X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

34-111-24484

Well Details

Well ID: 34-111-24484
Loading map...
Country: United States
State: Ohio
County: Monroe
Municipality: Seneca Township
Operator Name: ANTERO RESOURCES CORPORATION
Well Pad ID: US-OH-000625
Farm/Lease Name: FRANKLIN UNIT
License Status: Producing
License Date: 2014-06-11
Spud Date: 2014-06-19
Spud Drilling Contractor: PATTERSON DRILLING
Final Drill Date: 2014-08-01
Well Total Depth: 16025 ft
Configuration: Horizontal
Latitude: 39.832792296
Longitude: -81.30234599

For data sources see[1]

Well History

Well Status Well Status Date Comment
APP 2014-06-11 Proposed Formations:POINT PLEASANT, Issued Date:6/11/2014, Expired Date:6/10/2016 12:00:00 PM, Drilling unit acres:572.952, Proposed Well Type:OG, Proposed Well Class:POOL
Reached Total Depth 2014-08-01
Correction to Well 2015-01-16 UPDATE TO SURFACE, TARGET AND TAKE-POINT INFORMATION (FOOTAGES AND COORDINATES) FROM AS DRILLED PLAT.
Completion Report Received 2015-04-20
Construction Permit Expires 2016-06-10
Record Last Modified 2017-10-24

For data sources see[2]

Perforation Treatments

Perforation Date Interval Top (ft) Interval Base (ft) Number of Shots
2015-04-20 8231 15969 0

For data sources see[3]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 09/07/2014 09/20/2014 8077 11,062,000.0 489302

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 K-BAC 1020 U.S. Well Services, LLC Anti-Bacterial Agent 2,2-dibromo-3-nitrilopropionamide 10222-01-2 20 0.00409 4190.47
Deionized Water 7732-18-5 28 0.00234 2393.58
AI-301 U.S. Well Services Acid Corrosion Inhibitors Polyethylene polyamine 68603-67-8 10 0.00002000 16.7968
Hydrogen Chloride 7647-01-0 10 0.00002000 19.3488
Diethylene Glycol 111-46-6 30 0.00005000 55.9948
Methenamine 100-97-0 20 0.00004000 44.3688
Coco amine 61791-14-8 5 0.00001000 7.6728
LGC-15 U.S. Well Services, LLC Gelling Agents Petroleum Distillates 64742-47-8 60 0.03659 37450.4
Guar Gum 9000-30-0 50 0.03864 39543.9
Suspending agent (solid) 14808-60-7 3 0.00591 6047.88
Surfactant 68439-51-0 3 0.00232 2372.63
SI-1000 U.S. Well Services, LLC Scale Inhibitor Ethylene Glycol 107-21-1 20 0.00383 3916.56
Water 7732-18-5 30 0.00319 3266.09
Anionic Copolymer Proprietary 0 0.00423 4332.87
Sand U.S. Well Services, LLC Proppant Crystalline Silica, quartz 14808-60-7 100 9.53661 9,759,590.0
AI-300 U.S. Well Services, LLC Acid Corrosion Inhibitors Tar bases, quinoline derivs, benzyl chloride-quaternized 72480-70-7 13 0.00004000 41.4706
Triethyl Phosphate 78-40-0 3 0.00001000 6.74915
Water 7732-18-5 20 0.00001000 14.2301
N,N-Dimethylformamide 68-12-2 15 0.00005000 47.9216
Ethoxylated Nonylphenol 68412-54-4 5 0.00001000 11.2486
Isopropyl Alcohol 67-63-0 3 0.00001000 5.36001
Cinnamaldehyde 104-55-2 5 0.00004000 42.0399
2-Butoxyethanol 111-76-2 7 0.00004000 36.6324
Ethylene Glycol 107-21-1 31 0.00015 155.041
HCL Acid (12.6%-18.0%) U.S. Well Services, LLC Bulk Acid Hydrogen Chloride 7647-01-1 18 0.02233 22855.8
Water 7732-18-5 87.5 0.0935 95683.9
WFRA-405 U.S. Well Services, LLC Friction Reducer Crystalline Salt 12125-02-9 5 0.00391 4001.95
Petroleum Distillates 64742-47-8 22 0.02518 25772.6
Anionic Polyacrylamide Proprietary 0 0.03128 32015.6
Ethoxylated alcohol blend Proprietary 5 0.00391 4001.95
Water 7732-18-5 40 0.03128 32015.6
Water Antero Resources Base Fluid Water 7732-18-5 100 90.1489 92,256,700.0
AP One U.S. Well Services, LLC Gel Breakers Ammonium Persulfate 7727-54-0 100 0.00141 1445

