X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-01125

Well Details

Well ID: 37-125-01125
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Blaine Township
Operator Name: DALLAS ENERGY LLC
Well Pad ID:
Farm/Lease Name: CAMPSEY-MCCLAIN 1
License Status: Active
Spud Date: 1800-01-01
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.144361
Longitude: -80.404806

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 PENNZOIL PROD CO 0.00 0 396.00 304 0.00 0
1993 0.00 0 0.00 0 0.00 0
1996 0.00 0 0.00 0 0.00 0
1997 0.00 0 0.00 0 0.00 0
1998 0.00 0 0.00 0 0.00 0
1999 0.00 0 0.00 0 0.00 0
2000 0.00 0 0.00 0 0.00 0
2001 0.00 0 0.00 0 0.00 0
2002 0.00 0 0.00 0 0.00 0
2003 0.00 0 0.00 0 0.00 0
2005 0.00 0 0.00 0 0.00 0
2006 0.00 0 0.00 0 0.00 0
2007 0.00 0 0.00 0 0.00 0
2008 0.00 0 0.00 0 0.00 0
2010 0.00 0 0.00 0 0.00 0
2011 0.00 0 0.00 0 0.00 0
2012 0.00 0 0.00 0 0.00 0
2013 0.00 0 0.00 0 0.00 0
2014 0.00 0 0.00 0 0.00 0
2015 0.00 0 0.00 0 0.00 0
2016 0.00 0 0.00 0 0.00 0
2017 0.00 0 0.00 0 0.00 0
2018 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2017-A00 Basic Sediment (in Barrels) RWC 807 7.42 Bbl LANDFILL 100172

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2655615 Primary Facility 2017-11-01 Plugging(Includes Plugged/Mined Through) In Compliance with Schedule ConServ has rig over well and rigged up. Finishing mobilization of equipment onto site.
2658394 Primary Facility 2017-11-08 Plugging(Includes Plugged/Mined Through) In Compliance with Policy ConServ waiting on wireline truck to run freepoint on tubing.
2659105 Primary Facility 2017-11-09 Plugging(Includes Plugged/Mined Through) In Compliance with Policy ConServ rig TIH with tubing to spot bottom hole cement plug. Cement trucks on location.
750892 Primary Facility 1988-05-25 Routine/Complete Inspection No Violations Noted E&S OK; TANK
750893 Primary Facility 1989-01-26 Routine/Complete Inspection No Violations Noted E&S OK; TANK

For data sources see[6]

References