37-117-21986

Well Details

Well ID: 37-117-21986
Loading map...
Country: United States
State: Pennsylvania
County: Tioga
Municipality: Liberty Township
Operator Name: REPSOL OIL & GAS USA LLC
Well Pad ID: 155180
Farm/Lease Name: HUGHES (02-204-10) E 10H
License Status: Active
Spud Date: 2018-09-11
Permit Date: 2018-04-26
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 41.633442
Longitude: -77.121703

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 REPSOL OIL & GAS USA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M09 Drill Cuttings (in Tons) RWC 810 5.29 Tons LANDFILL 8-0728-0004/013
2018-M09 Drill Cuttings (in Tons) RWC 810 11.60 Tons LANDFILL 8-4630-00010/00
2019-M02 Drill Cuttings (in Tons) RWC 810 209.16 Tons LANDFILL 101243
2019-M02 Drill Cuttings (in Tons) RWC 810 903.45 Tons LANDFILL 301358
2019-M03 Drill Cuttings (in Tons) RWC 810 87.54 Tons LANDFILL 101243
2019-M03 Drill Cuttings (in Tons) RWC 810 949.24 Tons LANDFILL 301358
2019-M03 Synthetic Liner Materials (in Tons) RWC 806 7.68 Tons LANDFILL 8-0728-0004/013

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2755679 Primary Facility 2018-06-27 Routine/Complete Inspection No Violations Noted Pre-Operational Inspection; 6/27/2018.

At the time of the inspection, perimeter E&S controls were installed, trees were cut/removed and earthmoving had begun. Overall, the site is in good condition. No violations noted.

2769029 Primary Facility 2018-08-29 Preoperation Inspection No Violations Noted I met with Repsol Construction Foreman, Johnny Pazzaglia, on site. He explained that they installed a rock lined ditch (photo 4) in the channel that was planned to be vegetated, because a ground water spring is flowing water through it. Water in the ditch is 0.03mS/cm w an Oakton PCSTestr 35 today.

E&S controls are in place to comply w: A^§ 3258. (a.1) Preoperation inspections.--The operator may not commence drilling activities until the DEP has conducted an inspection of the unconventional well site after the installation of erosion and sediment control measures. JLP

2779773 Primary Facility 2018-09-26 Routine/Complete Inspection No Violations Noted Weather was 64° and raining at time of inspection. There were no Repsol representatives on location at time of inspection. Well is a spud conductor only. Well has a rectangular concrete and steel cellar installed. Conductor casing and the mouse hole were set at time of inspection. The cellar was covered with a steel grate. No violations were noted at time of inspection.
2824630 Primary Facility 2019-01-09 Routine/Complete Inspection No Violations Noted I met Trent Henderson of Repsol when I arrived. Patterson rig 278 on location running casing in the 6H well. The rig will be skidding to the 4H next. Overall condition of the containment appeared to be excellent, and the contained areas were quite clean and neat. The cuttings backyard was also very clean.

For data sources see[6]