If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 34-067-21122 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":40.344504999,"lon":-81.16983028,"icon":""}]} |
Country: United States | |
State: Ohio | |
County: Harrison | |
Municipality: Stock Township | |
Operator Name: CHESAPEAKE EXPLORATION LLC | |
Well Pad ID: US-OH-000579 | |
Farm/Lease Name: KIDD 21-12-6 | |
License Status: Producing | |
License Date: 2012-12-12 | |
Spud Date: 2013-05-03 | |
Spud Drilling Contractor: NOMAC DRILLING CORP | |
Final Drill Date: 2013-05-13 | |
Well Total Depth: 12441 ft | |
Configuration: Horizontal | |
Latitude: 40.344504999 | |
Longitude: -81.16983028 |
For data sources see[1]
Well Status | Well Status Date | Comment |
---|---|---|
APP | 2012-12-12 | Proposed Formations:POINT PLEASANT, Issued Date:12/12/2012, Expired Date:12/12/2014 12:00:00 PM, Drilling unit acres:119.35, Proposed Well Type:OG, Proposed Well Class:EDPW |
Reached Total Depth | 2013-05-13 | |
Correction to Well | 2013-09-27 | CHANGE IN SURFACE, TARGET & TAKE-POINT INFORMATON (FOOTAGES AND X,Y COORDINATES) FROM AS DRILLED SURVEY PLAT. UNIT SIZE DECREASED TO 107.93 ACRES. |
Completion Report Received | 2014-05-21 | |
Construction Permit Expires | 2014-12-12 | |
Record Last Modified | 2017-10-24 |
For data sources see[2]
Perforation Date | Interval Top (ft) | Interval Base (ft) | Number of Shots |
---|---|---|---|
2014-06-30 | 8319 | 12236 | 792 |
For data sources see[3]
Job Number | Job Start Date | Job End Date | True Vertical Depth (ft) | Total Water Volume (gal) | Total Non-Water Volume (gal) |
---|---|---|---|---|---|
1 | 08/23/2013 | 08/26/2013 | 7656 | 5,168,730.0 | 369223 |
Job Number | Trade Name | Supplier | Purpose | Ingredient Name | CAS Number | Additive Percentage by Mass | Job Percentage by Mass | Mass Used (lb) |
---|---|---|---|---|---|---|---|---|
1 | Fresh Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 80.829 | 0 |
Northern White Sand, 100 Mesh Sand
Acid Hydrochloric 15pct, L071 J580, J609, B244, L610, J475, B317, L058, A264, J218 |
SCHLUMBERGER | Proppant - Natural, Acid, KCl Substitute, Gelling Agent, Friction Reducer, Anti-Bacterial Agent, Cross Linker, Breaker, Scale Inhibitor, Iron Control Agent, Corrosion Inhibitor | Sodium sulfate | 7757-82-6 | 0.04 | 0.00514 | 0 | |
Glycerol | 56-81-5 | 0.01 | 0.00173 | 0 | ||||
Cholinium chloride | 67-48-1 | 0.52 | 0.06895 | 0 | ||||
Polypropylene glycol | 25322-69-4 | 0 | 0.00034 | 0 | ||||
Alcohols, C14-15, ethoxylated (7EO) | 68951-67-7 | 0 | 0.00017 | 0 | ||||
Alkenes, C>10 a- | 64743-02-8 | 0 | 0.00007000 | 0 | ||||
Methanol | 67-56-1 | 0 | 0.00059 | 0 | ||||
Non-crystalline silica | 7631-86-9 | 0 | 0.00029 | 0 | ||||
Thiourea, polymer with formaldehyde and 1-phenylethanone | 68527-49-1 | 0 | 0.00036 | 0 | ||||
Crystalline silica | 14808-60-7 | 97.29 | 12.858 | 0 | ||||
Ethanol, 2,2,2-nitrilotris-, 1,1,1-tris(dihydrogen phosphate), sodium salt | 68171-29-9 | 0.01 | 0.00189 | 0 | ||||
Sodium erythorbate | 6381-77-7 | 0.01 | 0.0008 | 0 | ||||
Prop-2-yn-1-ol | 107-19-7 | 0 | 0.00011 | 0 | ||||
Magnesium silicate hydrate (talc) | 14807-96-6 | 0 | 0.00001000 | 0 | ||||
Trisodium ortho phosphate | 7601-54-9 | 0.01 | 0.00083 | 0 | ||||
Siloxanes and Silicones, di-Me, reaction products with silica | 67762-90-7 | 0 | 0 | 0 | ||||
Potassium borate | 1332-77-0 | 0.04 | 0.00531 | 0 | ||||
Ethane-1,2-diol | 107-21-1 | 0 | 0.00024 | 0 | ||||
Diammonium peroxidisulphate | 7727-54-0 | 0.01 | 0.00157 | 0 | ||||
Acrylamide, 2-acrylamido-2-methylpropanesulfonic acid, sodium salt polymer | 38193-60-1 | 0.1 | 0.01258 | 0 | ||||
Octamethylcyclotetrasiloxane | 556-67-2 | 0 | 0 | 0 | ||||
Vinylidene chloride/methylacrylate copolymer | 25038-72-6 | 0 | 0.00023 | 0 | ||||
Dimethyl siloxanes and silicones | 63148-62-9 | 0 | 0.00001000 | 0 | ||||
Decamethyl cyclopentasiloxane | 541-02-6 | 0 | 0 | 0 | ||||
Hydrogen chloride | 7647-01-0 | 1.36 | 0.17948 | 0 | ||||
Dodecamethylcyclohexasiloxane | 540-97-6 | 0 | 0 | 0 | ||||
Urea | 57-13-6 | 0.01 | 0.00083 | 0 | ||||
Glutaraldehyde | 111-30-8 | 0.04 | 0.00532 | 0 | ||||
Sodium carbonate | 497-19-8 | 0.01 | 0.00103 | 0 | ||||
Polymer of 2-acrylamido-2-methylpropanesulfonic acid sodium salt and methyl acrylate | 136793-29-8 | 0.01 | 0.00135 | 0 | ||||
Fatty acids, tall-oil | 61790-12-3 | 0 | 0.00043 | 0 | ||||