For data sources see[4]

Stimulations Data

Stimulation Date Chemical Agent Chemical Agent Concentration (%) Fracking Fluid Volume Mass of Proppant Used (lb) Fracking Company Comments
2014-09-16 H2O 0 0 0 US Well Services Inc 60 Perforations shot in 6 -10 shot bursts from 11,761' to 11,908' with a completion plug set at 11,923'.

For All Stages SEE IMAGES

For data sources see[5]

Production Data

Period Operator Name Gas Quantity (mcf) Oil Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION 575224 973 38
2015 ANTERO RESOURCES CORPORATION 2601387 665 365
2016 ANTERO RESOURCES CORPORATION 951635 107 363
2017 ANTERO RESOURCES CORPORATION 605716 118 365
2018 ANTERO RESOURCES CORPORATION 433875 153 365
2019 ANTERO RESOURCES CORPORATION 79772 105 77

For data sources see[6] [7]

Waste Data

Period Operator Name Waste Type Quantity (bbl) Production Days
2014 ANTERO RESOURCES CORPORATION Brine 9214 38
2015 ANTERO RESOURCES CORPORATION Brine 31702 365
2016 ANTERO RESOURCES CORPORATION Brine 8329 363
2017 ANTERO RESOURCES CORPORATION Brine 5858 365
2018 ANTERO RESOURCES CORPORATION Brine 4671 365
2019 ANTERO RESOURCES CORPORATION Brine 860 77

For data sources see[8] [9]

