If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-119-27160 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":39.814214636,"lon":-82.05244769,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Muskingum | |
Municipality: Clay Township | |
Operator Name: VICTOR MCKENZIE DRILLING CO I | |
Well Pad ID: | |
Farm/Lease Name: MILLER TOM | |
License Status: Producing | |
License Date: 1984-09-12 | |
Spud Date: 1984-09-17 | |
Spud Drilling Contractor: CO TOOLS | |
Final Drill Date: 1984-10-21 | |
Well Total Depth: 3762 ft | |
Configuration: Vertical | |
Latitude: 39.814214636 | |
Longitude: -82.05244769 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
CO | 1984-09-12 | 281 McKENZIE VICTOR DRILL INC GeoDate 9/12/84 |
Oil and Gas | 1984-09-12 | Issued Date 9/12/84 Expired Date 3/11/85 Acres 0020000 Tool Type CT Proposed Formation CLINTON Proposed Depth 03762 Proposed Drill Depth 03762 |
Original Spud | 1984-10-16 | IP. 20 MCFG & 2 1/2 BO |
Completed | 1984-10-21 | IP. 20 MCFG & 2 1/2 BO |
Reached Total Depth | 1984-10-21 | IP. 20 MCFG & 2 1/2 BO |
Completion Report Received | 1984-10-25 | IP. 20 MCFG & 2 1/2 BO |
Construction Permit Expires | 1985-03-11 | IP. 20 MCFG & 2 1/2 BO |
Record Last Modified | 2017-02-15 | IP. 20 MCFG & 2 1/2 BO |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 3680 | 3724 | 0 |
2006-09-11 | 3682 | 3723 | 2 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 2400 Bbl | 0 | FRAC: H2O,SAND |
For data sources see[4]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | VICTOR MCKENZIE DRILLING CO I | 8962 | 756 | 365 |
1991 | VICTOR MCKENZIE DRILLING CO I | 1432 | 90 | 365 |
2002 | VICTOR MCKENZIE DRILLING CO I | 0 | 65 | 180 |
2004 | VICTOR MCKENZIE DRILLING CO I | 575 | 35 | 352 |
2005 | VICTOR MCKENZIE DRILLING CO I | 1503 | 29 | 180 |
2006 | VICTOR MCKENZIE DRILLING CO I | 995 | 0 | 352 |
2008 | VICTOR MCKENZIE DRILLING CO I | 241 | 58 | 365 |
2009 | VICTOR MCKENZIE DRILLING CO I | 0 | 53 | 365 |
2010 | VICTOR MCKENZIE DRILLING CO I | 182 | 0 | 365 |
2011 | VICTOR MCKENZIE DRILLING CO I | 30 | 0 | 365 |
2012 | VICTOR MCKENZIE DRILLING CO I | 30 | 0 | 366 |
2013 | VICTOR MCKENZIE DRILLING CO I | 738 | 0 | 365 |
2014 | VICTOR MCKENZIE DRILLING CO I | 377 | 0 | 365 |
2015 | VICTOR MCKENZIE DRILLING CO I | 228 | 0 | 365 |
2016 | VICTOR MCKENZIE DRILLING CO I | 228 | 0 | 365 |
2017 | VICTOR MCKENZIE DRILLING CO I | 0 | 0 | 365 |
2018 | VICTOR MCKENZIE DRILLING CO I | 315 | 0 | 365 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
1985 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
1991 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2002 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 180 |
2004 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 352 |
2005 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 180 |
2006 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 352 |
2008 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2009 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2010 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2011 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2012 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 366 |
2013 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2014 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2015 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2016 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2017 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
2018 | VICTOR MCKENZIE DRILLING CO I | Brine | 0 | 365 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0000PL8115 | Preliminary Restoration | No Violations | Preliminary Restoration done information from Data Point | |
1334157612 | 2012-04-09 | Production Wells | No Violations | Inspected well and no violations noted. The pumper was notified about attaching the electric lines back on a pole. |
1455891732 | 2007-03-19 | Production Wells | No Violations | not producing |
For data sources see[9]