X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-067-20750

Well Details

Well ID: 34-067-20750
Loading map...
Country: United States
State: Ohio
County: Harrison
Municipality: Monroe Township
Operator Name: EVERFLOW EASTERN PTNS L P
Well Pad ID:
Farm/Lease Name: OLIVER
License Status: Producing
License Date: 1985-12-23
Spud Date: 1986-02-14
Spud Drilling Contractor: [[JL COATS [COATS-GOFF]]]
Final Drill Date: 1986-02-19
Well Total Depth: 5876 ft
Configuration: Vertical
Latitude: 40.412178323
Longitude: -81.24995619

For data sources see[1]

Well History

Well Status Well Status Date Comment
Oil and Gas 1985-12-23 Issued Date 12/23/85 Expired Date 12/23/86 Acres 0040194 Tool Type RTA Proposed Formation CLINTON Proposed Depth 05876 Proposed Drill Depth 05876
Original Spud 1986-02-14
Completed 1986-02-19
Reached Total Depth 1986-02-19
CO 1986-02-27 84 EVERFLOW EASTERN PTNS L P GeoDate 12/23/85
Completion Report Received 1986-03-18
Construction Permit Expires 1986-12-23
Record Last Modified 2017-02-15

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2006-09-11 5656 5709 25

For data sources see[3]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
H2O 0 101500 Gal 60000 FRAC;H2O,SAND

For data sources see[4]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
1986 EVERFLOW EASTERN PTNS L P 249 248 92
1987 EVERFLOW EASTERN PTNS L P 1349 1798 365
1988 EVERFLOW EASTERN PTNS L P 3691 3354 365
1989 EVERFLOW EASTERN PTNS L P 3556 2333 365
1991 EVERFLOW EASTERN PTNS L P 2538 1339 365
1992 EVERFLOW EASTERN PTNS L P 1995 1151 365
1993 EVERFLOW EASTERN PTNS L P 1598 886 365
1994 EVERFLOW EASTERN PTNS L P 1075 805 365
1995 EVERFLOW EASTERN PTNS L P 1017 731 365
1996 EVERFLOW EASTERN PTNS L P 774 665 365
1997 EVERFLOW EASTERN PTNS L P 1313 626 365
1998 EVERFLOW EASTERN PTNS L P 1149 434 365
1999 EVERFLOW EASTERN PTNS L P 870 419 365
2000 EVERFLOW EASTERN PTNS L P 1167 746 365
2001 EVERFLOW EASTERN PTNS L P 1170 645 365
2002 EVERFLOW EASTERN PTNS L P 1409 670 365
2003 EVERFLOW EASTERN PTNS L P 834 543 365
2004 EVERFLOW EASTERN PTNS L P 931 422 365
2005 EVERFLOW EASTERN PTNS L P 1129 317 365
2006 EVERFLOW EASTERN PTNS L P 890 339 365
2007 EVERFLOW EASTERN PTNS L P 1112 303 365
2008 EVERFLOW EASTERN PTNS L P 760 251 365
2009 EVERFLOW EASTERN PTNS L P 675 285 365
2010 EVERFLOW EASTERN PTNS L P 663 123 365
2011 EVERFLOW EASTERN PTNS L P 847 479 365
2012 EVERFLOW EASTERN PTNS L P 690 482 366
2013 EVERFLOW EASTERN PTNS L P 862 393 365
2014 EVERFLOW EASTERN PTNS L P 1036 335 365
2015 EVERFLOW EASTERN PTNS L P 677 230 365
2016 EVERFLOW EASTERN PTNS L P 713 180 365
2017 EVERFLOW EASTERN PTNS L P 878 135 365
2018 EVERFLOW EASTERN PTNS L P 794 412 365

For data sources see[5] [6]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
1986 EVERFLOW EASTERN PTNS L P Brine 160 92
1987 EVERFLOW EASTERN PTNS L P Brine 187 365
1988 EVERFLOW EASTERN PTNS L P Brine 852 365
1989 EVERFLOW EASTERN PTNS L P Brine 618 365
1991 EVERFLOW EASTERN PTNS L P Brine 385 365
1992 EVERFLOW EASTERN PTNS L P Brine 275 365
1993 EVERFLOW EASTERN PTNS L P Brine 280 365
1994 EVERFLOW EASTERN PTNS L P Brine 120 365
1995 EVERFLOW EASTERN PTNS L P Brine 120 365
1996 EVERFLOW EASTERN PTNS L P Brine 200 365
1997 EVERFLOW EASTERN PTNS L P Brine 202 365
1998 EVERFLOW EASTERN PTNS L P Brine 120 365
1999 EVERFLOW EASTERN PTNS L P Brine 111 365
2000 EVERFLOW EASTERN PTNS L P Brine 181 365
2001 EVERFLOW EASTERN PTNS L P Brine 119 365
2002 EVERFLOW EASTERN PTNS L P Brine 35 365
2003 EVERFLOW EASTERN PTNS L P Brine 146 365
2004 EVERFLOW EASTERN PTNS L P Brine 105 365
2005 EVERFLOW EASTERN PTNS L P Brine 97 365
2006 EVERFLOW EASTERN PTNS L P Brine 121 365
2007 EVERFLOW EASTERN PTNS L P Brine 121 365
2008 EVERFLOW EASTERN PTNS L P Brine 104 365
2009 EVERFLOW EASTERN PTNS L P Brine 71 365
2010 EVERFLOW EASTERN PTNS L P Brine 42 365
2011 EVERFLOW EASTERN PTNS L P Brine 77 365
2012 EVERFLOW EASTERN PTNS L P Brine 128 366
2013 EVERFLOW EASTERN PTNS L P Brine 112 365
2014 EVERFLOW EASTERN PTNS L P Brine 113 365
2015 EVERFLOW EASTERN PTNS L P Brine 98 365
2016 EVERFLOW EASTERN PTNS L P Brine 69 365
2017 EVERFLOW EASTERN PTNS L P Brine 62 365
2018 EVERFLOW EASTERN PTNS L P Brine 77 365

For data sources see[7] [8]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0209428502 2017-06-28 Production Wells No Violations On the day of my inspection, I witnessed well to be equipped with beam pumping unit equipped with electric motor, 4.5 inch diameter casing, and 2.375 inch diameter tubing. Vavles on tubing and casing both open, RBDMS shows production current. Wellhead had proper identification. Production equipment includes six 100 barrel steel oil tanks, one 210 barrel steel oil tank, seven horizontal seperators and shared 100 barrel steel brine tank all contained in earthen dikes. Earthen dikes include production equipment for permits 20745, 20744, 20746, 20750, 20752, 20753 and 20754. .25 inch diameter orfice on all sales lines. .25 inch diameter orfice on all sales lines.

For data sources see[9]

References