Inspection Data

Inspections Performed

Inspection ID Inspection Date Inspection Type Inspection Result Inspection Comments
0175172316 2015-06-17 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well location has proper erosion control and vegetation established. The company has recently added additional earthen containment around the well pad perimeter. Addressing the well status the well drilling and completion process is complete with the well in production with additional gas processing equipment located on the well pad in a separate location from the producing wells, there is also a total of 8-400 barrel capacity production fluid tanks on location located inside a plastic lined metal dike area with proper well identification posted at the well head. Preliminary Restoration passed on this day.
0273007951 2014-09-09 Completion Testing No Violations Status check inspection on the completion process found Renegade wireline service on location running in the hole to perforate the 4th stage to be stimulated by US Well Service, a solid bridge plug will be set at 15,453 and perforations will be shot in 6 -10 shot clusters between 15,438 and 15,290. A site walk through found all 500 barrel tanks being used along with all portable generators with proper grounding along with containment placed in critical fluid areas.
0340966111 2018-03-07 Production Wells No Violations Status check inspection accompanied by ODNR Inspector Tom Thomas to document the well status. The well is equipped with a casing and tubing well head assembly with (2) manually operated valves on the tubing well head and one emergency shut down valve on the tubing tree production flow line. The well head casing flow line is also tied into the production flow line however the valves are in the closed position. The 13.375 and 9.625 casing well head assemblies have flowlines with valves and gauges installed to monitor annular pressure. The 13.375 casing well head pressure gauge reads 100 pressure and the 9.625 casing well head reads 0 pounds pressure. On pad total is (6) complete wells supported by (6) gas processing units. Also on location is a production fluid facility consisting of a total of (8) steel construction tanks with a capacity of 400 barrels of fluid each, the tanks are situated inside a polymer lined steel containment dike area.
0443284723 2014-06-20 Casing String Witnessed No Violations The said well was spudded on 06/19/2014 by Express Energys top hole rig with 100 of 32 conductor borehole being drilled and on 06/20/14 100 of 26 conductor was set and cemented to surface by Express Energys cement services using 330 sacks of class A cement- 2% calcium-.50 pound per sack flow seal with 10 barrels of cement returns to surface.
0544444706 2018-03-07 Production Wells No Violations On this day, I accompanied ODNR Inspector William Stolarik. Please refer to his comments for a detailed report. The well is equipped with annular pressure monitoring devices. Concrete barriers surround the wellheads. The facility is gated with an electronic shutdown button on the right-hand side, prior to the pad. The front left of the pad is equipped with (8) 400 barrel steel tanks within containment and an electronic shutdown button. There are (6) gas processing units along the front right side of the pad, and a midstream facility along the front right side, as well.
0803270917 2014-07-09 Drill / Deepen / Reopen No Violations Status check inspection found Patterson Drilling on the hole and the 12.250 diameter 2nd intermediate well bore has been drilled to a completed total depth of 7,147 and the company is pulling out of the hole with the drill string and preparing to run the 9.625 2nd intermediate casing string.
0914278585 2019-01-24 Production Wells No Violations On this day, I am conducting an inspection to document the SIMOPS progress for the plug and abandonment of permit number 4446. I spoke with Antero representative Barney Etcher, and he stated the SIMOPS process is being delayed due creating a standard operating procedure between departments within Antero Resources. Containment is being set in place and steel cages for the producing wells are onsite. The well in question currently has a nightcap in place and no gauges are present. I found the pad gated with signage at the entrance. There are (6) producing wells, (6) gas processing units (GPU), (4) 400-barrel steel production tanks within polymer lined steel containment, and an Emergency Shutdown (ESD) button is present at the pad entrance. Additionally, concrete barriers surround the perimeter of the wellheads. Each well has identification and annular pressure monitoring devices equipped. The 9.625 inch diameter intermediate casing has a pressure of 0 pounds per square inch (psi), and the 13.375 inch diameter surface casing has a pressure of 0 psi.
0930538720 2019-01-29 Production Wells No Violations On this day, I found Antero progressing with the SimOps procedure in preparation for the plug and abandonment of permit number 4446. TekSolv is onsite installing back-pressure valves in the tubing hanger on the (6) producing wells on the pad, prior to installing the steel cages over the wellheads. Fortis Energy is also onsite installing containment and preparing to rig-up, once the SimOps procedures have been completed. I spoke with Antero Representative Barney Etcher during the inspection.
0948612233 2014-07-02 Casing String Witnessed No Violations I am onsite to witness the first intermediate casing string cementing operations. Patterson rig 342 ran 2197 of 13.375 J-55 casing. Allied Oil and Gas Services cemented the casing in place with 394 barrels of class A cement. I witnessed good cement returns to surface.
1082138374 2014-07-16 Drill / Deepen / Reopen No Violations My inspection today finds the drilling rig, Patterson 342 is drilling a 8.75 hole at a depth of 9250.
1403200153 2014-06-19 Drill / Deepen / Reopen No Violations The said well was spudded on this day by Express Energy with a proposed 100 of 32 conductor borehole to be drilled.
1423516816 2015-02-09 Preliminary Restoration No Violations Preliminary Restoration status check inspection found the well is now in production with a gas processing unit in place on location associated to the said well. There a quantity of 8- 400 barrel production tanks on location supporting the 6 producing wells now located on the well pad. Preliminary Restoration was passed on this day.
1479145555 2014-07-22 Drill / Deepen / Reopen No Violations Status check inspection on the drilling process found the current drilling depth to be 14,973 using a 8.5 directional drilling assembly with a current directional azmuth of 146.71 degrees and 3817 units of 3rd party gas present.
1514961832 2014-06-28 Casing String Witnessed No Violations I am onsite to witness surface cementing operations. Patterson rig 342 ran 349 of 18.635 casing. Allied Oil and Gas Services circulated 720 sacks of class A cement into place. I witnessed 65 barrels of cement return to surface.
1691017904 2014-10-27 Completion Testing No Violations Status check inspection on the well completion process found Fortis Well Service work over rig on the hole. The completion plugs have been drilled out to total well depth and the company is circulating the well bore in preparation of pulling the work over drill out tubing string, once completed the company will run 2.875 tubing in the well.

For data sources see[10]

References