X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

37-125-28615

Well Details

Well ID: 37-125-28615
Loading map...
Country: United States
State: Pennsylvania
County: Washington
Municipality: Chartiers Township
Operator Name: RANGE RESOURCES APPALACHIA LLC
Well Pad ID: 148874
Farm/Lease Name: MELE UNIT 7H
License Status: Active
Spud Date: 2018-11-30
Permit Date: 2018-10-22
Unconventional Well: Y
Configuration: Horizontal Well
Latitude: 40.250961
Longitude: -80.295044

For data sources see[1][2][3]

Production Data

Period Operator Name Gas Quantity (mcf) Gas Production Days Oil Quantity (bbl) Oil Production Days Water Quantity (bbl) Water Production Days
2019 RANGE RESOURCES APPALACHIA LLC 0.00 0 0.00 0 0.00 0

For data sources see[4]

Waste Data

Period Waste Type Quantity Disposal Method Waste Facility ID
2018-M12 Drill Cuttings (in Tons) RWC 810 74.27 Tons LANDFILL 06-08438
2018-M12 Drill Cuttings (in Tons) RWC 810 216.46 Tons LANDFILL 100172
2018-M12 Drilling Fluid Waste (in Barrels) RWC 803 150.00 Bbl REUSE (AT WELL PAD)
2018-M12 Other Oil & Gas Wastes (in Barrels) RWC 899 467.88 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-M01 Drill Cuttings (in Tons) RWC 810 22.49 Tons LANDFILL 06-08438
2019-M01 Drill Cuttings (in Tons) RWC 810 489.46 Tons LANDFILL 100172
2019-M01 Drilling Fluid Waste (in Barrels) RWC 803 75.00 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-M01 Drilling Fluid Waste (in Barrels) RWC 803 345.00 Bbl REUSE (AT WELL PAD)
2019-M01 Drilling Fluid Waste (in Tons) RWC 803 0.04 Tons LANDFILL 100172
2019-M01 Drilling Fluid Waste (in Tons) RWC 803 12.92 Tons RESIDUAL WASTE TRANSFER FACILITY 101532
2019-M01 Other Oil & Gas Wastes (in Barrels) RWC 899 142.29 Bbl RESIDUAL WASTE PROCESSING FACILITY WMGR123SW019
2019-M01 Synthetic Liner Materials (in Tons) RWC 806 3.83 Tons LANDFILL 100172
2019-M02 Drill Cuttings (in Tons) RWC 810 20.41 Tons LANDFILL 100172
2019-M02 Drilling Fluid Waste (in Tons) RWC 803 30.28 Tons CENTRALIZED TREATMENT PLANT FOR RECYCLE 2014-181
2019-M02 Drilling Fluid Waste (in Tons) RWC 803 0.03 Tons RESIDUAL WASTE PROCESSING FACILITY 301280

For data sources see[5]

Inspection Data

Inspections Performed

Inspection ID Inspection Category Inspection Date Inspection Type Inspection Result Inspection Comments
2810644 Primary Facility 2018-12-05 Drilling/Alteration No Violations Noted Lightning Energy auger rig drilled a 30" well bore to 40 ft. and set 26" conductor casing at that depth on 11/29/18.
2834452 Primary Facility 2019-02-01 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #288 moved onto this well on 1/15/19 and resumed drilling at 5596ft. MD KB on 1/28/19. KOP was at 5396 ft. (with air rig). EOB was at 7685 ft. MD (6492 ft. TVD). TD was at 11,947 ft. MD (6525 ft. TVD) on 1/30/19. The 5 1/2" casing was set at 11,932 ft. Currently preparing to circulate prior to cementing casing.
2841571 Primary Facility 2019-02-19 Drilling/Alteration No Violations Noted Patterson-UTI Drilling Rig #288 moved onto this well on 1/14/19 and resumed drilling at 5596 ft. MD KB on 1/28/19. KOP was at 5324 ft. (with air rig). EOB was at 7685 ft. MD. (6492 ft. TVD). TD was at 11,947 ft. MD (6525 ft. TVD) on 1/30/19. The 5 1/2" casing was set at 11,932 ft. Estimated TOC at 4341 ft.
2856034 Primary Facility 2019-03-20 Routine/Complete Inspection No Violations Noted Well drilled and awaiting stimulation.

Well permit on site. PPC plan and ER plan on site. Act 9 site ID sign located a entrance. Waste control and disosal plan on site.

Equipment onsite placed on secondary containment.

For data sources see[6]

References