If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-21187 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.70256084,"lon":-81.73728988,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Bristol Township | |
Operator Name: OHIO ENERGY ASSETS, INC. | |
Well Pad ID: | |
Farm/Lease Name: HARDESTY FRANK | |
License Status: Final Restoration | |
License Date: 2013-07-29 | |
Spud Date: 1970-11-10 | |
Spud Drilling Contractor: | |
Final Drill Date: 1970-11-22 | |
Well Total Depth: 4950 ft | |
Configuration: Vertical | |
Latitude: 39.702560840 | |
Longitude: -81.73728988 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1970-11-09 | 853 REDMAN OIL CO INC GeoDate 11/9/70 |
Original Spud | 1970-11-10 | QUAD=HARDESTY INFO. FOUND IN NSR. |
Completed | 1970-11-22 | QUAD=HARDESTY INFO. FOUND IN NSR. |
Reached Total Depth | 1970-11-22 | QUAD=HARDESTY INFO. FOUND IN NSR. |
CO | 1992-12-09 | 3243 OHIO PRODUCTION CORP GeoDate 11/9/70 |
Change of Owner | 1998-03-10 | Operator changed from 3243, OHIO PRODUCTION CORP to 6091, OHIO ENERGY ASSETS, INC. |
APP | 2013-07-29 | Proposed Formations:CLINTON-MEDINA, Issued Date:7/29/2013, Expired Date:7/29/2015 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class: |
Plugged/Abandoned | 2013-09-25 | QUAD=HARDESTY INFO. FOUND IN NSR. |
Construction Permit Expires | 2015-07-29 | QUAD=HARDESTY INFO. FOUND IN NSR. |
Record Last Modified | 2017-02-10 | QUAD=HARDESTY INFO. FOUND IN NSR. |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4742 | 4752 | 0 |
2006-09-11 | 4752 | 4778 | 0 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2048 Bbl | 60000 | NSR |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0103353249 | 2013-10-24 | Plug / Plug Back | No Violations | Site does not yet meet final restoration requirements. Operator has graded entire location and access road. Power lines are still up and there are a few production lines still laying on the ground. Donny said all they have left to do is seed the location. I will return in a month to monitor the progress. |
0181339404 | 2013-09-25 | Plug / Plug Back | No Violations | The surface plug had dropped down 100. I was on location to witness Cemenco top off the well with 30 sacks of Class A cement. Cement remained at the surface. |
0239762463 | 2013-09-19 | Plug / Plug Back | No Violations | I arrived on location with Cemenco to witness the bottom hole plug job. The bottom of the tubing was set at 4795 and a 400 cement plug was set from 4395-4795. There was good circulation with oil coming up the annulus most likely from a hole somewhere in the 4.5. Knox Energy will pull the rest of the tubing from the hole then come back tomorrow to try and rip pipe starting somewhere around 3500. |
0301183717 | 2013-05-06 | Production Wells | Violations Noted | Upon inspection, well was find idle at location. The well was recently equipped with a reducer swedge and a bull plug. At the access road the separator and meter box are disconnected. The well was shared with #4338 and there are three 100 barrel tanks and one 1500 gallon tank in the dike. Operator must post ID and make well capable of production within 60 days; or plugging is required in 60 days. I talked with John Melville, the field manager, and he said they plan on plugging the well and will get the plugging permit to the state in the next 30 days. |
0879886066 | 2015-11-02 | Final Restoration | No Violations | On my inspection today I found this well to be in compliance with 1509.072(B). All equipment has been removed from the site and vegetation has been restored to the site. |
1042837349 | 2003-01-17 | Production Wells | No Violations | Well is producing,no violations noted this inspection
No GPS readings,bad day weather conditions poor. |
1220161767 | 2013-05-07 | Administrative Inspection | No Violations | I talked with Joe Melville and he stated that they will either patch the casing, plug the well, or give the well to PDC. Either way, they will have the issue resolved in a month. |
1304858616 | 2014-06-09 | Final Restoration | No Violations | There is no evidence of production equipment left behind and the land was properly restored. The location has met all 1509.072B restoration requirements. |
1380032061 | 2013-09-23 | Plug / Plug Back | No Violations | Knox Energy single pole rig was plugging well. They had 4.5casing ripped off and ran tubing of 2.375upset to 2591. We set a Lime plug at 2591-2291. The Berea plug was set at 1478-1290. The Bottom of the surface plug was set at 673-473. The surface plug was at 200-0. Formation ran total of 125 sacks of class A cement at 2%gel and 125 sacks of cement at 1%gel cement. All plugs circulated. |
1670767744 | 2014-05-15 | Plug / Plug Back | No Violations | Site does not yet meet final restoration requirements. Operator has graded entire location and access road. Power lines are still up and there are a few production lines still laying on the ground. The access road has some grassy areas but still needs a lot of work. I talked with Joe Melville and he will contact Donny with Knox Energy. |
2056977507 | 2013-07-11 | Production Wells | No Violations | Compliance Action Follow-up -301183717: There have been no resolution to any of the issues. 7/12/2013: I talked with Joe Melville and he stated he will be coming down next week. PDC did not want this well so they are going to file for a permit to plug. He already has Knox Energy lined up with a plan to plug the well sometime in August. 8/28/2013: I have received the permit to plug this well. |
Inspection ID | Violation ID | Violation Date | Violation Code | Violation Comments |
---|---|---|---|---|
0301183717 | US-OH-123125 | 2014-01-28 | Well shall be plugged | |
0301183717 | US-OH-123126 | 2014-01-28 | Nonproduction; well shall be plugged or placed in temporary inactive status |
For data sources see[9]