Well ID: 34-067-21031 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.292559215,"lon":-80.94768179,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Green Township | |
Operator Name: COAL GAS TRANSPORTATION LLC | |
Well Pad ID: | |
Farm/Lease Name: CBM OHIO | |
License Status: Plugged and Abandoned | |
License Date: 2015-12-07 | |
Spud Date: 2007-10-12 | |
Spud Drilling Contractor: G & L DRILLING | |
Final Drill Date: 2007-10-15 | |
Well Total Depth: 520 ft | |
Configuration: Vertical | |
Latitude: 40.292559215 | |
Longitude: -80.94768179 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2007-09-19 | Proposed Formations:LOWER FREEPORT 6A COAL, Issued Date:9/19/2007, Expired Date:9/18/2008 6:00:00 AM, Drilling unit acres:1, Proposed Well Type:CM, Proposed Well Class:POOL |
Completed | 2007-10-15 | GMM CHANGED TO PA STATUS PER PLUG REPORT |
Reached Total Depth | 2007-10-15 | GMM CHANGED TO PA STATUS PER PLUG REPORT |
Completion Report Received | 2008-02-05 | GMM CHANGED TO PA STATUS PER PLUG REPORT |
Change of Owner | 2008-12-29 | Operator changed from 5319, LAHD ENERGY INC to 8454, COAL GAS TRANSPORTATION LLC |
APP | 2015-12-07 | Proposed Formations:LOWER FREEPORT 6A COAL SEAM, Issued Date:12/7/2015, Expired Date:12/6/2017 12:00:00 PM, Drilling unit acres:1, Proposed Well Type:CM, Proposed Well Class: |
Plugged/Abandoned | 2016-03-28 | GMM CHANGED TO PA STATUS PER PLUG REPORT |
Construction Permit Expires | 2017-12-06 | GMM CHANGED TO PA STATUS PER PLUG REPORT |
Record Last Modified | 2019-06-05 | GMM CHANGED TO PA STATUS PER PLUG REPORT |
For data sources see[2]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
Not Treated | 0 | 0 | 0 | NOT PERFED OR TREATED |
For data sources see[3]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 31 |
2009 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 0 |
2010 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 0 |
2011 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 0 |
2012 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 0 |
2013 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 0 |
2014 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 0 |
2015 | COAL GAS TRANSPORTATION LLC | 0 | 0 | 0 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2008 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 31 |
2009 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2010 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2011 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2012 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2013 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2014 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
2015 | COAL GAS TRANSPORTATION LLC | Brine | 0 | 0 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0016544163 | 2008-01-29 | Production Wells | No Violations | Inspection revealed no violations at this time. Note: Coal Bed Methane well. |
0092913078 | 2017-04-26 | Final Restoration | No Violations | On the day of my inspection I was unable to locate a well at the given coordinates. Previous inspection reports indicate well was plugged in march 2016 and has a plugging report in RBDMS. A building remains onsite with 2 horizontal seperators and a meter inside. Final restoration cannot be approved until remaining equipment is removed and area is then vegetated. |
0499314264 | 2013-07-29 | Preliminary Restoration | No Violations | Everything passed according to 1509.072A. |
0523569905 | 2016-07-13 | Final Restoration | No Violations | On the day of my inspection the final restoration could not be passed due to the location still needs to be graded. |
0535791964 | 2016-03-29 | Plug / Plug Back | No Violations | I arrived on site accompanied by inspector Mark Moreland and witnessed that the cement (from the plug job performed on the previous day) had settled 10 feet below ground level. I then called Mark Clark to inform him that the hole would need to be filled back to surface before cutting the 7 inch diameter surface casing. Mark stated he planned to accomplish that task tomorrow. I will be back on site to witness the cutting of the surface casing. |
1253854974 | 2007-10-22 | Drill / Deepen / Reopen | No Violations | Inspection revealed that the drilling pits have been closed and the location has been final graded . No violations at this time. |
1459510786 | 2016-03-28 | Plug / Plug Back | No Violations | The rig ran 1-1/2 tubing and tagged the mechanical bridge plug set at 395. They pulled up to the first collat at 385. Cemenco Services cemented the well with 72 sacks of Class A cement. Good cement was returned to the surface. It dropped back ~ 10 when they pulled the tubing. Rigged down and movwed off. |
1623657258 | 2016-03-15 | Plug / Plug Back | No Violations | I am on site accompanied by Inspector Mark Moreland to check on the static test of the well bore. A bridge plug was place inside the 7 inch diameter casing the previous day, in preparation for plugging the well bore. After the bridge plug was set the hole was then filled with fresh water to test the integrity of the bridge plug. On the day of my inspection I found that the bridge plug held indicating that the well could then be filled to surface with cement. |
1751963887 | 2016-03-30 | Plug / Plug Back | No Violations | |
2122900246 | 2018-02-08 | Final Restoration | No Violations | On the day of my inspection I am performing a follow up to Chiefs Order 2017-414 issued on 10-31-17 for liability insurance. This well has been plugged but equipment remains on site and a final restoration cannot be passed. A building remains that was used to house compressors. All associated lines remain along with a meter box. |