If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-20644 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.205259817,"lon":-81.15966479,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Moorefield Township | |
Operator Name: RHDK OIL & GAS LLC/DBA RED HIL | |
Well Pad ID: | |
Farm/Lease Name: BINTZ DALE | |
License Status: Producing | |
License Date: 1983-09-30 | |
Spud Date: 1983-10-13 | |
Spud Drilling Contractor: CUBBY DRLG | |
Final Drill Date: 1983-10-20 | |
Well Total Depth: 6510 ft | |
Configuration: Vertical | |
Latitude: 40.205259817 | |
Longitude: -81.15966479 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
Oil and Gas | 1983-09-30 | Issued Date 9/30/83 Expired Date 3/28/84 Acres 0057800 Tool Type RTAF Proposed Formation CLINTON Proposed Depth 06510 Proposed Drill Depth 06510 |
Original Spud | 1983-10-14 | WELL CARD DATA
PI 10/1/83; COMMENCED 10/14/83 S/OIL |
Completed | 1983-10-20 | WELL CARD DATA
PI 10/1/83; COMMENCED 10/14/83 S/OIL |
Reached Total Depth | 1983-10-20 | WELL CARD DATA
PI 10/1/83; COMMENCED 10/14/83 S/OIL |
CO | 1984-03-14 | 168 RED HILL DEVELOPMENT GeoDate 9/30/83 |
Construction Permit Expires | 1984-03-28 | WELL CARD DATA
PI 10/1/83; COMMENCED 10/14/83 S/OIL |
Completion Report Received | 1984-05-11 | WELL CARD DATA
PI 10/1/83; COMMENCED 10/14/83 S/OIL |
Plugging Plan Approved | 1998-02-21 | WELL CARD DATA
PI 10/1/83; COMMENCED 10/14/83 S/OIL |
Record Last Modified | 2017-10-19 | WELL CARD DATA
PI 10/1/83; COMMENCED 10/14/83 S/OIL |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
1997-06-29 | 6242 | 6318 | 7 |
For data sources see[3]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
H2O | 0 | 79720 GAL | 0 | FRAC:WATER-NO SAND |
For data sources see[4]
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
1403537623 | 2014-06-23 | Production Wells | No Violations | On the day of my inspection I found the well to be an 8 inch diameter wellhead, with a 2 inch diameter production string. It is operated with a plunger lift system. The well is producing and I did not detect any leakage. A 100 bbl tank and a horizontal sepator was located in an earthen dike. The tank was properly identified. |
1518474634 | 2017-09-20 | Production Wells | No Violations | On the day of my inspection I found this plunger lift well is equipped with 4.5 inch diameter casing, 2.375 inch diameter tubing, and motor valve. Production equipment includes a 100 barrel fiberglass tank, horizontal seperator with a meter box, 1.125 inch diameter sales line orfice, and a domestic gas meter, all contained in an earthen dike. Tank is labeled. Chart and production records both indicate that well is producing. |
For data sources see[9]