X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-01603

Well Details

Well ID: 37-125-01603
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Carroll Township
Operator Name: DEVELOPED RESOURCES INC
Well Pad ID:
Farm/Lease Name: PITTSBURGH CONSOL COAL 2
License Status: Active
Spud Date: 1800-01-01
Permit Date:
Unconventional Well: N
Configuration: Vertical Well
Latitude: 40.214250
Longitude: -79.9695

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
1991 AGOSTONI JOSEPH 3.00 365 0.00 0 0.00 0
2000 DEVELOPED RESOURCES INC 1,924.00 365 0.00 0 0.00 0
2001 DEVELOPED RESOURCES INC 1,800.00 365 0.00 0 0.00 0
2002 DEVELOPED RESOURCES INC 1,424.00 365 0.00 0 0.00 0
2003 DEVELOPED RESOURCES INC 1,020.00 365 0.00 0 0.00 0
2004 DEVELOPED RESOURCES INC 900.00 365 0.00 0 0.00 0
2015 DEVELOPED RESOURCES INC 3,600.00 365 0.00 0 0.00 0
2016 DEVELOPED RESOURCES INC 2,608.00 365 0.00 0 0.00 0
2017 DEVELOPED RESOURCES INC 2,025.00 365 0.00 0 0.00 0
2018 DEVELOPED RESOURCES INC 1,619.00 365 0.00 0 0.00 0

For data sources see[4]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2346422 Primary Facility 2015-02-25 Follow-up Inspection No Violations Noted Follow–up to stray gas issues at residence 286 Courtney Hill Rd. The operator is sampling well (125-01603) as Department Regulations require. Waiting on sample results in near future. We walked the area of People Gas Line to discover a line leak.
2369734 Primary Facility 2015-05-04 Drilling/Alteration No Violations Noted Follow–up to requirements set up by ( Depatrment ). Test the outside of Prod. Casing with 3- holes 24" deep ( No Pressure).Rock pressure in 24 Hrs. period is 88 psi. Pressure test flow from well to meter station @ 25 psi for 30 min. NO LINE LOSS.

For data sources see[5]

References