Ammonium sulfate | 7783-20-2 | 0.09 | 0.01189 | 0 | ||||
Sodium hydroxide | 1310-73-2 | 0 | 0 | 0 | ||||
Guar gum | 9000-30-0 | 0.46 | 0.06076 | 0 | ||||
Potassium hydroxide | 1310-58-3 | 0.01 | 0.00196 | 0 | ||||
Tetrasodium ethylenediaminetetraacetate | 64-02-8 | 0 | 0.00003000 | 0 | ||||
poly(tetrafluoroethylene) | 9002-84-0 | 0 | 0 | 0 | ||||
Recycled Produced Water | CHESAPEAKE ENERGY | Carrier/Base Fluid | Water | 007732-18-5 | 100 | 5.96178 | 0 |
For data sources see[4]
Stimulation Date | Chemical Agent | Chemical Agent Concentration (%) | Fracking Fluid Volume | Mass of Proppant Used (lb) | Fracking Company | Comments |
---|---|---|---|---|---|---|
2013-08-26 | H2O | 15 | 5405 Bbl | 306720 | Superior Well Services | STAGE 22/22 |
2013-08-23 | H2O | 0 | 4801 Bbl | 299030 | Schlumberger | STAGE 1/22
STAGES 2-21 SEE IMAGES |
For data sources see[5]
Period | Operator Name | Gas Quantity (mcf) | Oil Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | 23527 | 4782 | 36 |
2014 | CHESAPEAKE EXPLORATION LLC | 253282 | 49901 | 308 |
2015 | CHESAPEAKE EXPLORATION LLC | 172967 | 22455 | 325 |
2016 | CHESAPEAKE EXPLORATION LLC | 107287 | 15746 | 364 |
2017 | CHESAPEAKE EXPLORATION LLC | 87929 | 11638 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | 73605 | 9260 | 363 |
2019 | CHESAPEAKE EXPLORATION LLC | 23889 | 2467 | 90 |
Period | Operator Name | Waste Type | Quantity (bbl) | Production Days |
---|---|---|---|---|
2013 | CHESAPEAKE EXPLORATION LLC | Brine | 2169 | 36 |
2014 | CHESAPEAKE EXPLORATION LLC | Brine | 5263 | 308 |
2015 | CHESAPEAKE EXPLORATION LLC | Brine | 2877 | 325 |
2016 | CHESAPEAKE EXPLORATION LLC | Brine | 1217 | 364 |
2017 | CHESAPEAKE EXPLORATION LLC | Brine | 927 | 365 |
2018 | CHESAPEAKE EXPLORATION LLC | Brine | 1142 | 363 |
2019 | CHESAPEAKE EXPLORATION LLC | Brine | 200 | 90 |
Inspection ID | Inspection Date | Inspection Type | Inspection Result | Inspection Comments |
---|---|---|---|---|
0132758265 | 2016-02-26 | Preliminary Restoration | No Violations | I arrived on location accompanied by inspector Mark Moreland, were I witnessed the lease road gate was locked and the lease road in adequate condition. The pad is fenced and all man doors were locked. The permitted well is producing off of natural reservoir pressure. RBDMS production records indicate that the well is in producing order.
The production equipment on the pad consists of the following: 8 400 bbl. Production tanks 2 Producing wells 2 Sand separators 2 Horizontal heater-treaters 1 Low pressure separator/ Vapor recovery system 1 Combustor The site passed preliminary restoration in accordance with ORC 1509.072 A. |
0542702701 | 2013-09-26 | Preliminary Restoration | No Violations | On the Day of my inspection the site passed preliminary restoration according to 1509.072A. |
0611839762 | 2015-11-05 | Production Wells | No Violations | Myself and Inspector Moreland are on site to visually inspect the left side of the down hill slope of the production pad that has been reconstructed. The slope was part of a slip that occurred after the well was in production. Today we found that the slope was properly reconstructed and established good vegetation cover. |
1366910811 | 2013-04-25 | Casing String Witnessed | No Violations | I am on site today to witness the running and the cmenting of the 20 inch diameter casing string. Precision Drilling has drilled a 26 inch diameter hole and set 120 ft of casing. O-Tex Cementing Service c/w 220 sks. Had cement returns to surface. |
1367835190 | 2013-05-06 | Casing String Witnessed | No Violations | I am on site today to witness the running and the cementing of the 9-5/8 inch diameter casing string. Nomac Drilling Rig # 70 drilled a 12-1/4 inch diameter hole to 1840 ft and set 1826 ft of casing. Schlumberger Cementing Service c/w 690 sks of class A @ 15.6 per lb and 1.2 yield. |
1452268545 | 2018-08-13 | Production Wells | No Violations | On the day of my inspection I witnessed this pad to contain two properly labeled producing wells. Surface and interediate annualr pressures are 0. Production records are current in RBDMS. Production equipment includes three 400 barrel steel produced water tanks, five 400 barrel steel condensate tanks, two sand separators, two GPUs, a compressor, and a combustor. Tanks are inside their own steel containment. |
For data sources see[10]