If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-115-22736 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.616682871,"lon":-81.86126368,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Morgan | |
Municipality: Malta Township | |
Operator Name: TITAN ENERGY CORP | |
Well Pad ID: | |
Farm/Lease Name: SEES RUSSELL | |
License Status: Final Restoration | |
License Date: 1994-04-05 | |
Spud Date: 1982-05-24 | |
Spud Drilling Contractor: | |
Final Drill Date: 1982-05-30 | |
Well Total Depth: 4948 ft | |
Configuration: Vertical | |
Latitude: 39.616682871 | |
Longitude: -81.86126368 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1981-12-31 | 54 TITAN ENERGY CORP GeoDate 12/31/81 |
Original Spud | 1982-05-24 | |
Completed | 1982-05-30 | |
Reached Total Depth | 1982-05-30 | |
CO | 1994-04-05 | 54 TITAN ENERGY CORP GeoDate 4/5/94 |
COMBINATION WELL | 1994-04-05 | Issued Date 4/5/94 Expired Date 4/5/95 Proposed Purpose OG Was Plug Supervised N Who Superivsed BY CO.Plug and Abandon Date 4/25/94 |
Plugged/Abandoned | 1994-04-25 | |
Construction Permit Expires | 1995-04-05 | |
Record Last Modified | 2013-03-14 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2006-09-11 | 4888 | 4892 | 5 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 31400 Gal | 28000 |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | FUTURE ENERGY CORP | 1118 | 10 | 365 |
1994 | TITAN ENERGY CORP | 0 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1987 | FUTURE ENERGY CORP | Brine | 0 | 365 |
1994 | TITAN ENERGY CORP | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
iDIAN00341 | 2000-01-19 | Final Restoration | No Violations |
For data sources see[9]