If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-105-23685 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.135942839,"lon":-81.90105093,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Meigs | |
Municipality: Orange Township | |
Operator Name: RAINBOW OIL & GAS | |
Well Pad ID: | |
Farm/Lease Name: THOMPSON | |
License Status: Producing | |
License Date: 2011-10-07 | |
Spud Date: 2011-11-12 | |
Spud Drilling Contractor: RAINBOW DRLG | |
Final Drill Date: 2012-02-18 | |
Well Total Depth: 1999 ft | |
Configuration: Vertical | |
Latitude: 39.135942839 | |
Longitude: -81.90105093 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2011-10-07 | Proposed Formations:BEREA, Issued Date:10/7/2011, Expired Date:10/6/2013 12:00:00 PM, Drilling unit acres:10, Proposed Well Type:AD, Proposed Well Class:POOL |
Reached Total Depth | 2012-02-18
-- | |
Completion Report Received | 2013-09-13
-- | |
Construction Permit Expires | 2013-10-06
-- | |
Last Compliance Report | 2017-10-13
-- | |
Record Last Modified | 2017-10-13
-- |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2012-02-08 | H2O | 0 | 48457 Gal | 16500 | Universal Well Services Inc. | Berea shot from 1848-1864 with 16 shots. Gantz shot from 1934-1939 with 5 shots. |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | RAINBOW OIL & GAS | 0 | 300 | 150 |
2013 | RAINBOW OIL & GAS | 0 | 972 | 365 |
2015 | RAINBOW OIL & GAS | 585 | 440 | 365 |
2017 | RAINBOW OIL & GAS | 2053 | 697 | 300 |
2018 | RAINBOW OIL & GAS | 698 | 468 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2012 | RAINBOW OIL & GAS | Brine | 450 | 150 |
2013 | RAINBOW OIL & GAS | Brine | 1500 | 365 |
2015 | RAINBOW OIL & GAS | Brine | 511 | 365 |
2017 | RAINBOW OIL & GAS | Brine | 1479 | 300 |
2018 | RAINBOW OIL & GAS | Brine | 1019 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0102647935 | 2016-11-13 | Annular Disposal | No Violations | I arrived at the well site and Jeff was blowing down the well. Jeff blew the well down to about 270 then built the pressure back up with the nitrogen to 320 on his gauge. I put my gauge in and opened the valve and the pressure was approximately 326 pounds of pressure per square inch. I had already looked at the UIC tab in RBDMS and the required test pressure was 300 pounds. I started the test at approximately 1:25 pm. I took a picture at 1:30 pm trying to capture the psi. because of my angle the picture looked a little shy of 326 psi. I took another picture at the completion of the test around 2:26 pm showing 324 psi. I told Jeff the test was succesful the well only lost 2 psi over the 60 min interval and that was less than 1 % so the well had passed. |
0450612319 | 2011-11-18 | Drill / Deepen / Reopen | No Violations | Drilling status check, tripping back into hole today. |
0667336592 | 2018-04-20 | Production Wells | No Violations | Mr. Jeff Burke asked me to come down and witness him running water into the annulus he uses for annular disposal. The well has been shut down for a couple days and he believes he can tell where the water table is based on how many barrels the annulus takes until it is full. The well has 4.5 inch production string and 640 feet of 7 inch casing. The annulus took 6.85 barrels to fill the annulus. 6.85 bbl. / .0208 bbl. per foot = 329.33 feet. This would estimate the water table for the annulus at 329.33 feet below the surface. |
0741809189 | 2011-12-07 | Drill / Deepen / Reopen | No Violations | Checking on dike and road status due to heavy rain recently. Dike holding water adequately and road has no significant erosion. No drilling today. |
0758437970 | 2016-11-14 | Annular Disposal | No Violations | On Monday while filling out the paperwork for the AD test I discovered several inconsistencies with the information in RBDMS. According to our records with the formula provided the well should have been tested at 327.12 psi. although the records indicated that at least 300 psi was required. I then called inspector Jon Scott to explain the situation. After talking with Jon and looking at the discrepancies he decided to call Columbus. Jon called me back and explained that the test would have to be performed again above 327.12 to be successful. I then called Jeff Burke and explained the situation. He said it would be a couple weeks before he could test again. |
0771209798 | 2012-01-27 | Drill / Deepen / Reopen | No Violations | They are set up to run 4.5 production casing today, but no one is currently on the site. |
0864231984 | 2012-01-18 | Drill / Deepen / Reopen | No Violations | Currently drilling at 1952. They plan to log this well early next week. |
0895631295 | 2012-01-03 | Drill / Deepen / Reopen | No Violations | The rig is not currently drilling. The pit is in good repair. |
0909643031 | 2017-09-25 | Production Wells | No Violations | Well is equipped with a pumpping unit, tubing, rods and an electric motor. This well is connected and set up for annular disposal. |
