If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-083-24518 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.497723283,"lon":-82.42064645,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Knox | |
Municipality: Pike Township | |
Operator Name: BI JOE DEVELOPMENT INC | |
Well Pad ID: | |
Farm/Lease Name: TAYLOR TRUST | |
License Status: Producing | |
License Date: 2011-05-18 | |
Spud Date: 2011-06-18 | |
Spud Drilling Contractor: G & H DRLG | |
Final Drill Date: 2011-06-25 | |
Well Total Depth: 4690 ft | |
Configuration: Vertical | |
Latitude: 40.497723283 | |
Longitude: -82.42064645 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-05-18 | Proposed Formations:BEREA THRU TREMPEALEAU, Issued Date:5/18/2011, Expired Date:5/17/2013 12:00:00 PM, Drilling unit acres:40, Proposed Well Type:OG, Proposed Well Class:EOUT |
Reached Total Depth | 2011-06-25 | |
Completion Report Received | 2011-10-06 | |
Construction Permit Expires | 2013-05-17 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2011-12-12 | 4510 | 4564 | 36 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2011-07-19 | ACID | 15 | 3000 Gal | 0 | Producers Service Corporation |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
0 | 0 | 0 | ||
2011 | BI JOE DEVELOPMENT INC | 7612 | 3513 | 156 |
2012 | BI JOE DEVELOPMENT INC | 23067 | 7981 | 366 |
2013 | BI JOE DEVELOPMENT INC | 15059 | 7639 | 365 |
2014 | BI JOE DEVELOPMENT INC | 12474 | 7129 | 365 |
2015 | BI JOE DEVELOPMENT INC | 10580 | 6131 | 365 |
2016 | BI JOE DEVELOPMENT INC | 10941 | 5602 | 365 |
2017 | BI JOE DEVELOPMENT INC | 12361 | 5051 | 365 |
2018 | BI JOE DEVELOPMENT INC | 14082 | 4884 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2011 | BI JOE DEVELOPMENT INC | Brine | 75 | 156 |
2012 | BI JOE DEVELOPMENT INC | Brine | 35 | 366 |
2013 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2014 | BI JOE DEVELOPMENT INC | Brine | 210 | 365 |
2015 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2016 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2017 | BI JOE DEVELOPMENT INC | Brine | 0 | 365 |
2018 | BI JOE DEVELOPMENT INC | Brine | 35 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0696233672 | 2013-04-10 | Preliminary Restoration | No Violations | This well is a producing well. |
1308579962 | 2011-06-19 | Drill / Deepen / Reopen | No Violations | I inspected the well location shortly after the surface cement job had taken place. There was evidence around the surface casing that there had been good cement returns to the surface. The drilling rig hands installed a blow line and completed a BOP test. The test pressure was 360psi and held for 20 minutes with no loss. After the test, drilling commenced. There was approximately 40 feet of cement left in the hole. The pits are properly lined and retaining fluids. There are no violations noted this date. |
1541417331 | 2011-06-20 | Drill / Deepen / Reopen | No Violations | G&H Drilling rig on location and drilling this new well. They are currently drilling on air and at a depth of 1600 feet. No violations noted this date. |
For data sources see[9]