 802 71.00 Bbl REUSE (AT WELL PAD)
2018-M12 Synthetic Liner Materials (in Tons) RWC 806 0.54 Tons LANDFILL 301358
2019-M01 Produced Fluid (in Barrels) RWC 802 497.80 Bbl REUSE (AT WELL PAD)
2019-M02 Other Oil & Gas Wastes (in Barrels) RWC 899 227.33 Bbl REUSE (AT WELL PAD)
2019-M02 Produced Fluid (in Barrels) RWC 802 2,808.00 Bbl REUSE (AT WELL PAD)
2019-M02 Synthetic Liner Materials (in Tons) RWC 806 6.88 Tons LANDFILL 301358
2019-M03 Other Oil & Gas Wastes (in Barrels) RWC 899 358.00 Bbl REUSE (AT WELL PAD)
2019-M03 Produced Fluid (in Barrels) RWC 802 314.00 Bbl REUSE (AT WELL PAD)
2019-M03 Synthetic Liner Materials (in Tons) RWC 806 3.71 Tons LANDFILL 301358

For data sources see[6]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2118707 Primary Facility 2012-11-19 Routine/Complete Inspection Violation(s) Noted the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
2128606 Primary Facility 2013-01-02 Routine/Complete Inspection No Violations Noted
2182251 Primary Facility 2013-07-10 Routine/Complete Inspection No Violations Noted
2194928 Primary Facility 2013-08-07 Incident- Response to Accident or Event No Violations Noted 5 bbl spill on 8/3/13. Violations cited against the 1H permit. TLT
2207797 Primary Facility 2013-09-25 Follow-up Inspection No Violations Noted
2215566 Primary Facility 2013-10-22 Follow-up Inspection No Violations Noted
2230614 Primary Facility 2013-12-18 Compliance Evaluation No Violations Noted
2265779 Primary Facility 2014-04-23 Routine/Complete Inspection No Violations Noted
2361299 Primary Facility 2015-04-15 Routine/Complete Inspection No Violations Noted Temporary stabilization generally >70% cover. Temp BMPs in place. One filter sock near access road entrance needs repair. Elevated conductivity in sediment/infiltration basin on north side of pad (2.3 mS/cm). Several stained spots on pad surface.
2496424 Primary Facility 2016-06-27 Routine/Complete Inspection No Violations Noted Routine inspection to assess overall site conditions. No SWEPI representatives were present.

Vegetative cover on site is greater than 70%. No evidence of accelerated erosion or sedimentation was observed.

Per § 3216(c) of the 2012 Oil and Gas Act (58 Pa.C.S. §3216(c)), site restoration is required to occur within 9 months of completion of well drilling, unless an extension request is filed with, and approved by the Department. A restoration extension request was approved by the Department on 04/09/2015, which extends the restoration deadline until 04/09/2017.

No violations were cited during this inspection.

2543587 Primary Facility 2016-12-08 Routine/Complete Inspection No Violations Noted Routine inspection to assess overall site conditions. No SWEPI representatives were present.

Vegetative cover on site is greater than 70%. Temporary erosion and sediment control BMPs have been removed. No evidence of accelerated erosion or sedimentation was observed.

A restoration extension request was approved by the Department on 04/09/2015, which extends the restoration deadline until 04/09/2017. The Erosion and Sediment Control General Permit for the site expires on 05/01/2017.

No violations were cited during this inspection.

2717061 Primary Facility 2018-04-11 Routine/Complete Inspection No Violations Noted Weather was 33° and sunny at time of inspection. Thrre were no Rockdale representatives on location at time of inspection. Well had one analog pressure gauge attached above the swab valve and one analog pressure gauge attached to the 5 1/2 inch casing. The pressure gauge attached above the swab valve read approximately 250 psi and the gauge attached to the casing read approximately 0 psi at time of inspection. There were three annulus vents plumbed to surface. 2" vent appears to be the 5 1/2" x 9 5/8" annulus vent and the other 2 vents origins points are buried. Annulus vents were 2", 1 1/2" and 1". No combustible gas was detected at time of inspection. No violations noted at time of inspection.
2732092 Primary Facility 2018-05-14 Routine/Complete Inspection No Violations Noted At the time of the inspection; containment, tanks, and equipment were installed in anticipation of completions activities on several of the wells onsite. PCSM/Site Restoration plans have been partially implemented. Infiltration basins have been installed but the impervious gravel pad surface has not been reduced as depicted in the approved plans. A 2-year extension on site restoration was approved on 10/20/2017. The Department recommends the PCSM/Site Restoration plans be implemented as permitted by 10/20/2019 or modified to account for the impervious pad surface.
2738685 Primary Facility 2018-06-05 Routine/Complete Inspection No Violations Noted I met Luke Chesner and Levi Lee of Rockdale when I arrived. Coil tubing rig on location drilling out plugs on the 6H prior to moving to the 4H. I noted two areas on the pad that were wet and muddy, one between the coil tubing rig and a pump truck (approximately 5-8 gallons of free water and 30' x 40'), and one between two Baker tank batteries (approximately 10-15 gallons of free water and 30' x 50'). Conductance reading in the former was 9.22 mS/cm, and was over the limit of my meter (19.99mS/cm) in the latter. I pointed both of these areas out to Luke and Levi, and took a grab sample (ID#0939066) from a puddle in the area between the Baker tank batteries. Luke and Levi had a vac truck working in the area between the pump truck and the coil tubing rig almost immediately, and I recommended that they vac the area between the Baker tank batteries and start to remove the affected soil ASAP. The elevated conductance in these areas is an indication of a potential release of produced water or flowback to the
2761153 Primary Facility 2018-08-06 Incident- Response to Accident or Event No Violations Noted I arrived on site in response to a spill notification from Rockdale called in at 09:45 on 8/4/18. Regina Logue of Rockdale reported that approximately 2 barrels of potentially contaminated rainwater was released to the pad due to a failed containment, and stated that the release was near the aboveground storage tank. The only person present at the pad when I arrived was Brady Bryington of Principal Enterprise. He pointed out the area of the release, and when I inquired informed me that the AST contained fresh water. I screened the release area, which was at the corner of an upright tank containment, with my soil conductance meter; most readings were in the range of .10-2.2 mS/cm, and the readings dropped dramatically when I pushed the meter 1/4" into the soil. I did locate a spot that seemed to be somewhat removed from the spill area near the center of the upright tank containment that was over limit on my soil meter (greater than 4.0 mS/cm). Towards the rock-lined ditch from the release area, soil con
2791205 Primary Facility 2018-10-17 Routine/Partial Inspection No Violations Noted No activity on site. Due to time constraints, only a partial inspection was performed. Site had a large puddle (50-100 gallons) present in the area of the release documented in the 6/5/18 inspection. Soil conductance readings in this area ranged from .20-.53 mS/cm. Violations remain outstanding.

Violations Commited

Inspection ID Violation ID Violation Date Date Resolved Violation Code Violation Type Violation Comments
2118707 654846 11/19/2012 2012-11-19 201F - Failure to notify DEP, landowner, political subdivision, or coal owner 24 hrs prior to commencement of drilling Administrative the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection
2118707 654847 11/19/2012 2012-11-19 201E - Failure to comply with terms and conditions of permit Environmental Health & Safety the 1-6H wells on the pad were spud without electronic notification or pre-operational inspection

For data sources see[7]

References