0913546170 | 2012-02-10 | Drill / Deepen / Reopen | No Violations | They are running tubing today. |
0935584401 | 2012-05-11 | Preliminary Restoration | No Violations | Pits have been filled, area has been graded, vegetative cover is established, and no drilling equipment remains on site. |
1082543503 | 2012-06-25 | Production Wells | No Violations | No violations. |
1229387714 | 2011-11-29 | Drill / Deepen / Reopen | No Violations | Not currently drilling. Pit holding water acceptably. |
1319036532 | 2011-10-11 | Drill / Deepen / Reopen | No Violations | Location built, pits dug and filled with water for drilling. Not spudded. Linner looks good. |
1319136463 | 2011-10-20 | Drill / Deepen / Reopen | No Violations | Checking open drill pits because of recent rains. No sign of pit running over, still retains integrity. |
1320776016 | 2011-11-08 | Drill / Deepen / Reopen | No Violations | 640 feet of new 20 lb 7 inch surface casing cemented in to 680 feet of 8 3/4 inch wellbore with 163 sacks of class A, 500 lb gel, 350 lb accelerator, 80 lb LCM, with 100% excess. Circulation established with good cement returns staying at surface. |
1321364081 | 2011-11-14 | Annular Disposal | No Violations | Annular Disposal Mechanical Integrity Test (fresh water test) with Jon Scott. Annulus pressured up to 360 psi, 327.12 minimum pressure required. No more than 18 psi loss acceptable to pass. Over the 15 minutes a loss of 12 psi was noted. Test passed. |
1321477625 | 2011-11-14 | Annular Disposal | No Violations | Annular Disposal Mechanical Integrity Test (Fresh Water Test) 640 feet of 7 casing cemented with 163 sks. Test pressure 327psi. Tested at 360 psi for 15 minutes. After 15 minutes pressure at 348 psi. Test passed. |
1325260641 | 2011-12-30 | Drill / Deepen / Reopen | No Violations | The rig is currently drilling at 1300. They will be pulling out of hole today to replace bit and they will begin drilling again on Monday. |
1410365825 | 2014-09-10 | Annular Disposal | No Violations | Checked the status of the annular disposal connections. The well is connected for annular disposal. The well is equipped with a with a pumping unit, tubing and rods. Two 100 barrel steel tanks are located upslope from the well. A mechanical separator is located with in the tank dike. A 2 black plastic line is connected to a manifold with multiple valves, that connects to both tank drains. The black plastic line runs down the slope to a 1000 gallon poly tank located next to the wellhead. The poly tank drain is connected to the annulus. |
1414156035 | 2011-10-28 | Drill / Deepen / Reopen | No Violations | Drilling inspection. Rigged up, not spudded yet. Pit holding water sufficiently. |
1453713157 | 2011-11-23 | Drill / Deepen / Reopen | No Violations | Not drilling today. |
1481033088 | 2016-11-11 | Annular Disposal | No Violations | Jeff Burke called me on Veterans Day to say he was going to preform the 5 yr Annular Disposal test later that afternoon. I explained that it was a holiday and I was not able to witness the test. Jeff then said that the test was due on Monday. I explained that I was not able to do it Monday because I had a meeting in Zanesville. I told him I would be able to do it on Sunday. He said that would work and we arranged to do the test at about 1pm. |
1494268045 | 2017-04-10 | Annular Disposal | No Violations | On my inspection today, I am accompanied by inspector Fulk. Our inspection revealed production oil and gas well with pumping unit with electric motor, and horizontal separator. Tank battery equipped with 1-40 barrel plastic tank. |
1495466022 | 2012-02-07 | Drill / Deepen / Reopen | No Violations | I witnessed the perforation job. The Gantz was perforated from 1934-1939 with 5 shots and the Berea was perforated from 1848-1864 with 18 shots. |
1599463482 | 2011-11-04 | Drill / Deepen / Reopen | No Violations | Drilling inspection. Rotary on fluid. Spud Tuesday November 1st. Currently at 462 feet with 8 3/4 inch bit. Pit looks good. |
1673497657 | 2012-02-17 | Production Wells | No Violations | The tubing has been set and they are running rods today. |
1697245287 | 2011-12-21 | Drill / Deepen / Reopen | No Violations | 1089 feet now, Injun sand has started to make water. Pit holding up well. |
2026471874 | 2011-10-17 | Drill / Deepen / Reopen | No Violations | Not spudded yet. |
2078126572 | 2012-04-27 | Preliminary Restoration | No Violations | Pits have been closed for 2 month restoration requirements. |
2085603097 | 2012-02-02 | Administrative Inspection | No Violations | Jeff Burke of Rainbow Oil & Gas stopped and talked to me about the status of the well. He has the longstring cement job scheduled for Friday evening and the perforation job scheduled for Tuesday. The Frac job is scheduled for Wednesday of next week. |
For data sources see[8]